Forwards IE Insp Rept 50-280/79-60 on 791015-19 & Notice of Violation
ML18136A387
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/26/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18136A386 List:
References
791226, NUDOCS 8001160096
Download: ML18136A387 (2)


See also: IR 05000280/1979060

Text

-* **.r

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

Nov 2 6 7919

In Reply Refer To:

RII:SAE

50-280/79-60

,.

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

This refers to the inspection conducted by S. A. Elrod of this office on

October 15-19, 1979, of activities authorized by NRC Operating License

No. DPR-32 for the Surry facility, and to the discussion of our findings held

with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references*

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter will be placed in

the NRC's Public Document Room.

If this letter contains any information that

you believe to be proprietary, it is necessary that you make a written applica-

tion within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the reasons

on the basis of which it is claimed that the information is proprietary, and

should be prepared so that proprietary information identified in the application

is contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the letter will be placed in the Public

Document Room.

.... ,

Virginia Electric and Power

Company

-2-

Nov 2 6 1979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

Sincerely,

e.c. I

R. C. ~ing Chief

Reactor Operations and Nuclear

Support Branch

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-280/79-60

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883