LER 81-004/03L-0:on 810107,reactor Trip Breaker a Failed to Open.Caused by Sporadic Failure of Under Voltage Device Due to Missing Bushing.Under Voltage Device Replaced
ML18139B052
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/30/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139B048 List:
References
LER-81-004-03L, LER-81-4-3L, NUDOCS 8102050582
Download: ML18139B052 (2)


Text

NRC FORM 366 e

U.S. NUCLEAR REGULATORY COMMISSiON (7*77)

-LICENSEE EVENT REPORT CONTROL 8 LOCK:j,_ _*._1-------__,__ _,____l Q (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION!

1 6

~3 I9 vi Al 7

s l Pl s l 1.lCENSE5 CODE 2

14 JG)l o I o I -1 o Io I o I o I a 1- I a I a 1014 I 1 l 1 I 1 I 1 101 I 10 15 I.ICENSE NUMBER 25 26 1.ICENSE TYPE JO 57 CAT SS CON'T

[IC] *,-~~~~~ -1 tK~J *0*1 s 1 o I o I o I 2 1**s I 1 10)1 a I 1 I a I 1 I s l 1 l©I O I 1 1 3 1-o 1 s 11 !G) 7 8 60 61 DOCKET .'!UMBER 68 59 .:VENT DATE 74 75 REPORT DATE ao EVENT DESC81PTION AND PROBABLE CONSEQUENCES@

@II] I With Unit No, 2 at 1QQ% power, "A" Reactor Trip Breaker failed to open :while per -1 forming PT-8.1. T.S.4.1, table 4.1-1, requires PT-8.1 to be performed monthly. This

((ID event is reportable per T. S. 6. 6. 2. b. (2). The "B" Reactor Trip Breaker operated

[)))).!satisfactorily during the performance of PT-8.1. Therefore, the health and safety of

[QJ]J the public were not affected.

@IzJ ffBJ 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCOOE COMPONENT COOE suacoDE SUSCODE

[£TI]

1 a I I I Al@ w@w@ I c I Kl TI BI RI x 1@ w@

9 10 11 12 13 18 19 w@

20 SEQUENTIAL OCCURRENCE AE?ORT REVISION I.En/RO L:VENT YEAR REPORT NO. CODE TYPE NO.

@ Re?oRT NUMBER 18 1 1 I I I I o I oI 41 I /I I oI 3 1 L1J LoJ 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EF.:ECT SHUTDOWN C\ ATTACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON Pl.ANT METHOO HOURS I.,::;/ SUBMITTED FORM :;us. SUPPLIER MANUFACTURER

~@W@

33 34 L.Ll@)

35 LlJ I ol ol ol ol 36 37 40 L1J@.

41 w@

42 W@ *lw I 1 I 2 I o I 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

JA sporadic failure of the under voltage device prevented the Breaker from openin~. A ITiiJ I missing bushing created excessive playin the UV device's linkai;e. Tbe 1rnder voltage o:::IIJ 1device was replaced and the breaker tested.

[IE]

7 8 9 80 FACII.ITY STATUS  % POWER OTHER STATUS @ METHOO OF DISCOVERY DISCOVERY DESCRIPTION L2TIJ LLl I 11 0 I O l@I...____N..... /A_ __ W@I Routine test 8 9 10 12 11 44 45 46 90 ACTIVITY CONTENT Q\

RELEASED OF RELEASE AMOUNT OF ACTIVITY .1.0CATION OF RELEASE @)

~ LLl @) [LJ@.._I_ _N;.;./. ; .; A_ _ _ ___.

a g 10 11 44 45 ao

?:RSONNEI. EXPOSURES ,Q

,'JUMBER A TYP': DESCRIPT10N

[TIa *3JO IO IO 1,J6LLJ@.__.:.:.Ni...;:.A~------------------------

12 13 30

?ERSONNEI. INJURIES ~

,'JUMBER DESCRIPT10N6 C:J:iJ IO IO 10 l@'---__.a:!,NL..:.,A~-----------------------'

7 :3 9 11 12 ao

  • Loss*oF*oR "DAMAGE'TO *FACI UTY (;;'I TYPE DESCRIPTION e;

~ lLJ@) NA a g 10 so

?UBI.ICITY ~ "RC 5- -N v ISSUED/,;-:;\DESCRIPT!ON ~ " ' U c: u L' ~

[ill] LN_Je,,_________..........__________________ II I I I I I I I I II I ;:

a g 10 aa sg 30 _,

0 NAME OF ?9E?ARER J, L. Wilson ?HONE: (804) 357-2941 Ext 210 *J 8 10 205 0 t;<t"1..-

ATTACHMENT 1 SURRY POWER STATION, UNIT 2 DOCKET NO: 50-281 REPORT NO: 81--004/03L--O EVENT DATE: 1-7-81

. TITLE of REPORT: REACTOR TRIP BREAKER FAILURE

1. DESCRIPTION of EVENT:

With Unit No .2 at 100% power, "Au Reactor Trip Breaker failed to open while performing PT-8.1 (Monthly Reactor Protection System Logic).

The "A" Reactor Trip bypass breaker was racked in at this time, The bypass breaker receives a trip signal from "B" train of RPS.

Technical Specification 4.1, table 4.1-1, requiresPT-8.1 to be performed monthly. This event is reportable per Technical Specification 6.6.2.b(2).

2. PROBABLE CONSEQUENCES and STATUS of REDUNDANT REQUIPMENT:

The power to the Control Rod Drive Mechanisms (CRDM~, is fed through two, series reactor trip breakers. Each trip breaker receives a trip signal from independent and redundant actuation trains. The tripping of either breaker will remove power from the CRDM's, thereby inserting the control rods into the core. The "B" Reactor Trip Breaker operated satisfactory during the performance of PT-8.1 and would have performed its intended function. Therefore, the health and safety of the public were not affected.

3. CAUSE:

The failure of "A" Reactor Trip Breaker was caused by a sporadic failure of the under voltage tripping device. The failure of a small retaining clip had allowed a bushing to be dislodged, thereby creating an excessive amount of play in the mechanical tinkage of the under voltage device.

4. IMMEDIATE CORR,E C.'I'IVE ACTION:

The "A" Reactor Trip Breaker was replaced and tested satisfactory.

5. SUBSEQUENT CORRECTIVE ACTION:

The under voltage device was replaced. The malfunctioning under voltage device was operated approximately 100 times in an attempt to duplicate the event. The under voltage device failed to function only once.

6. ACTION TAKEN TO PREVENT RECURRENCE:

Electrical Maintenance procedures will be revise

  • d to a dd ress the inspection o[ the retaining devices.
7. GENERIC IMPLICATIONS:

.;Si:i,n,ce :th~e,.,\_Othe-r.d.m:de:r,.---31,ciJ*.t-age -.-devices -were inspected and failed to show any similar problems, this appe2rs to be an isolated case.