ML18114A470

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-06A, Review of Operational Errors & Sys Misalignments Identified During TMI Incident
ML18114A470
Person / Time
Site: Surry, North Anna  
Issue date: 04/14/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 7904270580
Download: ML18114A470 (2)


Text

--

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303 APR l 4 1979 In Reply Refer To:

Virginia Electric and Power Company Attn:

Mr. W. L. Proffitt Senior Vice President Power Operations P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:

Enclosed is IE Bulletin No. 79-06-A, which requires action by you with regard to your Westinghouse designed pressurized water reactor facility(ies) with an operating license.

Based on our current understanding of the Three Mile Island accident sequence, and discussion with the designer of your pressurized water reactor, we have reason to believe that pressurizer level indication in your facility may not provide reliable information regarding level in the reactor coolant system under certain transient or accident conditions.

You should immediately instruct your operating personnel accordingly.

In addition you should consider this possibility in responding to the enclosed bulletin.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely,

.-7~C~,-J

~':£¥:.%a=!;

  • Director

Enclosure:

IE Bulletin 79-06-A 7904270580

e Virginia Electric and Power Company cc w/

Enclosure:

W.R. Cartwright, Station Manager Box 402 Mineral, Virginia 23117 P. G. Perry Senior Resident Engineer P. 0. Box 38 Mineral, Virginia 23117 W. L. Stewart, Manager P. 0. Box 315 Surry, Virginia 23883 APR 1 4 1979