ML18095A248
| ML18095A248 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/30/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18095A249 | List: |
| References | |
| NUDOCS 9006060083 | |
| Download: ML18095A248 (4) | |
See also: IR 05000272/1990009
Text
Docket Nos.
50-272
50-311
Public Service Electric and Gas Company
ATTN:
Mr. Steven E. Miltenberger
Vice President and
Chief Nuclear Officer
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
MAY 3 O 1990
SUBJECT: REQUALIFICATION PROGRAM EVALUATION REPORT NOS. 50-272/311 90-09(0L-RQ)
On April 3-5, 1990, the NRC administered requalification examinations to
employees of your company who operate the Salem Generating Stations Unit 1 and
2.
The evaluation was conducted in accordance with Revision 5 to NUREG-1021,
Operator Licensing Examiner Standards, ES-601, "Administration of NRC Requali-
fication Program Evaluations.
11
The evaluation had two purposes: evaluation of
the effectiveness of the licensed operator requalification training program at
maintaining the competency of the licensed operators, and examination of the
individual operators to determine if they would satisfy the regulatory require-
ment of passing an NRC administered examination prior to license renewal.
At
the conclusion of the examination, any generic findings that were identified
as a result of the examination were discussed with those members of your staff
identified in the enclosed report.
As a result of this evaluation, your requ~lification progr~m has been assigned
an overall program.rating of
11 satisfactory.
11
All operators passed all parts
of the examination.
Based on observations from this requalification examination, the NRC expressed*
concern over the distribution of the control room operators responsibilities
during response to certain events (see Section 6.C for details).
At the exit
meeting, a representative of your staff stated that they would review operator
responsibilities.
You are requested to respond within thirty (30) days of
receipt of this letter specifying your plan of action regarding this concern.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
\\
~---
Public Service Electric & Gas Co.
2
Should you have any questions regarding this examination, please contact me at
215-337-5291.
Sincerely,
Original Signed By-~
ROBERT M. GALLO
Robert M. Gallo, Chief
Operations Branch
Division of Reactor Safety
Enclosure:
Requalification Program Evaluation Report No. 50-272/311 90-09
(OL-RQ) w/Attachments 1, 2, 3 and 4
cc w/enclosure and attachments 1, 2, 3 and 4:
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
L. K. Miller, General Manager - Salem Operations
B. A. Preston, Manager, Licensing and Regulation
General Manager - Nuclear Safety Review
R. Fryling, Jr., Esquire
M. J. Wetterhahn, Esquire
S. Lingerer, Manager, Joint Generation Projects Department,
Atlantic Electric Company
Licensing Project Manager, NRR
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
Pl~nt Training Manager
Director, Nuclear Training
Senior Resident Inspector
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New Jersey
bee w/enclosure and attachments 1, 2, 3 and 4:
Master Exam File (with all attachments)
bee w/enclosure; without attachments 1, 2, 3 and 4:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
P. Eselgroth, DRS
D. Silk, DRS
R. Bellamy, DRSS
DRP Section Chief
J. Caldwell, NRR
OFFICIAL RECORD COPY
SILK/90-07/4/20/90 - 0001.0.1
04/19/90
Public Service Electric & Gas Co.
3
bee w/encl .; w/o Attachments 1, 2, 3, and 4:
Chief, OLB DLPQE, NRR
Contract Examiner Supervisor (Sonalysts)
OL File
DRS Files (5)
~~ ~6.V/~l),j
DRS:~ C,r;pdl~~
Silk/ajk/dmg
Eselgroth
05/29/90
05/ /90
OFFICIAL RECORD COPY
SILK/90-07/4/20/90 - 0002.0.0
04/19/90
Public Service Electric & Gas Co.
2
Enclosure:
Requalification Program Evaluation Report No. 50-272/311 90-09
(OL-RQ) w/Attachments 1, 2, 3 and 4
cc w/enclosure and attachments 1, 2, 3 and 4:
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
L. K. Miller, General Manager - Salem Operations
B. A. Preston, Manager, Licensing and Regulation
General Manager - Nuclear Safety Review
R. Fryling, Jr., Esquire
M. J. Wetterhahn, Esquire .
S. Ungerer, Manager, Joint Generation Projects Department,
Atlantic Electric Company
Licensing Project Manager, NRR
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
Plant Training Manager
Director, Nuclear Training
Senior Resident Inspector
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New Jersey
bee w/enclosure and attachments 1, 2, 3 and 4:
Master Exam File (with all at~achments)
bee w/enclosure; without attachments 1, 2,
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
P. Eselgroth, DRS
D. Silk, DRS
R. Bellamy, DRSS
DRP Section Chief
J. Caldwell, NRR
Chief, OLB DLPQE, NRR
Contract Examiner Supervisor (Sonalysts)
OL File
DRS Files (5)
DRS:RI
fj'JiSi 1 k/aj k/dmg
.\\...Pfr4/30/90
T/Jjc;o
DRS:RI
Eselgroth
)11/µ
OFFICIAL RECORD COPY
3 and 4:
SILK/90-07/4/20/90 - 0001.1.0
05/23/90