MONTHYEARML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19092A1152019-04-0101 April 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043) ML19092A1142019-04-0101 April 2019 NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031) ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 2023-09-05
[Table view] Category:Inspection Report
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 IR 05000324/20210032021-11-10010 November 2021 Team Electric Plant; Integrated Inspection Report 05000324/2021003 and 05000325/2021003 IR 05000324/20210102021-10-22022 October 2021 Temporary Instruction 2515/193 Inspection Report 05000324/2021010 and 05000325/2021010 IR 05000324/20214012021-09-28028 September 2021 Security Baseline Inspection Report 05000324/2021401 and 05000325/2021401 IR 05000324/20210052021-08-26026 August 2021 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2021005 and 05000325/2021005) IR 05000324/20210122021-08-24024 August 2021 Biennial Probleem Identification and Resolution Inspection Report 05000324/2021012 and 05000325/2021012 IR 05000324/20210022021-08-11011 August 2021 Integrated Inspected Report 05000324/2021002 and 05000325/2021002 IR 05000324/20214022021-06-16016 June 2021 Material Control and Accounting Program Inspection Report 05000324/2021402 and 05000325/2021402 (OUO Removed) IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 IR 05000324/20210112021-06-0202 June 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000324/2021011 and 05000325/2021011 IR 05000324/20210012021-05-14014 May 2021 Integrated Inspection Report 05000324/2021001 and 05000325/2021001 IR 05000324/20200062021-03-0303 March 2021 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2020006 and 05000324/2020006 IR 05000324/20200042021-02-0505 February 2021 Integrated Inspection Report 05000324/2020004 and 05000325/2020004; 07200006/2020002 IR 05000324/20203012021-01-22022 January 2021 NRC Operator License Examination Report 05000325/2020301 and 05000324/2020301 IR 05000324/20200032020-11-0606 November 2020 Integrated Inspection Report 05000324/2020003 and 05000325/2020003 IR 05000324/20204012020-10-30030 October 2020 Security Baseline Inspection Report 05000324/2020401 and 05000325/2020401 IR 05000324/20204032020-10-14014 October 2020 Bruswick Steam Electric Plant - Review of Power Reactor Target Sets Report 05000324-2020403 and 05000325-2020403 IR 05000324/20200052020-08-24024 August 2020 Updated Inspection Plan for Brunswick Steam Electric Plant Units 1 and 2, NRC Inspection Report 05000325/2020005 and 05000324/2020005 IR 05000324/20200022020-08-11011 August 2020 Integrated Inspection Report 05000324/2020002 and 05000325/2020002 IR 05000324/20200112020-06-24024 June 2020 U. S. Nuclear Regulatory Commission Evaluation of Changes, Tests, and Experiments Report 05000324/2020011 and 05000325/2020011 IR 05000324/20200012020-05-12012 May 2020 Integrated Inspection Report Report 05000324/2020001 and 05000325/2020001 IR 05000324/20200102020-04-0606 April 2020 NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000324/2020010 and 05000325/2020010) IR 05000324/20190062020-03-0303 March 2020 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2019006 and 05000324/2019006 IR 05000324/20190042020-02-11011 February 2020 NRC Inspection Report 05000324/2019004 and 05000325/2019004; 07200006/2019002 IR 05000324/20194122019-11-22022 November 2019 U.S. Nuclear Regulatory Commission Security Inspection Report 05000325/2019412 and 05000324/2019412 IR 05000324/20190122019-11-20020 November 2019 NRC Temporary Instruction 2515/194 Inspection Associated with NRC Bulletin 2012-01, IR 05000325/2019012 & 05000324/2019012 IR 05000324/20190032019-11-0707 November 2019 Integrated Inspection Report - 05000324/2019003 and 05000325/2019003 IR 05000324/20190112019-10-16016 October 2019 Design Basis Assurance Inspection (Teams) Inspection Report 05000324/2019011 and 05000325/2019011 2023-08-04
[Table view] |
Text
ML18116A011 Nielsen, Adam From: Nielsen, Adam Sent: Wednesday, April 25, 2018 3:17 PM To: 'thomas.sherrill@duke-energy.com' Cc: Grzeck, Lee (Lee.Grzeck@duke-energy.com); Loo, Wade; Panfel, Jacob
Subject:
Document request for upcoming RP inspection Attachments: BRU_2018-02_RP_doc_request.pdf The request is attached. Please contact myself or Wade Loo if you have any questions. I was assigned to another inspection, so I wont be on this one. It will be Wade Loo and Jacob Panfel.
Please forward the request to applicable groups (probably chemistry/environmental).
- Thanks, Adam (404) 997-4660 1
Brunswick Steam Electric Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of June 4 - 8, 2018, the NRC will perform a baseline Radiation Safety Inspection at the Brunswick Steam Electric Plant (NRC Inspection Procedures 71124.06, 71124.07, and 71151).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 23, 2018.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade Loo at 404-997-4727, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Inspection Dates: June 4 - 8, 2018 Documents Due to Region II by: May 23, 2018 Inspection Procedures: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program (REMP)
IP 71151 Performance Indicator Verification (Public Radiation Safety Cornerstone Only)
Lead Inspector: Wade Loo Sr. Health Physicist US NRC Region II (404) 997-4727 Wade.Loo@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection and places additional burden on licensee staff.
Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Miscellaneous
- 1. List of primary contacts for each inspection area w/phone numbers
- 2. Corrective action program procedure(s)
- 3. Procedures for gathering and reporting NRC Performance Indicator (PI) data.
- 4. Most recent version of the Offsite Dose Calculation Manual (ODCM).
- 5. Previous version of the ODCM 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
- 1. Procedures for collection, analysis, release, and dose evaluations for gaseous and liquid effluents
- 2. List of changes made to radioactive effluent processing/discharge systems since May 27, 2016
- 3. List of out of service (OOS) time periods for any effluent monitors that required compensatory sampling since May 27, 2016.
- 4. The last two calibration records for the following effluent monitors:
o Main Stack Radiation Monitoring System (all detectors, all ranges) o Liquid Radwaste Discharge Monitor o U1 Reactor Building Ventilation Monitor (low-range PING system) o U1 Reactor Building Ventilation Monitor (high-range gross gamma GM-tubes)
- 5. Certificates for the radioactive sources used to calibrate the detectors in item 5.
- 6. The last two calibrations of the Main Stack flow monitoring instrumentation
- 7. The last two surveillances (in-place filter tests and charcoal tests) performed on the Unit 1 Augmented Off-gas System
- 8. The last two gaseous effluent release permits and the last two liquid effluent release permits
- 9. Most recent audit, self-assessment, and/or review of the radioactive effluent monitoring program
- 10. List of CRs generated since May 27, 2016, as a result of gaseous and liquid effluent processing and/or ODCM related activities. This should be a list of corrective action documents containing a CR number and brief description, not full CRs 71124.07 - Radiological Environmental Monitoring Program (REMP)
- 1. Collection schedule for REMP samples during the week of inspection and contact numbers for collection staff.
- 2. Procedures for:
a) collection and analysis of environmental samples b) calibration and maintenance of REMP air and/or water samplers c) calibration of meteorological monitoring instruments (wind speed & direction, air temperature, etc.)
d) periodic meteorological instrumentation surveillance requirements
- 3. The last two calibration records for REMP air and water sampling equipment (as applicable)
- 4. The last two calibration records for each meteorological monitoring instrument on the primary tower (wind speed, wind direction, and air temperature)
- 5. Most recent inter-laboratory comparison program results (environmental lab)
- 6. List of instruments used to count REMP samples (environmental lab). Instruments will be selected from this list for review of their QC charts/trending reports.
- 7. List of systems, structures, or components (SSCs), identified as credible mechanisms for the potential release of licensed material to the groundwater. Please include risk-ranking of the SSCs, as applicable.
- 8. List of any non-radioactive systems that have become contaminated since May 27, 2016.
- 9. Copies of any reports to the NRC (via 10CFR50.72 or other reporting requirements) regarding abnormal onsite spills/leaks of radioactive material since May 27, 2016.
- 10. List of 10 CFR 50.75(g) entries made since May 27, 2016.
- 11. Recent results of the groundwater monitoring program (at least the last two quarters)
- 12. Most recent audit, self-assessment, and/or review of REMP activities
- 13. Most recent audit of lab used to process REMP samples
- 14. List of CRs generated as a result of REMP activities since May 27, 2016. Include all CRs related to voluntary reporting of onsite spills/leaks of radioactive material. This should be a list of corrective action documents containing a CR number and brief description, not full CRs