Forwards IE Insp Repts 50-280/79-27 & 50-281/79-44 on 790531-0601.No Noncompliance Noted
ML18130A507
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/20/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18130A508 List:
References
NUDOCS 7908280162
Download: ML18130A507 (2)


See also: IR 05000280/1979027

Text

In Reply Refer To:

RII:DJP

50-280/79-27

50-281/79-44

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JUN 2 0 1979

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

_Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office on

May 31 - June 1, 1979, of activities authorized by NRC License Nos. DPR-32 and

DPR-37 for the Surry Units 1 and 2 facility, and to the discussion of our findings

held with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC' s Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in ~he Public Pocument Room.

\\"...,,.-,.:.~,....~ . __ ,_..

V,.,,,..

',_..,._.._,....,_,.,_. * ., **'..,.;, ** ..,. -- A,,.,._.,,-.,, *'" *... * .,_

'---~-**-*'--'-/. _.,...,._._,.,.- .. _...,._ .. , '-' ----*-*>.,.,#.-*--** .* .,._._ ---'*' -- ****-*******-* * ~----.

    • -** .-, ~-* *-*~*-* * -***-**--* ,.--'-~---*-----"'-"'-*** -** **.... - -

,-

--r

/

e

e

JUN 2 0 197.

Virginia Electric and Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosure:

Sincerely,

Ac~i7'~~

.,v~ck T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

--Inspection Report Nos. 50-280/79-27

and 50-281/79-44

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883