ML18139B044

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-280/80-34 & 50-281/80-37 on 800707-0829 & Notice of Violation
ML18139B044
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/17/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B041 List:
References
NUDOCS 8102050364
Download: ML18139B044 (2)


See also: IR 05000280/1980034

Text

In Reply Refer To:

RII:DJB

50-280/80-34

50-281/80-37

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

OCT 1 71980

Virginia Electric and Power Company

ATTN: J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by D. J. Burke of this office on July 7

through August 29, 1980 of activities authorized by NRC Operating License Nos.

DPR-32 and DPR-37 for the Surry facility, and to the discussion of our findings

held with J. L. Wilson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:*

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be piaced in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public di~closure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified ~n the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

  • -

-

. *---------. _,_

Der 1 71sao

Virginia Electric and Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

Sincerely,

e.c. I - *

R. C. ~ing Chief

Reactor Operations and Nuclear

Support Branch

I.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/80-34

and 50-281/80-37

cc w/encl:

J. L. Wilson, Manager

-

          • .. - -- ..