Text

~-

~

Public Service

, Electric and Gas

  • Company r

E. C. Simpson Public Service Electric anD EC C2mBalSSS P.O. Box 236, Hancocks Bridge, NJ 08038 LR-N95246 609-339-1700 Senior Vice President - Nuclear Engineering United states Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

UPDATED FINAL SAFETY ANALYSIS REPORT, INTERIM REVISION 14 SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 and 50-311 Revision 14 to the Salem Updated Final Safety Analysis Report (UFSAR) is hereby submitted in accordance with a corrective action committed to in Public Service Electric and Gas Company's letter, LR-N95139, in response to Notice of Violation (NOV),

50-354/95-10.

As discussed in the NOV and response, certain changes to the UFSAR were not incorporated during previous UFS_>R revisions as required by 10CFR50.71(e).

While the NOV was recorded on the Hope Creek docket only, the issue and committed corrective action applies to Salem as well.

UFSAR Revision 14 is an interim submittal which includes UFSAR changes to the text, tables, and figures that were part of the NOV-identified backlog of changes which should have been included in previous UFSAR revisions and which are required to reflect current plant configuration.

The backlog changes included in Revision 14 are those plant configuration changes which were implemented prior to December 12, 1993, six months prior to the date of filing of Salem's last UFSAR update, Revision 13.

A brief summary and explanation of each change is provided in.

In addition to the backlog UFSAR changes, Revision 14 also includes current cycle UFSAR changes that were approved as of December 1, 1995.

However, because Revision 14 is an interim revision intended primarily for backlog incorporation, it does not reflect all plant configuration changes implemented up to six months prior to the date of this submittal.

This 10CFR50.71(e) requirement will be satisfied by submittal of the regularly scheduled UFSAR update, Revision 15, for Salem on June 12, 1996.

96010300{4 PDR ADOCK K

03003-5

~

Printedon

~

Recycled Paper 951228 05000272 PDR

\\,.\\

~

-/,;

Document Control Desk LR-N95246 DEC 2 8 1995 2

Should there be any questions with regard to this submittal, please do not hesitate to contact us.

Attachment (1)

~

E. c. Simpson Senior Vice President -

Nuclear Engineering c

(Document Control Desk - Original & ten copies)

Mr. T. T. Martin, Administrator - Region I

u. s. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan (Cover letter only)

Licensing Project Manager - Salem

u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. c. s. Marschall (X24)

USNRC Senior Resident Inspector - Salem Mr. Kent Tosch, Manager, IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625

STATE OF NEW JERSEY COUNTY OF SALEM

)

)

)

REF:

LR-N95246 SS.

E. c. Simpson, being duly sworn, states that he is Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that in accordance with 10CFR50.71(e) (2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 10CFR50.. 59 but not previously submitted to the Commission.

Subscribed and Swor~~ore me this CJ g day of ~

, 1995 My Cominission expires on EUZABErn J. KIDD NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 25, 2000

'. 12/29/95 PllljC SERVICE ELECTRIC & GAS.ANY

~OCUMENT DISTRIBUTION NOTIC.

PAGE 1 OF 1

TRANSMITTAL: DOG 0434243 TO: NUCLEAR REGULATORY COMMISSION DOCUMENT CONTROL DESK I llllll 11111111111111111111111111111111111111 COPYHOLDER: SFSR0007 WASHINGTON, DC 20555 DESCRIPTION: SALEM FSAR UPDATE REV 14 PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE/MANUAL.

SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR DESTROYED.

CLASS PROC PROC SHT/

DOCUMENT ID VOL INST REV STAT TYPE FORMAT SFSR-LOEP 000 014 A SFSR H

SFSR-TOC 000 014. A SFSR H

PLEASE SIGN AND DATE THIS NOTICE TO ACKNOWLEDGE RECEIPT AND RETURN WITHIN 5 WORKING DAYS TO:

PSE&G DOG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038 QTY 001 001 TO CHANGE YOUR DISTRIBUTION STATUS, PLEASE CHECK THE APPROPRIATE SPACE BELOW:

REMOVE FROM DISTRIBUTION CHANGE COPYHOLDER INFORMATION SEE MY INSTRUCTIONS ABOVE COPYHOLDER SIGNATURE:

DOG USE ONLY:

DATA ENTRY COMPLETED:

  • J LR-N95246 ATTACHMENT 1 Summary of Salem UFSAR Revision 14 changes

j Salem UFSAR Changes 12/27/95 Affected Sections 1.2 1.3, 8.1, 8.2, 8.3, 7.3 2.3 3, 3.5, 15.2 3.5 3.5 3.6 3.6, 9.2, 10.3 3.10, 5.5, 6.3, 9.3 Affected Pages/

Tables/Figures Fl.2-1 1.3-6,-8,-9, 7.3-16, 8-ii, 8-iv, 8.1-1,-2,-4, 8.3-2,-3,-4,-5b,-16,-17,-18,-

20 F8.2-2, F8.3-l,-2,-3a,-

4,-4a,-4c T2.3-16 Pgs. 1,2&3 of3 3-xi, 3.5-16, -17, 15.2-59, -60, -62, T3.5-l,-2,-

3 3.5-1 3.5-6, 3.5-7 3.6-50 3.6-18,-36,-39,-40, 9.2-17, 10.3-4

5. 5-3 7,-38,-3 9,-42a; 6.3-14, 9.3-21,-23,-29,-

30,-37-40, 42, 44, 46, 47, 48, T9.3-6 Sht 6,7,8&10of12; T3.10-l Sht 8&9of12

  • Page 1

Description Update Figure to show Circulating Water Intake Structure Substation Housings Adds Switchyard Project Upgrades Reduces Detail in the UFSAR for Meteorological Instrumentation Equipment Updates Documentation of the Replacement of the Low Pressure Turbine Rotors.

States that the Rod Control System Motor Generator Set Flywheels Will Not Produce Missiles Under Any.Anticipated Accident Condition Corrects Description of the Alternate water supply for Auxiliary Feedwater System from a Remote Controlled to a Manual Operation Addresses a moderate energy pipe failure in the 10 Ton C02 Room and the Diesel Fuel Storage Tank areas.

Carbon Steel Piping was Replaced with a Chrome Alloy Material for Improved Resistance to Erosion/Corrosion in Multiple Systems Implements the Boric Acid Concentration Reduction Program at Unit 1

.Salem UFSAR Changes 12/27/95 Affected Sections 3.10, 5.5, 6.3, 9.3 3A, 9.5 5.1, 5.2, 5.5, 9.3, Appendix A 5.2 5.5 5.5, 5.6, 7.7 6.2 6.2 6.2 6.2 Affected Pages/

Tables/Figures 5.5-37, -38, -39, -42a, 6.3-14, 9.3-21, -23, -

29, 9.3-30, -37 thru 40, 9.3-42, -44, -46 thru -

48,-63, T3.10-l Sht 8,9 of 12, T9.3-6 Sht 4,6,7,8&10of12 3A-16, 3A-51, 9.5-40 5.5-56, A-10, A-lOa, T5.2-8 Pgs 1&2 of2 F5.l-6A Sht l; F9.3-3A Sht 1 5.2-28 5.5-20 through -22 5.5-21, 5.5-59a, 5.6-4, 5.6-5, 7.7-21 F6.2-44 6.2-85 T6.2-10 Sht 3 of9, T6.2-13 sht l Of2 F6.2.44 Page 2

Description Implements the Boric Acid Concentration Reduction Program at Unit 2 Increase in Tech Spec Minimum Volume Required in Diesel Fuel Oil Storage Tanks per License Amendments 170 and 152 for Units 1and2 Reflects Removal of Pressurizer Power Operated Relief Valve Loop Seals Reflects Change in Reactor Coolant System Water Chemistry Specification for the Modified Lithium Chemistry Program Reflects Reactor Coolant system Resistance Temperature Detector Bypass Manifold Deletion per License Amendments 84 and 56 for Units 1and2.

Reflects Modification to the Residual Heat Removal System Mid Loop Monitoring Per Generic Letter 88-17 Reflects Modification to the Fuel Transfer Tube Blind Flange Closure for Unit 2 Add Additional Reference Sources to UFSAR for Integrated Leakage Rate Testing Replaces the motor, motor overload heaters, and motor gear set for the actuator on Safety Injection System Valves 1SJ135 and 2SJ135 and Changes Valves to Locked Open in Modes 1to4.

Reflects Modification to the Fuel Transfer Tube Blind Flange Closure for Unit 1

1--

Salem UFSAR Changes 12/27/95 Affected Sections 6.2, 7.3 6.3 7.2 7.2, 15.2 7.3 7.5 7.7 7.7, 3.3, 4.3 7.10, 7, Appendix A

8.2, 8.3 Affected Pages/

Tables/Figures 6.2-62, 7.3-28 T6.3-l T7.2-2 Sht 1 of 4 7.2-23, 15.2-26 T7.3-4 Pgs.

4,5,6,7,8,l l,13,18, 19,2 0,21,22,24,38,45,&45A of47 7.5-11 7.7-16,17 7-v, 7-vii, 7.7-21; T3.3-7,-8, T4.3-4,-5 7-vb, 7-vii, 7.10-1, 7.10-2, 7.10-3, 7.10-4, 7.10-5, a-ii, a-iii, A-74, A-75, A-76, A-77, A-78, A-79, T7.10-l Sht 1 & 2 of2, T7.10-2 Sht I & 2 of2, T7.10-3, TA-2 sht I & 2 of2, TA-3 sht 1 & 2 of2 FA-5, A-6 F8.2-2, F8.3-l

  • Page 3

Description Change Failure Position of Control Air System Outboard Isolation Valves, CA 3 3 0 Per License Amendments 164 and 145 for Units 1 and 2.

Correction of the Design Code Designation for the Refueling Water Storage Tank Corrects the Function Description of Permissive P-7 from Pressurizer High Pressure to Pressurizer High Level.

Inserts Reactor Trip on Two Open Reactor Coolant Pump Breakers Above P-7 Per License amendments 87 and 60 for Units 1 and2 Reflects the 125 VDC Distribution Cabinet Wiring Modifications Clarifies Statement Regarding Safety Parameter Display System Display of Regulatory Guide 1.97 Variables.

Reflects Enhanced Failure Detection and Operability Determination for the Overhead Annunciator System Transfers Seismic Instrumentation and Meteorological Instrumentation from Salem Ul/U2 Tech Specs to UFSAR Reflects Safety Parameter Display System Installation and Revises Technical Support Center Description Reflects Salem Unit I 50/500 KV Main Transformer Replacement

Salem UFSAR Changes 12/27/95 Affected Sections 8.2, 8.3 8.3 8.3 8.3 8.3 8.3 9.2 9.2 9.2 9.2 9.3 9.3 Affected Pages/

Tables/Figures F8.2-2, F8.3-2 8iv F8.3-3b, F8.3-4b 8-iii, 8.3-20, T8.3-4A

&-4B 8.3-8, T8.3-2,T8.3-3 8.3-12 8.3-17 T9.2-l, T9.2-4 Shts 1&2 of2 9.2-22 9.2-28 9.2-7,-8 9.3-40; T9.3-6 Sht 8 of 12 9.3-60

  • Page 4

Description Reflects Switchyard Improvements for 13 KV substations Adds Figure to Correctly Represent Unit 2 Non-Vital 4KV-460V and 230V Switchgear Deletes Containment Penetration - Over Current Protection Device Tables. This Information is now Controlled in Calculations Reflects a Revision to the Diesel Generator Load Calculation.

Adds the Syncrocloser Check Relay as an automatic protective device in service during start-up and operation of a diesel generator following a manual start.

Changes the onsite power system battery ratings Reflects Throttling the Service Water Inlet Isolation Valve to the Component Cooling Heat Exchanger to Alleviate Service Water Pump Net Positive Suction Head Concerns Adjusts the Reactor Coolant Pump Bearing Temperature Alarms Correction of Table Reference in Section 9.2.2.9 Reflects Service Water Pump Auto-Start Setpoint Changes Reflects the Abandonment in Place of the 12 Chemical and Volume Control System Hold-Up Tank Reflects Post Accident Sampling system Ion Chromatograph Modification for Boron In-Line Analysis in the PASS Chemical Analysis Panel for Better Accuracy

Salem UFSAR Changes 12/27/95 Affected Sections 9.3, 10.4, 11.3, 11.4 9.4 9.4, 1.2,5.1 9.5, 8.3 9.5, 3A 9.5 9.5 9.5, 12.3, 13.1, 13.4, 17.2 10.3 10.4 Affected Pages/

Tables/Figures 9.3-57,-58,-60, 11.3-14, 11.4-14, 11.4-15, 11.4-19, 11.4-20; 11.4-21, Tl0.4-1, Tll.4-1 Sht 2 of 4, Tl 1.4-3 Sht 1&2 of2 Fl0.4-18A, Sht 1 of2; Fll.3-lA, Sheet 2 9.4-39, 9.4-40, 9.4-41 9.4-la, 9.4-4 Fl.2-2, F5.l-7, F9.4-la, 9.4-lb 9.5-38, 8.3-17, T8.3-6 F8.3-5 sht 1 of2 9.5-42, 3A-5la 9.5-36 9.5-28,-40 9.5-2,-4, 12.3-l,-2,-3,-

3a,-3b, 13.l-l,-la,-2,-

6a,-8,-9,-l8a,-19, 13.4-2, 17.2-2,-3,-4,-6,-7,-8,-

13, Fl3. l-l,-2,-7,-8a,-8e, F17.2-l 10.3-2 10.4-20

  • Page 5

Description Deletes Radiation Monitoring System Channels 1R8, 1Rl4, 1R21, 1R22, 1R31B, 1R31C and 1R35. These are Non-Safety Related Monitors that Perform No Control Functions Upgrades the Diesel Generator and Control Area Ventilation Systems Adds an Operators' Ready Room Near the Control Rooms Reflects Upgrade of Emergency Lighting System Adds Emergency Diesel Generator Fuel Oil Test Specification per License Amendments 148 and 126 for Units 1 and 2

Enhances the Public Address System Reflects Diesel Generator Day Tank Level Alarm and Transfer Pump Control Set Points.

Reflects Personnel Title Changes and Radiation Protection/Chemistry Dept.

Changes Correction of Main Steam System Design Code for Feedwater Isolation Valves Adds Auxiliary Feedwater System Design Codes and Standards

Salem UFSAR Changes 12/27/95 Affected Sections 10.4 10.4 10.4 10.4 10.4 11.2, 9.3, 11.5 11.4 11.4, 10.4 11.5 15.2,15.3 15.3 Affected Pages/

Tables/Figures 10.4-13 10-iv, 10.4-17, -21, -

23, -24, -27, Tl0.4-2a, Tl0.4-2b Fl0.4-17a 10.4-2, -3 10.4-2,10.4-3 10.4-2 9.3-23, 11.2-4,-5,-6,-8,-

9,-10,-11,-12,-13, 11.5-1, 11.5-2, 11.5-3, 11.5-4 Tll.2-1, Tll.2-2, Tll.2-3 Shts 1&2 of2, Tll.2-4 Shtsl&2 of2, Tll.2-5 Tll.4-1Sht3 of4 11.4-18 Fl0.4-18b Sht 1 of2 11.5-3 15.2-2,-3; 15.2-61, 15.3-1, 15.3-14,-15,-16 15.3-12

  • Page 6

Description Clarification ofFeedwater Piping Design Code Reflects Auxiliary Feedwater Control Valves Maximum Flow Reduction Reflects Unit 2 Operational Changes to the Condenser Air Removal System Vacuum Pumps Reflects Unit 1 Operational Changes to the Condenser Air Removal System Vacuum Pumps Reflects Improvements to Main Condenser Waterboxes, Tube Sheets and Waterbox Ladder Replacement Provides Revisions to Solid, Liquid and Gaseous Radwaste Processing Systems and Discharges Corrects Table for Unit 1 Plant Vent Radiation Monitor Equipment Removal of 2 Non-Safety Related, Seismic Category 3 Radiation Monitoring System Channels Adds the Low Level Radwaste Storage Facility Changes Accident Analysis to Evaluate Uncontrolled Rod Cluster Control Assembly at Full Power as a Single Failure Revision to Reflect the Change in Reactor Trip on Reactor Coolant Pump Breaker Open from 1/4 to 2/4 Logic Above 10 Percent Power per License Amendments 87 and 60 for Units 1and2

~alem UFSAR Changes 12/27/95 Affected Sections 17.2 Appendix A Appendix A Appendix A Affected Pages/

Tables/Figures 17.2-1 thru-8a,-12,-

13,-14,-16,-22,-24,-28,-

29,-38,-39,-40 A-40, A-52 thru A-55 A-24 A-ii, TA-1Shts1, 2, &

3 of3, TA-2Shts1 &

2 of2, TA-3 Shts 1 &

2 of2 Page 7

Description Allows Electronic Retention of Computer Generated Records, including Electronic Approvals. Also Changes Selected QA Oversight Practices to More Effectively Monitor Implementation of the Nuclear Department Procedure System.

Modifications in the Solid Radwaste System, Process Radiation Monitoring and Environmental Radiation Monitoring Reflects Control Change for Pressurizer Relief Tank Containment Isolation Valves Deletes Previous Technical Support Center Description

Remove T3.10-l (6 and 7 f 9) 3A-16/17 3A-50/51 3A-5la/5lb INSERTION INSTRUCTIONS VOLUME 2 Remove II-3 Revision 14 December 29, 1995

/

Remove 5-vii/viii F5. l-6a (sheet 1)

F5. l-7 T5.2-8 (1 and 2 of 2)

T5.2-28 5.5-19/20 5.5-21122 5.5-37/38 5.5-39140 5.5-42a/42b 5.5-55156 5.5-59/59a 5.5-60 5.6-314 5.6-516 6.2-61/62 6.2-84/85 T6.2-10 (4 of 12)

T6.2-13 (1 of 2)

F6.2-44 6.3-14/15 T6.3-l (1 of I)

SGS-UFSAR INSERTION INSTRUCTIONS VOLUME 3 Insert 5-vii/viii F5.l-6a (sheet 1)

F5.l-7 TS.2-8 (1 and 2 of 2)

TS.2-28 5.5-19120 5.5-21122 5.5-37/38 5.5-39140 5.5-42a/42b 5.5-55156 5.5-59/59a 5.5-60 5.6-3/4 5.6-5/6 6.2-61/62 6.2-84/85 T6.2-10 (4 of 12)

T6.2-13 (l of 2)

F6.2-44 6.3-14115 T6.3-l (1 of l)

II-4 Revision 14 December 29, 1995

Remove 7-v/va 7-vb/vi 7-vii/viii 7.2-23/24 T7.2-2 (1 of 4) 7.3-15/16 7.3-27/28 T7.3-4 (4 through 8; 11, 13, and 18 through 22; 24 and 25; 38; 45 of 47) 7.5-11112 7.7-17/17a 7.7-21/22 8-i/ii 8-iii 8-iv SGS-UFSAR INSERTION INSTRUCTIONS VOLUME 4 II-5

. Insert 7-v/va 7-vb/vi 7-vii/viii 7.2-23/24 T7.2-2 (1 of 4) 7.3-15/16 7.3-27/28 T7.3-4 (4 through 8; 11, 13, and 18 through 22; 24 and 25; 38; 45 of 47) 7.5-11112 7.7-17/17a 7.7-21/2la 7.7-21b/22 T7.7-3 (1of1)

T7.7-4 (1of1)

T7.7-5 (1of1)

T7.7-6 (1of1) 7.10-112 7.10-3/4 7.10-5 T7.10-1 (1 and 2 of 2)

T7.10-2 (1and2 of2)

T7.I0-3 (1of1) 8-i/ii 8-iii 8-iv Revision 14 December 29, 1995

Remove 8.1-1/2 8.1-3/4 F8.2-2 8.3-1/2 8.3-3/4 8.3-5b/6 8.3-7 /8 8.3-11/12 8.3-15/16 8.3-17 /18 8.3-19/20 T8.3-2 (l of 1)

T8.3-3 (l of l)

T8.3-4A (I through 13 of 13)

T8.3-4B (l through 12 of 12)

T8.3-6 (l of I)

F8.3-l F8.3-2 F8.3-2a F8.3-3a F8.3-3b F8.3-4 F8.3-4a F8.3-4b F8.3-4c F8.3-5 (sheet l and 2 of 2) 9.2-7 /8 9.2-17/18 9.2-21/22 SGS-UFSAR INSERTION INSTRUCTIONS VOLUME 4 (cont)

II-6 8.1-1/2 8.1-3/4 F8.2-2 8.3-1/2 8.3-3/4 8.3-5b/6 8.3-7 /8 8.3-11/12 8.3-15/16 8.3-17/18 8.3-19/20 T8.3-2 (l of 1)

T8.3-3 (l of l)

T8.3-4A (l of l)

T8.3-4B (l of 1)

T8.3-6 (I of 1)

F8.3-l F8.3-2 F8.3-2a F8.3-3a F8.3-3b F8.3-4 F8.3-4a F8.3-4b F8.3-4c F8.3-5 (sheet 1 and 2 of 2) 9.2-7 /8 9.2-17/18 9.2-21/22 Revision 14 December 29, 1995

Remove 9.2-27/28 T9.2-1 (1 of 1)

T9.2-4 (1 and 2 of 2)

SGS-L"FSAR INSERTION INSTRUCTIONS VOLUME 4 (cont)

Insert 9.2-27/28 T9.2-1 (1 of 1)

T9.2-4 (1 and 2 of 2)

Il-7 Revision 14 December 29, 1995

Remove 9.3-21/22 9.3-23/24 9.3-29/30 9.3-37 /38 9.3-39/39a 9.3-39b/40 9.3-47 /48 9.3-57 /58 9.3-59/60 9.3-63 T9.3-6 (4, 6, 7 and 8 of 12)

F9.3-3a (sheet l) 9.4-1/la 9.4-3/4 9.4-39/39a 9.4-39b/40 F9.4-la F9.4-lb 9.5-1/2 9.5-3/4 9.5-35/36 9.5-37 /38 9.5-39/40 9.5--41/42 IO-iii/iv 10.3-1/2 I0.3-3/4 SGS-UFSAR INSERTION INSTRUCTIONS VOLUME 5 Insert 9.3-21/22 9.3-23/24 9.3-29/30 9.3-37 /38 9.3-39/39a 9.3-40/41 9.3-47 /48 9.3-57 /58 9.3-59/60 9.3-63 T9.3-6 (4, 6, 7 and 8 of 12)

F9.3-3a (sheet l)

II-8 9.4-1/la 9.4-3/4 9.4-39/39a 9.4-*39b/40 F9.4-la F9.4-lb 9.5-1/2 9.5-3/4 9.5-35/36 9.5-37 /38 9.5-39/40 9.5-41/42 IO-iii/iv 10.3-1/2 I0.3-3/4 Revision 14 December 29, 1995

INSERTION INSTRUCTIONS VOLUME 6 Remove Insert 10.4-l /2 10.4-l /2 10.4-3/4 10.4-3/4 10.4-13/13a I0.4-13/I3a 10.4-17/18 10.4-17/18 10.4-19/20 10.4-19/20 10.4-21/22 10.4-21/22 10.4-23/24 10.4-23/24 10.4-27 10.4-27 T10.4-2A (l of I)

TI0.4-2B (I of I)

Fl 0.4-l 7a Fl 0.4-l 7a FJ0.4-18a(l of2)

FI0.4-18a (I of 2)

Fl0.4-18b (I of 2)

FI0.4-18b (I of 2) 11.2-3/4 11.2-3/4 l 1.2-5/6 11.2-5/6 11.2-7/8 11.2-7/8 l 1.2-9/10 11.2-9/10 ll.2-10a/10b 11.2-JOa/IOb 11.2-11/12 11.2-11/12 11.2-13/14 11.2-13/14 Tl 1.2-1 (l of 1)

Tl 1.2-1 {1 of 1)

Tl 1.2-2 (l of 1)

Tl 1.2-2 {1 of 1)

Tl 1.2-3 {1 and 2 of 2)

Tl 1.2-3 (l and 2 of 2)

Tl 1.2-4 (I and 2 of 2)

Tll.2-4 (land 2 of2)

Tl 1.2-5 (I of I)

Tl 1.2-5 {1 of 1) 11.3-13/14 11.3-13/14 11.4-13/14 11.4-13/14 l 1.4-15/16 l 1.4-15/16 11.4-17/18 l 1.4-17 /18 11.4-19/20 11.4-19/20 11.4-21/22 l 1.4-21/22 II-9 SGS-UFSAR Revision 14 December 29, 1995

Remove Tll.4-1 (1 through 4 of 4)

Tl 1.4-3 (1 and 2 of 2) 11.5-1/2 11.5-3/4 12.3-112 12.3-3/3a 12.3-3b/3c 13-i 13.1-1/la 13.1-6a/6b 13.1-7/8 13.1-9/10

13. l-18a/18b 13.1-19/20 Fl3.l-l F13.l-2 Fl3.l-7 Fl3.1-8a Fl3. l-8e 13.4-1/2 SGS-UFSAR INSERTION INSTRUCTIONS VOLUME 6 (cont)

II-10 Insert Tll.4-1 (1 through 4 of 4)

Tl 1.4-3 (1 and 2 of 2) 11.5-1/2 11.5-3/4 12.3-1/2 12.3-3/3a 12.3-3b/3c 13-i 13.1-1/la 13.1-6a/6b 13.1-7/8 13.1-9/10

13. l-18a/18b 13.1-19/20 F13.l-1 Fl3.1-2 Fl3.l-7 Fl3.1-8a Fl3. l-8e 13.4-l/2 Revision 14 December 29, 1995