Forwards Insp Repts 50-272/94-31 & 50-311/94-31.Violations Noted.Violations Involve Procedural Adequacy Which Affected Testing of Containment Spray Sys
ML18101A471
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/17/1995
From: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18101A472 List:
References
NUDOCS 9501240302
Download: ML18101A471 (3)


See also: IR 05000272/1994031

Text

January 17, 1995

Mr. Leon R. Eliason

President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ

08038

SUBJECT:

SALEM RESIDENT INSPECTION NOS. 50-272/94-31; 50-311/94-31

Dear Mr. Eliason:

The enclosed report documents an inspection for public health and safety,

conducted by Mr. C. Marschall, Senior Resident Inspector and other members of

the NRC resident and regional staff at the Salem Generating Station, for the

period between November 6, 1994 and December 17, 1994. The findings of this

inspection were previously discussed with Mr. J. Summers, General Manager-

Sal em Operations, and other members of your staff.

The report indicates performance improvement relative to the attention that

your staff is directing toward identifying and communicating degraded

equipment and system performance to appropriate management personnel. The

report also identifies improved interaction among your engineering,

operations, and maiDtenance organizations relative to the diagnoses and

resolution of equipment and system problems. -'

During this period, we also observed a "work-around" condition that your

organization willingly accommodated.

Specifically, in order to diminish the

number of fault alarms that could not be attributed to a specific system

fault, your operations organization deactivated the automatic test insertion

circuitry affecting the Safeguard Equipment Control (SEC) system.

While

active automatic test insertion circuitry is not required for operability of

the SEC, the action contributed to the need to initiate a controlled shutdown

of Unit 1 due to stuck test switches which affected SEC operability. The

condition was resolved before complete shutdown.

However, the situation did

require maneuvering of reactor power which may have been unnecessary if the

root cause of the frequent circuit fault alarms had been determined.

Within the scope of this inspection, the report also describes an violation

involving procedural adequacy which affected the testing of containment spray

system.

Since we consider that a basis for enforcement discretion exists in

accordance with NRC Enforcement Policy (10 CFR 2, Appendix C, VII.B), the

apparent violation is not cited.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this report and its enclosures will be placed in the NRC Public Document Room.

No reply to this letter is required.

9501240302 950117

PDR

ADOCK 05000272

G

PDR

Mr. Leon R. Eliason

2

Your cooperation with us is appreciated.

Docket Nos. 50-272; 50-311

Sincerely,

Original Signed By:

John R. White, Chief

Projects Section No. 2A

Division of Reactor Projects

Enclosure:

NRC Inspection Report Nos. 50-272/94-31; 50-311/94-31

cc w/encl:

J. Hagan, Vice President-Operations

S. LaBruna, Vice President - Engineering and Plant Betterment

C. Schaefer, External Operations Nuclear, Delmarva Power & Light Co.

J. Summers, General Manager, Salem Operations

R. Hovey, General Manager, Hope Creek Operations

F. Thomson, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

A. Giardino, Acting Manager, Quality Assurance

B. Hall, Acting Manager, Nuclear Safety Review

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. J. Curham, Manager, Joint Generation Department,

Atlantic Electric Company

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

D. Screnci, PAO (2)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

State of Delaware

State of Maryland, Public Service Commission

Mr. Leon R. Eliason

3

bee w/encl:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

bee w/encl: (Via E-Mail)

L. 01 sh an, NRR

W. Dean, DEDO

J. Stolz, PDl-2, NRR

IPAS

M. Callahan, OCA

DOCUMENT NAME:

a:94-3lsal.rev

To receive a copy of this document, incficate in the box: "C' = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure *

co y

OFFICE

NAME

DATE

/95

OFF CIAL RECORD COPY