ML18139B111

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 81-03, Checklist for Licensees Making Notifications of Significant Events in Accordance W/10CFR50.72. No Written Response Required
ML18139B111
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 02/12/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8103040149
Download: ML18139B111 (6)


Text

e e

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II In Reply Refer To:

RII:JPO 50-338 50-339

~

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 r-r~ r;.; :,....

r C b 1 GJ i :*; *:.: l Virginia Electric and Power Company ATTN: J. H. Ferguson Executive Vice President-Power P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

The enclosed Information Notice 81-03, provides information in the form of a checklist that should be of assistance to nuclear power plants operating staff personnel responsible for making notifications to NRC of significant events in accordance with 10 CFR 50.72.

Enclosures:

Sincerely,

~~~,~----

James P. O'Reilly Director

1.

IE Information Notice No. 81-03

2.

Recently Issued IE Information Notices cc w/encl:

W.R. Cartwright, Station Manager P. G. Perry, Senior Resident Engineer J. L. Wilson, Manager 81-0 3 0 4 0 1.4 9

........ /

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT February 12, 1981 SSINS No. 6870 Accession No.

8011040260 IN 81-03 IE Information Notice No. 81-03:

CHECKLIST FOR LICENSEES MAKING NOTIFICATIONS OF SIGNIFICANT EVENTS IN ACCORDANCE WITH 10 CFR 50.72 Description of Circumstances:

Significant events reported to the NRC Operations Center receive prompt evaluation by NRC technical staff.

To assure that adequate information is obtained for evaluation, in an expedient manner, checklists have been developed for the various types of events and are currently in use by the duty officers manning the NRC Operations Center.

In an effort to communicate to licensees the most useful types of information needed depending on the event, a combined checklist has been developed and is attached to this information notice.

We recognize that this list is not all inclusive, nor are all of its sections applicable to each event.

Rather, it is an attempt to list certain key data elements that, based on past experience, appear to suffice for the vast majority of notifications.

Having this type of information available at the time of notification, or shortly thereafter, wili serve to expedite the notification and evaluation process and make it more efficient. It is not intended that licensees complete the checklist prior to, or as a condition of, making a n?tification.

Instead, the list is intended to inform licensees qf the types of information about events thaf have been useful to the NRC.

We solicit your cooperation in obtaining any other information that may aid NRC in understanding the event and request that you volunteer such informa-tion where appropriate.

Recommendation to Licensees:

This information notice is provided for general information to licensees.

Recipients should review the information for applicability to their facilities.

No specific action or response is requested at this time.

If you have any questions regarding this matter, please contact the Director of the appropriate. NRC Regional Office.

Attachments:

1.

Checklist

2.

Recently issued IE Information Notices

e IN 81-03 CHECKLIST FOR NOTIFICATION OF SIGNIFICANT EVENTS MADE IN ACCORDANCE WITH. 10 CFR 50.72 A.

Identification:

Date Time Name of Person Making Report Licensee Facility Affected Applicable Part of 10 CFR 50.72 ----------------------

B.

==

Description:==

Date of Event Time Description of What Happened ---,----------------------

c.

Consequences of Event: (Complete depending on type of event)

Injuries Fatalities Contamination (personnel) -------- (property) ------------

Overexposures (known/possible) ______________________ _

Safety Hazard (describe - actual/potential) ----------------

Offsite R?diation Levels -~----------,-----------,-----------

Integrated Dose ____________ _ Location -------------

Meterology (wind speed)

From (direction)

Weather Conditions (rain, clear, overcast, temperature) _________ _

Equipment/Property Damage --------------------------

D.

Cause of Event: -------------'----------------------

E.

Licensee Actions:

Taken ------------------------------------

Planned -----------------------------------

2 -

Emergency Plan Activated (Yes/No)

Classification of Emergencyl ----

Resident Inspector Notified (Yes/No)

State Notified (Yes/No) ------

Press Release Planned (Yes/No)

News Media Interest (Yes/No) -------

Local/National ------------

F.

Current Status: (Complete depending on type of event)

1.

Reactor Systems Status ------------------------

Power Level Before Event After Event Pressure __________ Temp. (thot) ______ (tcold) ____ _

RCS Flow (Yes/No)

Pumps On (Yes/No)

Heat Sink:

Condenser Steam Atm. Dump Other Sample Taken (Yes/No).

Activity Level ECCS Operating (Yes/No)

ECCS Operable (Yes/No)

ESF Actuation (Yes/No) -------------------------

PZR or RX Level ------- Possible Fuel Damage (Yes/No) ------

S/G Levels Feedwater Source/Flow Containment Pressure Safety Relief Valve Actuation (Yes/No)

Containment Water Level Indication Equipment Failures ---------------------------

Normal Offsite Power Available (Yes/No) ----------------

Major Busses/Loads Lost ------------------------

Safeguards Busses Power Source ---------------------

D/G Running (Yes/No)

Loaded (Yes/No) 1 See Eme.rgency Action Levels, Appendix 1, NUREG-0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

3 -

2.

Radioactivity Release Liquid/Gas Location/Source Release Rate Duration Stopped (Yes/No)

Release Monitored (Yes/No)

Amount of Release Tech Spec. Limits Radiation Levels in Plant Areas Evacuated

3.

Security/Safeguards 2 Bomb Threat:

Search Conducted (Yes/No)

Search Results Site Evacuated (Yes/No) --------

Intrusion:

Insider Outsider Point of Intrusion Extent of Intrusion Apparent Purpose -----------------------------

Strike/Demonstrations:

Size of Group -------------------

Purpose ----------------------------------

Sabotage:

Radiological (Yes/No)

Arson (Yes/No)

Equipment/Property ----------------------------

Extortion:

Source (phone, letter, etc.) ------------------

Location of Letter Demands ----------------------------------

General:

Firearms involved (Yes/No)

Violence (Yes/No)

Control of Facility Compromised or Threatened (Yes/No) -----------

Stolen/Missing Material ---------------------------

Agencies Notified (FBI, State Police, Local Police, etc.) ---------

Media Interest (present, anticipated) -------------------

2 See 10 CFR 73.71(c), effective April 6, 1981.

Information Notice No. 81-02 81-01 80-45 80-44 80-43 80-42 80-41 80-40 80-39 80-38 RECENTLY ISSUED IE INFORMATION NOTICES Subject Transportation of Radiography Devices Possible Failures of General Electric Type HFA Relays Potential Failure of BWR Backup Manual Scram Capability Actuation of ECCS in the Recirculation Mode While in Hot Shutdown Failures of the Continuous Water Level Monitor for the Scram Discharge Volume at Dresden Unit No. 2 Effect of-Radiation on Hydraulic Snubber Fluid Failure of Swing Check Valve in the Decay Heat Removal System at Davis-Besse Unit No. 1 Excessive Nitrogen Supply Pressure Actuates Safety-Relief Valve Operation to Cause Reactor Depressur-ization Date of Issue 1/23/81 1/16/81 12/17/80 12/16/80 12/5/80 11/24/80 ll/10/8a° 11/10/80 Malfunctions of Solenoid 10/31/80 Valcor Engineering Corporation Cracking in Charging Pump 10/30/80 Casing Cladding OL = Operating Licenses CP = Construction Permits e

IN 81-03 Issued to All Radiography licensees All power reactor facilities with 01 or CP.

All PWR facilities with an 01 or CP All PWR facilities with an 01 or CP All power reactor facilities with 01 or CP All power reactor facilities with 01 or CP All power reactor facilities with.an 01 or CP All power reactor facilities with OL or CP All light water reactor facilities with OL or CP's All PWR facilities with an OL or CP