ML18094B337
ML18094B337 | |
Person / Time | |
---|---|
Site: | Salem ![]() |
Issue date: | 02/07/1990 |
From: | Miller L Public Service Enterprise Group |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
88-3-19, NUDOCS 9003160055 | |
Download: ML18094B337 (12) | |
Text
'.
Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station U. S. Nuclear Regulatory Commission
.Document Control Desk Washington, DC 2055_5
Dear Sir:
SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 SUPPLEMENTAL SPECIAL REPORT 88-3-19 February 7, 1990 This supplemental Special Report addresses additional fire barrier penetration seal. impairments which have not been restored to functional status within seven (7) days.
These impairments have been identified by the Penetration Seal Task* Force.
This report has been prepared in accordance with the reporting requirements.of.
Technical Specification Action Statement 3.7.11.a pursuant to Technical Specification 6.9.2.
MJP:pc Distribution 90(>3:1600~:;'::. 900:;~*07 PDR ADOCK 05000272 S
!Ji::°j:~JtdL L. K. Miller General Manager -
Salem Operations
,;/JP
/
'!1 95-218915Mi 12-88
UNIT 1 SPECIAL REPORT *3-19 PLANT IDENTIFICATION:
Salem Generating Station - Units 1 & 2 Public Service Electric & Gas Company Hancock~s Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than 7 Days Event Date{s):
7/20/88, 8/9/88, 9/7/88, 10/11/88, 11/7/88, 12/7/88, 1/5/89, 2/6/89, 3/7/89, 4/6/89, 5/9/89, 6/7/89, 7/12/89, 8/8/89, 9/7/89, 10/7/89, 11/8/89, 12/8/89, 1/9/90, 2/8/90 Report Date:
3/7/90 This report was initiated by Incident Report Nos.88-268, 88-531,88-536, 88-537, 88-544~ 89-050,89-075, 89-086,89-091, 89-092,89-127, 89-287,89-349, and 89-472.
CONDITIONS PRIOR TO OCCURRENCE:
N/A DESCRIPTION OF OCCURRENCE:
As identified in PSE&G letter NLR-N88037 dated March 4, 1988, PSE&G has initiated a comprehensive review/inspection of fire barrier penetration seals.
Due to the additional review by the Penetration Seal Task Force, penetrations found impaired are not being repaired within seven days as specified by Technical Specification Action Statement 3.7.11.a.
This report summarizes the task force findings and Technical Specification 4.7.11 surveillance activity findings associated with inadequate penetration seals for both Unit 1 and Unit
- 2.
The inadequate peneiration seals found, to the date of issue of this report, include:
On July 13, 1988 two fire Barrier cable penetration were found degraded.
The penetration contained electrical sleeving containing an electrical cab1e surrounded by foam type fire sealant.
The area (approximately 1/8" gap and 1/4" gap respectively) surrounding the electrical sleeves were not sealed thereby constituting an impaired seal.
The fire barrier is in the east wall of the.100' Elevation Relay Room.
On July 25, 1988 three 13} degraded fire bar~ier cable penetration seals were found on the south wall in the 100' Elevation Relay Room.
Two (2} of these penetrations are 3" in diameter and the other is 5.5" (located -is feet above the floor).
The 3" penetrations contain fire wrapped cabling.
This fir~ wrap extends over the penetration.
There.is no foam behind the fire wrap.
It provides a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> rated barrier, however, the wall is a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barri~r. The 5.5" penetration contains a 4" conduit surrounded by foam.
The foam contains an 1/8" gap at the base 6f the cortduit.
I
U:q.i t 1 SPECIAL REPORT *-3-19 DESCRIPTION OF OCCURRENCE:
(cont'd)
On July 28, 1988 one (1) 3.5" degraded fire barrier cable penetration seal was found on the north wall in the 100' Elevation Relay Room.
The penetration contains cabling surrounded by foam.
The foam contains an 1/2" diameter hole.
Between August 2, 1988 and August 30, 1988, 138 additional penetration seals were*found impaired of which 134 penetrations are located in the Unit 1 Relay Room and 4 penetrations are located iri the Unit 1 lA 125 V Battery Room.
The penetrations range in size from -3 inches to -6 inches in diameter.
The nature of the impairments include 6 with no seal, 14 with a hole in the seal (unknown cause}, 2 with foreign material imbedded in the seal (one imbedded. with a rag and the other with duct tape},
30 with a void in the seal (due to inadequate quantity of foam injection upon installation), 6 with apparent degradation (e.g.,
cable pulled through) 47 with inadequate color/cell structure (reference LER 272/88-013-00) and 32 that are not deep enough into the penetration per de~ign (less than 6 inches}.
Between August 31, 1988 and February 28, 1990, 6797 Unit 1 penetration seals and 3895 Unit.2 penetration seals were reviewed. Of these, 2712 penetration seals were determined to be impaired.
The majority of penetrations range in size from -3 inches to -6 inches in diameter.
Ther~ were 291 penetrations which were larger than 6 inches in diameter.
These penetrations ranged from 3"x5" to 169"x25".
Page 3 of this report contains a* table of the penetration seals found impaired,_between August 2, 1988 and February *2s, 1990, in relation to the fire zone where they were found.
The impairment designator terms include:
No Seal NOS Hole in Seal HOL Void in Seal VIS Depth Not Great Enough DPT Color/Cell Structure CEL Seal Degradation DEG Foreign Material Imbedded FMT Planned Impairment PIM An hourly fire watch patrol had been established for the above areas previously due to other fire protection concerns.
Therefore, the requirements of Tech. Spec. Action Statement 3.7.11.a are met.
Unit 1 Technical Specification 3.7.11 states:
"All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional."
Unit 1 Te~hnical Specification Action Statement 3.7.11.a states:
"With one or more of the above required fire barrier penetrations non-functional, within one hour either establish a
tJ?:lIT 1 SPECIAL REPORT.-3-19 DESCRIPTION OF OCCURRENCE:
(cont'd) continuous fire watch on at least one side of the affected penetration, or verify the OPERABILITY of fire detectors on at least one side of the non-functional fire barrier and establish an hourly fire watch patrol.
Restore the non-functional fire barrier penetration(s) to functional status within 7 days :or, in lieu of any o.ther report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the_ non-functional penetration and plans and schedule for restoring the fire barrier penetration(s) to functional status."
NOTE - Unit 1 Technical Specification 3.7.11 differs from Unit 2.
The words "functional" and "non-functional" are replaced by the words "OPERABLE and "inoperable".
TABLE OF INOPERABLE PENETRATION SEALS 8/02/88 -
2/28/90 AREA U-1 Relay Room U-1 lA D/G Control Room U-1 lB D/G Control Room U-1 lC D/G Control Room U-1 lA 125 V Battery Room U-1 lC 125 V Battery Room U-1 #1 250_ V Battery Room U'-1 #3 Stairwell U-1 64' Elevation, Aisle
- 1 Auxiliary Building U-1 84' Elevation, Aisle
- 1 Auxiliary Building U-1 122' Elevation, N2 Bottle Storage Area U-1 84' Corridor; Unit 1 &
2 Common East & West
- U'-1 78' Electrical Penetra.
Area NOS 15 2
1 1
2 20 9
6 U-1 100' Boric Acid Transfe~
3 Pump Area HOL 34 3
1 1
1 3
4 1
3 1
21
- 3 21 1
11 11 3
1 1
1 5
1 5
1 6
17 7
7 3
1 1
7 12 5
DEG 7
' 3 l**
2 2
2 1
1
tmlT 1 SPECIAL REPORT *-3-19 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 -
2/28/90 HOL U-1 100' El. Mechanic~l 1
5 Penetration Area -
Blowdown Tanks U-1 100' El. Corridor Service Building U-1 100' Elevation, Aisle 4
- 1 Auxiliary Building U-1 100' Corridor; Unit 1 & 15 2 Common East & West
- U-1 84' Corridor; Unit 1 &
2 Common North & South U-1 84' Corridor; Unit 1 &
2 Common East & West
- U-1 122' Lobby U-1 100' Lobby U-1 64' Lobby 2
U-1 11/12 Containment Spray 4
Pumps & Spray Add. Tank Area U-1 100' Corridor; Unit 1 &
2 Common North & South U-1 100' Elevation Counting Room U-1 #11 Diesel Oil Tk Room U-1 #12 Diesel Oil Tk Room U-1 84' Elev. Control Area
- 1 Transformer Bus Rm.
U-1 Spent Fuel Pit Heat Exchanger & Pump Area U-1 lA Diesel Generator Area 2
6 23 3
U-1 lB Diesel Generator Area 1
U-1 lC Diesel Generator Area 4
U-1 Waste Evaporator Room 4
U-1 100' Elevation Mechanical 8 Penetration Area 2
4 11 7
3 1
1 4
1 14 3
1 4
3 2
8 3
1 1
1 CEL 2
8 3
3 2
6 14 1
30 61 14 11
- 2.
3 2
1 6
19 1
185 1
1 3
2 5
91 6
16 5
1 1
7 1
2 3
11 4
1 10 1
1 1
1 2
2 1
7 1
UNIT 1 SPECIAL REPORT *-3-19 e TABLE OF INOPERABLE PENETRATION SEALS (cont'd}
8/02/88 -
2/28/90 AREA NOS HOL VIS DPT CEL DEG FMT PIM*
U-1 UPS Battery Room 2
U-1 Containment Rad Mon Room 4
1 10 10 U-1 #11 Chg. & SI Pump. Room 1
4 U-1 #12 Chg. & SI Pump Room 1
U-1 #13 Chg. & SI Pump Room 2
U-1 84' El. Pipe Trench 126 1
1 16 2
U-1 100' El. Baling & Storage 7 1
3 1
1 U-1 110' El. Control Console 1
9 U-1 78' El. Contain. Rad 1
1 Mon. Room U-1 84' El. #11 Comp. Cool.
20 1
3 2
Heat Xgr. & 12 cc Pp Room U-1 100' Elec. Penetra. Area 13 4
17 6
5 U-1 Laundry, Chem Pump Area 5
3 2
19 4
U-1 64' El. Control Area #1 3
4 18 11 1
4KV Bus U-1 #1 Letdown Heat Exch.
1 U-1 84' El. #12 Comp. Cool.
3 3
3 Heat Xgr. & 12 & 13 CC Pp Room U-1 #11 SI Pump Room 1
1 U-1 Pipe Trench 14 3
3 20 16 3
U-1 Rx Coolant Filter Area 9
1 U-1 84' Spent Resin Xfer Pp Rm 2
U-1 11 & 12 Mon. Tank Room 8
1 5
2 U-1 84' Elevator Lobby 1
U-1 Aux Feed Pumps 3
U-1 Valve Alley 3
2 3
U-1 Seal Water Heat XChg 2
3 1
U-1 84' El. Corridor 2
2 1
~IT 1 SPECIAL REPORT *-3-19 e TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 2/28/90 AREA NOS HOL VIS DPT CEL DEG FMT PIM U-1 A/C & Boric Acid 5
1 10 81 1
Tank Room U-1 A/C Equipment Rm 1
2 4
U-1. Boric Acid Evap. &
2 1
3 1
Gas Stripper Unit U-1 Water Recirc Heater 3
1 1
2 U-1 #1 Stairwell 6
5 U-1 #1 Cone. Filter Area
- 1 U-1 Rm Next To #11 Chg Pp 2
2 U-1 Diesel Oil C02 Area 4
1 U-1 Motor Control Center 2
1 1
U-1 Elevator - El 2
1 1
U-1 N2 Bottle Storage 3
U-1 #12 RHR XGR Room 1
U-1 55' El. Walkway 2
U-1 Future Mixed Bed 7
Dem in U-1 #11 Mixed Bed Deroin 2
U-1 #1 Cation Bed (NW) 2 U-1 #1 Cation Bed (SW) 8 U-1 #11 Debora ting Deroin 3
U-1 #12 Debora ting Dem in 2
1 U-1 Primary Sampling Lab 3
1 U-1 78' Piping Penetration 1
4 U-1 Vent Duct Shaft 1
6 U-1 Valve Room 4
U-1 Waste Evaporator Area 1
U-1 #11 Evap. Feed Ion Xchg.
3
UNIT 1 SPECIAL REPORT *-3-19
- e TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 2/28/90 AREA NOS HOL VIS DPT CEL QEG_
FMT PIM U-1 #12 Evap. Feed Ion Xchg.
2 U-1 #13 Evap. Feed Ion Xchg.
4 U-1 #14 Evap. Feed Ion Xchg.
1
- 1 U-1 100' Aisle #1 N & s 2
U-1 122' Corridor 1
U-1 Ops File & Ref Rm 1
u....:1 *Watch Engineer Room 3
U-1 #1 Maint, Spare & Test 1
Equipment Room U-1 #2 Maint, Spare & Test 2
Equipment Room U-1 Janitors Closet 1
U-1 #1 Control Equip. Room.
15 5
U-1 84' El. Pipe Alley 2
3 1
U-1 Sample Room 1
U-1 Data Logging Room 2
16 U-1 Work Control Center 1
2 1
U-1 #11 & #12 RHR Sump Pumps 1
Room U-1 #1 Control Room 4
2 U-1 AC Equip. Room 1
2 U-1 #1 Spent Fuel Pit Filter 1
U-1 Women's Toilet 5
U-2 #5 Stairwell 3
1 U-2 #4 Stairwell 3
1 U-2 #2 Stairwell.
6 1
1 U-2 100' El. Mechanical Pene.
2 Area -
Blowdown Tanks
UNIT 1 SPECIAL REPORT.-:3-19 e TABLE OF INOPERABLE PENETRATION SEALS
{cont'd) 8/02/88 -
2/28/90 AREA NOS HOL VIS DPT CEL DEG FMT PIM U-2 100' El. Corridor 1
U.;.....2 100' Elevation Mechanical 1 3
5 6
4 3
Penetration Area U-2 AC & Boric Acid Tank Room 9 9
21 4
1 U-2 Relay Room 23 27 4
53 132 1
U-2 22 RHR Xgr* Room 3
U-2 84' Control Area Trans-17 34 4
39 31 former Bus Room U-2 Rad. Detector Panel 1
U-2 Battery Room 2C 125VDC 13 U-2 Battery Room. 2B 125VDC 2
3 3
U-2 #2 250V Battery Room 3
U-2 Control Area #7 4KV 4
5 2
3 1
Vital Bus Area U:-2 110' El. Control Console 1
3 U-2 78' Electrical Pen. Area 5
4 U-2 2A DIG Control Room 1
5 4
1 U-2 2B D/G Control Room 1
2 9
4 U-2 2C D/G Control Room 2
4 3
U-2 #21 Diesel Oil Tank Area 5
2 1
3 U-2 #22 Diesel Oil Tank Area 1
3 2
4 4
U-2 #21 Diesel Fuel Oil 1
1 Transfer Pump Area U-2 #22 Diesel Fuel Oil.
1 Transfer Pump Area U-2 111' Vent. Equip. Area 18 4
9 U-2 100' Vent Duct Shaft 1
1 U-2 64' Storage Area 2
1 19 6
~IT 1 SPECIAL REPORT *-3-19 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 -
2/28/90 U-2 84' Spent Fuel Pit Heat XChgr. & Pump Room 4
U-2 Boric Acid XFer Pump Area 2 U-2 Aisle #1 East Section U~2 Aux..Feedwa ter Pumps U-2 #21 & 22 Monitor Tank Area U-2 21 & 22 Cont. Spray Pumps. ~ *Spray Add Tank U-2 Aisle 2 East & West U-2 Counting Room U-2 #2 Control Room U-2 Pipe Alley U-2 78' Containment Rad Monitor Room U-2 21 & 22 SI Pump Room U-2 84' Piping Pene Area U-2 Ai~le 2 North & South U-2 84' Corridor U-2 Calibration Room 7
2 3
11 1
1 6
5 U-2 #21 Component Cooling 8
Heat Exchanger and Pumps U-2 #22 Component Cooling 5
Heat Exchanger and Pumps HOL VIS 1
1 1
1 2
5 1
1 1
DPT 1
4 1
4
- 1.
5 1
CEL 4
1 1
2 1
1 1
FMT 2
1 The opposite room for the north and east walls is the Unit 2 Relay Room..
- - The Relay Room PIM was resealed thirteen days after opening APPARENT CAUSE OF OCCURRENCE:
The cause of the degraded fire barrier penetrations could not be positively determined.
~IT 1 SPECIAL REPORT *~3-19 APPARENT CAUSE OF OCCURRENCE:
(cont'd)
The east wall penetrations (discovered 7/13/88) from the Relay Room side. "appeared" sealed visually due to the use of a bushing on the sleeve whic.h hid the gap.
The 3 :5" south wall penetrations (discovered 7/25/88) also appeared sealed from the Relay Room side, as described in the Description of Occurrence section.
Closer inspection, as required by the Seal Penetration Review Group procedures, revealed the nature of the impairments.
Technical Specification Surveillance 4.7.11 requires verification of the functional status of fire barrier penetrations every eighteen months via a visual inspection.
This inspection would not necessarily identify the non-functional status of the subject penetrations.
The 5.5" south wall penetration (found July 25) is located in a difficult to reach location.
The gap in the seal may have formed due to shrinkage.
It does not appear as though a cable was pulled (forming the gap).
The 3.5" north wall penetration (found July 28) is also located in a difficult to reach location.
The gap in the seal appears to have formed as a result of a
~able pull.
It has not been determined when or by whom the cable was pulled.
The penetrations with non-functional seals, found between August 2, 1988 and February 28, 1990, are similar in configuration (except as noted) to the penetrations identified in tne original issue of this Special *Report.
The cau~e of their degraded condition also could not positively be determined.
ANALYSIS OF OCCURRENCE:
The functional integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility.
This design feature mi~imizes the possibility of a single fire involving several areas of the facility.
The fire barrier penetration seals are a passive element in the facility fire protection program and are subject to periodic inspections.
This report satisfies the reporting requirements of Technical Specification 3.7.11.a pursuant to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire.
barrier impairments is greater than seven (7) days.
Appropriate actions were already in place in accordance with the requirements of Technical Specification Action Statement 3.7.11.a to establish a one hour roving fire watch for the impair~d fire barriers once the impairments were identified.
The subject fire area contains detection in addition. to the roving fire watch patrol.
Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve an adjacent area.
This occurrence therefore involved no undue risk to the health or safety of the public.
CORRECTIVE ACTION:
The hourly fire watch, as addressed in the Description of Occurrence sect~on, will continue *until all fire protection concerns associated with these areas are resolved.
\\.
.~IT 1 SPECIAL REPORT *-3-19..
CORRECTIVE ACTION:
(cont'd)
The repair of the penetrations was not accomplished within seven (7) days due to the additional review being conducted by the Penetration Seal Task Force.
Upon completion of this review the penetrations will be sealed.
Penetration seal repair work has been initiated.
The Unit 1 Relay Room was the first area worked.
To date, 2545 penetrations have been sealed and accepted by the Penetration Seal Task Force.
The majority of those penetrations in the Unit 1 and Unit 2 Relay Rooms (halon discharge areas) which either have no seal or holes through the seal have been sealed using approved station procedure
- M3Y, "Installation and Repair of Fire Barrier ~nd Flood Protection Seals".
The review and corrective actions, conducted by the Penetration Seal Review Program, will be completed in accordance with the March 4, 1988 PSE&G letter NLR-N88037 to the NRC, the August 26, 1988 telecommunication between PSE&G and the NRC Region 1 office, *and the August 15, 1989 semi-a~nual management meeting conducted with th~ NRC.
MJP:pc SORC Mtg.90-020
~t,!/:~
General Man~~~ -
Salem Operations.