Forwards Insp Repts 50-272/96-12 & 50-311/96-12 on 960811- 0914 & Notice of Violation
ML18102A442
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/01/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102A443 List:
References
NUDOCS 9610080260
Download: ML18102A442 (3)


See also: IR 05000272/1996012

Text

J 'f

.. ,.

I

'

October 1, 1996

Mr. Leon R. Eliason

President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/96-12, 50-311 /96-12

NOTICE OF Vl.OLATION

Dear Mr. Eliason:

On September 14;1 1996, the NRC completed an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection.

During the 5-week period covered by this inspection period, your conduct of activities at

the Salem facilities was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls. We are

concerned, however, about a violation of NRC requirements. Specifically, your staff

missed an opportunity to adequately correct a problem regarding reactivity control

requirements identified by a Senior Reactor Operator. Although the safety consequences

of this issue was low, we are concerned that your organization exhibited symptoms of past

poor performance to justify problems rather than resolve the issue.

This violation is cited in. the enclosed Notice of Violation, and the circumstances

surrounding the violation are described in detail in the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch 3

Division of Reactor Projects

9610080260 961001

PDR

ADOCK 05000272

G

PDR

I'

Mr. Leon R. Eliason

2

Enclosures:

Notice of Violation

Inspection Report 50-272/96-12, 50-311/96-12

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. MacFarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

Mr. Leon R. Eliason

Distribution w/encl:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

Nuclear Safety Information Center (NSIC)

L. Nicholson, DRP

S. Barber, DRP

G. Kelly, DRS

N. Della Greca, DRS

D. Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

L. Olshan, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

R. Frahm, Jr., NRR

3

DOCUMENT NAME: a:9612.sal

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

TE

9'r!'Jl6

OFFICIAL RECORD COPY