Confirms Dates of 930816-20,30 & 0903 for Partial Edsfi at Plant.Purpose of Insp to Determine Whether Electrical Distribution Sys Capable of Performing Intended Functions as Designed,Installed & Configured During Accident Conditions
ML18100A511
Person / Time
Site: Salem  
Issue date: 07/28/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
References
NUDOCS 9308100023
Download: ML18100A511 (4)


Text

Docket Nos. 50-272 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

ELECTRICAL DISTRIBUTION SYSTEM FUNCTIONAL INSPECTION (EDSFI) FOR SALEM, UNITS 1 AND 2 This letter confirms the dates of August 16-20, 1993, and August 30 - September 3, 1993, for a partial EDSFI at Salem, Units 1 and 2. A partial EDSFI is being conducted because of a previous electrical inspection conducted by the NRC Region I staff in November 1987, and a self-conducted EDSFI completed by PSE&G in September 1992. Our plans for this inspection were discussed with your staff during a telephone call between Messrs. Frank Thomson and Brian Thomas of your organiz.ation and Mr. Leonard Cheung of the NRC Region I office. The inspection will take place at the_ Salem plant site.

A management entrance meeting is scheduled for 10:00 a.m. on August 16, 1993, at the plant site in Hancocks Bridge, New Jersey. The management exit meeting is also tentatively scheduled for 2:00 p.m. on September 3, 1993, also at the plant site; The purpose of this inspection is to determine whether the electrical distribution* systems (EDS) at Salem Units 1 and 2 are capable of performing their intended functions as designed, installed, and configured during all plant operating and accident conditions. Your self-conducted EDSFI will be used as a reference in this inspection.

To support the scope of the inspection, we request that you provide us at least two copies of the documents identified in the enclosure by August 2, 1993, to be picked up by Mr. Leonard Cheung at the inspection site. We also request that PSE&G be prepared. tO provide, on August 16, 1993, following the entrance meeting, a brief presentation to the inspection team, which addresses the design of the station electrical distribution system and associated support systems, and the self-conducted EDSFI.

r-*

9308100023 930728 *-**

PDR ADOCK 05000272 p

PDR~

OFFICIAL RECORD COPY G:SALEMEDS

JUL 2 8 1993 Mr. Steven E. Miltenberger 2

Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this inspection, you can contact Mr. Leonard Cheung at 215-337-5296 or Mr. William Ruland at 215-337-5376.

Sincerely, Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety

Enclosure:

Salem Units 1 and 2 EDSFI Document List cc w/encl:

J. J. Hagan, Vice President, Nuclear Operations C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

C. Vondra, General Manager - Salem Operations F. Thomson, Manager, Licensing and Regulation R. Swanson, Gep.eral Manager - QA and Nuclear Safety Review J. Robb, Director, Joint Owner Affairs A. Tapert, Program Administrator R. Fryling, Jr., Esquire M. Wetterhahn, Esquire J. Isabella, Director, Generation Projects Department, Atlantic Electric Company Consumer Advocate, Office of Consumer Advocate Tom Dwyer, Public Safety Consultant, Lower Alloways Creek Township K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Jersey OFFICIAL RECORD COPY G:SALEMEDS

Mr. Steven E. Miltenberger 3

bee w/enel:

Region I Docket Room (with concurrences) bee w encl: (Via E-Mail)

J. Stone, NRR S. Dembek, NRR V. McCree, OEDO C. Miller, PDI-2, NRR 4Sc RI:DRS Cheung/dmg 05105193

~

RI:DRS RI:DRS Rul1Jf--

07~/93 Durr 01f2:193 OFFICIAL RECORD COPY G:SALEMEDS JUL 2 8 1993

SALEM UNITS 1 AND 2 Item No.

Documents

1.

Self-conducted EDSFI report.

2.

Questions and answers generated during the self-conducted EDSFI.

3.

Current status of your corrective actions of the findings of the above inspection.

4.

Station one-line diagrams for ac and de systems.

5.

P&IDs of ventilation systems associated with the electrical distribution system, including diesel generator rooms, battery rooms, and switGhgear rooms. *

6.

P&IDs of diesel generator support systems such as fuel, cooling water, lube oil, and* air.

7.

Djesel generator surveillance test doc~ments for the last two tests.

8.

Capacity tests and surveillance test documents of safety-related batteries (including charger and inverter testing, if any) for the last two years.

9.

Relay-setpoint control procedures, relay-setpoint master list, and protective relays calibration procedures *

10.

Preventive maintenance and test procedures for the 4160 Vac and 480 Vac air and molded case circuit breakers.

Please arrange documents according to the item _number given above to facilitate locating specific documents by the inspection team members.

OFFICIAL RECORD COPY G:SALEMEPS