Forwards Insp Repts 50-272/96-17 & 50-311/96-17 on 961103-1214 & Notice of Violation
ML18102A741
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/08/1997
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102A742 List:
References
NUDOCS 9701130115
Download: ML18102A741 (3)


See also: IR 05000272/1996017

Text

'

i'

Mr .. Leon R. Eliason

Chief Nuclear Officer and President

Nuclear Business Unit

January 8, 1997

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/96-17, 50-311 /96-17

NOTICE OF VIOLATION

.

D'""'~*~Jlr. Eliason:

On December 14, 1996, the NRC completed an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection, including a radiation

controls inspection of the Salem Unit 1 steam generator replacement outage conducted

between November 3 and December 14, 1996.

During the 6-week period covered by this inspection, we noted conservative decisions by

your operators and thorough preparation for refueling Salem Unit 2. We also observed

improved performance in maintenance and that the quality of safety evaluations had

improved as a result of better procedures and good training. We noted, however, one

violation of NRC requirements. The NRC inspectors identified that plant staff connected

safety related and non-safety related portions of the control air system without first

determining whether it involved an unreviewed safety question, as required by 10 CFR

50.59.

The violation is cited in the enclosed Notice of Violation, and the circumstances

surrounding the violation are described in detail in the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

During the inspection period, inspections were conducted of the radiation controls program

implementation during outage conditions for both Salem units. The inspection also

included the review of the Salem Unit 1 steam generator replacement and transportation

off site of a steam generator for disposal. A noteworthy weakness was identified in the

resolution of issues identified in radiological occurrence reports. Please respond to this

report within 30 days of receipt of this letter and indicate your planned corrective actions

to address this weakness.

9701130115 970108

PDR

ADOCK 05000272

G

PDR

...

Mr. Leon R. Eliason

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50-272, 50-311

License Nos: DFf..**70, DPR-75

Enclosures:

Notice of Violation

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch 3

Division of Reactor Projects

Inspection Report 50-272/96-17, 50-311 /96-17

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co .

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. MacFarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

I ...

..

Mr. Leon R. Eliason

Distribution w/encl:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP *

Nuclear Safety Information Center (NSIC)

G. Kelly, DRS

N. Della Greca, DRS

Allegations File Rl-96-A-228

Allegations File Rl-96-A-136

D. Screnci, PAO (1)

NRC Resident Inspector

L. Cunningham, NRR

D. Barss, NRR.

PUBLIC

L. Nicholson, DRP

G. Barber, DRP, R. DePriest, DRP

Distribution w/encl: (Via E-Mail)

L. Olshan, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR (RPC)

R. Frahm, Jr., NRR (RKF)

\\branch3\\9617 .sal

3

To receive a copy of this do u e. t, indicate in the box: "C" = Copy without attachment/enclosure

"E" = Copy with attachment/enclosure

"N" = No copy

OFFICE

NAME

DATE

OFFICIAL RECORD COPY