e APPENDIX A NOTICE OF VIOLATION Virginia Electric and Power Company Surry 1 and 2 e

Docket Nos. 50-280 & 50-281 License Nos. DPR-32 & DPR-37 As a result of the inspection conducted on March 31 - April 3, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),

the following violations were identified.

A.

10 CFR 50, Appendix B, Criterion XIII as implemented by Topical Report VEP-l-3A, Section 17.2.13 requires measures be established to control preservation of equipment to prevent damage.

Contrary to the above, on April 1, 1981, adequate measures were not estab-1 i shed to contra l protection of equipment to prevent damage in that two examples of scaffolding supported by safety related piping were noted.

This is a Severity Level V Violation (Supplement II.E).

10 CFR 50, Appendix B, Criterion V, as implemented by Topical Report VEP-1-3A, Section 17.2.5 requires activities affecting quality be accomplished in accordance with documented procedures.

Daniels Construction Company Procedure WP-502, Revision 3, "Control of Welding Materials", paragraph 4.4-2 requires welding electrode caddies to be plugged in at all times.

Contrary to the above, on April 1, 1981, activities affecting quality were not accomplished in accordanc~ with documented procedures in that a welder was welding on a main steam support with cold welding electrodes from a cold unplugged caddie.

This is a Severity Level VI Violation (Supplement Il.F). This violation applies to Unit one only.

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including:

(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this,response shall be submitted under oath or affirmation.

Date:APR 3 0 1981 8107240396 810701 PDR ADOCK 05000280 G