r_:-*
In Reply Refer To:
RII:JDW
50-281/79-22
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
APR Z 3 1979
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
QJtJ~
G~ --.;is ,,,.
This refers to the inspection conducted by J. D. Wilcox of this office on
April 2-5, 1979, of activities authorized by NRC License No. DPR-37 for the
Surry Power Station, Unit No. 2 facility, and to the discussion of our findings
held with W. L. Stewart at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report.
This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. * If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room .
I*
, __ .
.
.
.
~ *-*---- *-
(j
APR 2 3 1979
Virginia Electric and Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosure:
Inspection Report No. 50-281/79-22
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
Sincerely,
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
--*------*-*---*-* -**------ .---*---**----*-******--**-**
.. ****--..---****-** -*-- ...... - ..