Text
..
To:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
SEP O 7 1979
Virginia Electric and Power Company
Attn:
W. L. Proffitt
Senior Vice President, Power
Post Office Box 26666
Richmond, Virginia 23261
Gentlemen:
This refers to the inspection conducted by J. l- Blake of this office on
July 30 through August 3, 1979 of activities authorized by NRC License
Nos. DPR-32 and DPR-37 for the Surry Nuclear Power facility, and to the
discussion of our findings held with J. L. Wilson at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
These
items and references to pertinent requirements are listed in the Notice'
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's "Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's .Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
\\
..
Virginia Electric and
Power Company
-2-
SEP O 7 1979
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosures:
Sincerely,
C * E . Murntw--;;-, -t1trn
Reactor Construction and
Engineering Support Branch
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/79-45
and 50-281/79-64
cc w/enclosures:
W. *1. Stewart, Manager
Post Office Box 315
Surry, Virginia 23883