Text
e
e
In Reply Refer To:
RII:BRM
50-280/79-30
50-281/79:-47
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303 *
JUL
3 1979
Virginia Electric and Powe-r Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by B. R. Meisitt of this office on
June 4-8, 1979; of activities authorized by NRC Operating Licence DPR-32 and
DPR-37 for the Surry 1 and 2 facilities, and to the discussion of our findings
held with W. L. Stewart at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report.
These items will be examined .during subsequent inspec-
tions.
During .. the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed
herewith as Appendix A.. Corrective actions to p.revent recurrence were
completed prior to the conclusion of this inspection; therefore, a reply is
not requested.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
e
Virginia Electric and Power
Company
-2-
JUL
3 1979
- -
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosures:
Sincerely,
ec. I
R. C. ~ef
Reactor Operations and Nuclear
Support Branch
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/79-30
and 50-281/79-47
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA