ML18139B355
| ML18139B355 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/28/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139B356 | List: |
| References | |
| NUDOCS 8106020174 | |
| Download: ML18139B355 (2) | |
See also: IR 05000280/1981012
Text
__ ,.,!"'
\\.'c.p.R REGui
r
~.;;:,c,
~"o
UNITED STATES
-
$
_
,, 1>~
NUCLEAR REGULATORY COMMISSION
~
,
~
REGION II
,,; f
101 MARIETTA ST., N.W., SUITE 3100
'</1'
o~
ATLANTA, GEORGIA 30303
/)
~
- '*-!<
Virginia Electric and Power Company APR 2 8 1981
ATTN: J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos~0/81~ an~l/81-g)
i
- ', _;';,,"'
\\ a,~
(~J, -. *_';"", I'>.
--
d' <<EC£/V£o'<~
9
MAY 2 9 1981 .... ~~~)
&11 S. l<<JCUAR REGULA TOltY
COMMISSION
/- /
.--(::
~
This refers to the routine inspection conducted by D. J. Burke of this office on
March 2-31, 1981, of activities authorized by NRC License No. DPR-32 and DPR-37
for the Surry facility and to the discussion of our findings held with
Mr. J. L. Wilson at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's
11 Rules of Practice
11 , Part 2, *Title
10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) berieve to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which it
is claimed that the information is proprietary, and should be prepared so that
proprietary information identified in the application is contained in a separate
part of the document.
If we do not hear from you within the specified period,
the report will be placed in the Public Dbcument Room.
Should you have any questions concerning this letter, we will be gJad to discuss
them with you.
- , - -
Enclosure see page 2
8105020/1'1
Q
,e.c.
R. C.
ewis, Acting Director
Division of Resident and
Reactor Project Inspection
',*
-~ _,.
'
APR 2 8 1981
Virginia Electric and Power
Company
Enclosure:
Inspection Report Nos. 50-280/81-12 and
50-281/81-12
cc w/encl:
J. L. Wilson, Manager .
2
l
.