Advises That Documentation Re Simulator Certification Per 10CFR55.45(b)(2),submitted in ,Complete
ML18095A535
Person / Time
Site: Salem  
Issue date: 10/12/1990
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
NUDOCS 9010240390
Download: ML18095A535 (3)


Text

Docket Nos.

50-272 50-311 Mr. Steven E. Miltenberger October 12, 1990 e DISTRIBUTION:

Vice President and Chief Nuclear Officer Public Service Electric and Gas Company P. 0. Box 236 OLB RF CENTRAL FI LES OLB STAFF JWRoe CThomas JS tone Hancocks Bridge, NJ 08038

Dear Mr. Miltenberger:

SUBJECT:

SIMULATOR CERTIFICATION FOR 10 CFR 55.45(b)(2) - SALEM GENERATING STATION UNITS 1 AND 2 We have completed our review of your submittal dated December 28, 1989 wherein you submitted NRC Form 474, "Simulation Facility Certification, 11 for the Salem Generating Station Units 1 and 2 simulator in compliance with 10 CFR 55.45(b)(2).

This included review of the additional information provided in your August 8, 1990 letter. The staff finds the documentation to be complete and requires no further information on this matter at this time.

Our review was only to ensure completeness of your documentation, and did not extend to verification of the accuracy of the data or statements made in the certification, nor does it provide NRC approval of the acceptability of your simulator for use in administering operating tests.

NRC approval is neither granted nor required in the case of such certification because Public Service Electric and Gas Company has the responsibility for regulatory compliance with respect to your plant-referenced simulator.

However, 10 CFR 55.31(a)(4) states that the NRC may accept certification that a license applicant has successfully completed a Commission-approved training program that is based on a systems approach to training and that uses a simulation facility acceptable to the NRC under 55.45(b) in lieu of the details of an applicant's qualifications, training and experience. Because you have certified your simulation facility in accordance with 55.45(b)(l)(ii),

your simulation facility is acceptable for the purposes of 55.31(a)(4).

cc: See next page Sincerely,

/S/

James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II DATE

10 lo') /90
/O I 5 /90
lo I l0 /90

/&; t:J-'t9o

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 Docket Nos.

50-272 50-311 Mr. Steven E. Miltenberger October 12, 1990 Vice President and Chief Nuclear Officer Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, NJ 08038

Dear Mr. Miltenberger:

SUBJECT:

SIMULATOR CERTIFICATION FOR 10 CFR 55.45(b)(2) - SALEM GENERATING STATION UNITS 1 AND 2 We have completed our review of your submittal dated December 28, 1989 wherein you submitted NRC Form 474, "Simulation Facility Certification, 11 for the Salem Generating Station Units 1 and 2 simulator in compliance with 10 CFR 55.45(b)(2).

This included review of the additional information provided in your August 8, 1990 letter. The staff finds the documentation to be complete and requires no further information on this matter at this time.

Our review was only to ensure completeness of your documentation, and did not extend to verification of the accuracy of the data or statements made in the ce.rtification, nor does it provide NRC approval of the acceptability of your simulator for use in administering operating tests.

NRC approval is neither granted nor required in the case of such certification because Public Service Electric and Gas Company has the responsibility for regulatory compliance with respect to your plant-referenced simulator.

However, 10 CFR 55.31{a)(4) states that the NRC may accept certification that a license applicant has successfully completed a Commission-approved training program that is based on a systems approach to training and that uses a simulation facility acceptable to the NRC under 55.45(b) in lieu of the details of an applicant's qualifications, training and experience. Because you have certified your simulation facility in accordance with 55.45(b)(l)(ii), your simulation facility is acceptable for the purposes of 55.3l(a){4).

cc: See next page Sincerely,

~t.b James C. Stone, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II

l.

(

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Bishop, Cook, Purcell & Reynolds 1400 L Street NW Washington, DC 20005-3502 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection CN 415 Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street

  • Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 Salem. Nuclear Generating Station Richard B. McGlynn, Corrmission Department of Public Utilities State of New Jersey 101. Commerce Street Newark, NJ 07102 Regional Administrator 9 Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Light Company 800 King Street Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:

Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486