Forwards IE Insp Repts 50-280/80-12 & 50-281/80-13 on 800416-18 & Notice of Deviation
ML18139A643
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/16/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139A641 List:
References
NUDOCS 8008130399
Download: ML18139A643 (2)


See also: IR 05000280/1980012

Text

,,

I

-~

e

e

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

In Reply Refer To:

RII:RMC

50-280/80-12

50-:281/80-13

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAY 16 1980

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

~ichmond, VA

23261

Gentlemen:

This refers to the inspection conducted by R. M. Compton of this office on

April 16-18, 1980 of activities authorized by NRC License Nos. DPR-32 and DPR-37

for the Surry facility, and to the discussion of our findings held with J. L.

Wilson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Four new unresolved items resulted from this inspection and are discussed in the

enclosed report.

These items will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission, and have safety signifi-

cance.

This item is identified in the Notice of Deviation enclosed herewith as

Appendix A.

Please provide us in writing within 20 days of your receipt of this

letter your comments including a description of corrective actions that have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date corrective actions were or will be completed.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this l~tter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If*we do not hear from you in4.his regard within

the specified period, the report will be placed in the'Publit"';_DN.=ument Room.

~80081S03~1

e

Virginia Electric and Power Company

-2-

r

MAY 1 0 fie6

~ ..

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Murp y,

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of D~viation

2.

Inspection Report Nos. 50-280/80-12

and 50-281/80-13

cc w/encl:

J. L. Wilson, Manager

P. 0. Box 315

Surry, VA

23883

,