UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JAN 2 8 1981
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
Subject:
Report Nos . .dCf28QJ80-Wand~
This refers to the special inspection conducted by J. J. Lenahan of this office
on December 3-5, 1980, of activities authorized by NRC Operating License Nos.
DPR-32 and DPR-37 for the Surry facility, and to the discussion of our findings
held with J. L. Wilson at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inte.rviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that. you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and .should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosure:
Inspection Report Nos.
50-280/80-42 and 50-281/80-46
cc w/encl:
Sincerely,
u
Reactor Construction & Engineering
Support Branch
J. L. Wilson, Manager
8103040 ~1