UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
FEB 21 1980
In Reply Refer To:
RII:JDW
50-280/80-2
50-281/80-4
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by J. D. Wilcox of this office on
January 29 - February 1, 1980, of activities authorized by NRC Operating License
Nos. DPR-32 and DPR-37 for the Surry facility, and to the discussion of our
findings held with W. L. Stewart at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report.
This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
\\'
Virginia Electric and Power
Company
-2-
FEB 21 1980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosure:
Inspection Report Nos. 50-280/80-2
and 50-281/80-4
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
Sincerely,
nt, Acting
Reactor Construction and Engineering
Support Branch