UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
OEC 3 f' i980
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the routine inspection conducted by J. Blake of this office on
December 2-4, 1980 , of activities authorized by NRC Operating License Nos.
DPR-32 and DPR-37 for the Surry facility, and to the discussion of our findings
held with J. L. Wilson at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed .
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This i tern will be examined during subsequent inspections.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
cc w/encl:
J. L. Wilson, Manager
Sincerely,
C. Murphy, Chief
Reactor Construction and
Engineering Branch