Proposed Tech Specs,Reflecting Relaxed Reportability Requirements for Reactor Trip Breaker & Reactor Trip Bypass Breaker Surveillance Testing
ML18094B219
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/27/1989
From:
Public Service Enterprise Group
To:
Shared Package
ML18094B218 List:
References
NUDOCS 9001050234
Download: ML18094B219 (4)


Text

IJIJ *.(1 tJO JJ *::O c:

z

~

w I

~

18.

Turbi11e Trip Low Autostop Oil Pressure Turbine Stop Valve Closure

19.

Safety Injection Input from SSl'S io.

Reacto1 Coolant Pump D1*edke1 Posiliou Tt ip (above l'-7)

21.

Reactor Trip Breakers

22.

Automatic Trip Logic l~EAC'l'UH TIU I' _ SYSTEM J NSTl<UMENTAT.lON TOTAL NUMBER OF _ ~!IAN~f;LS 4

' }

2 2

CHANNELS TO THJP 4

MINIMUM CHANNELS OP!;;~ABLE 2

J

~

1/1.Jre.lb.:1*

pc1* uverd-Ling J 00 l' 2

APl'LI CADLE

__ t!OUL~ ___

1 I*~

1 J*,4*,5*

1

  • 2 J*,4*,5'~

ACT!Q~

7 ti t,(I 11

~

14 13 1

1J

TABLE 3.3-1 (Continued)

TABLE NOTATION

  • With the reactor trip system breakers in the closed position and the control rod drive system capable of rod withdrawal.
    • The channel(s) associated with the protective functions derived from the out of service Reactor Coolant Loop shall be placed in the tripped condition.
  1. The provisions of Specification 3.0.4 are not applicable.
    1. High voltage to detector may be de-energized above P-6.
      1. If ACT ION St at ement 1 is entered due t e t Ae results ef maiAteAaAee testiAg en Reaeter Tri13 Br eaker s (RTB) or Reactor Trip--B~ Breakers (RTBB) exceedi ng any procedu ral accept ance criteri a, or RTB/ RTBB tri p forces eKceeding the recommended upper limit, immedi at e NRG not i fieation [ w itAi~

- 1 "our and prior te any re~a ir er adjust meAt t o tAe affected breaker( s )] is required in accerdanee wit A Sf'eeifi eatiofl 6.9.2 ACTION STATEMENTS ACTION 1 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.1.

ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.

c.

Either, THERMAL POWER is restricted to < 75% of RATED THERMAL and the Power Range, Neutron Flux trip setpoint is reduced to < 85%

of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

ACTION 3 - With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER 1eve1 :

SALEM - UNIT 1 3/4 3-5 Arrendrrent No. 60

TABLE :J. :J::l__J Continuedl Vl

)::.

r-UEAGfOl:t TRlP SYSTEM INSTRUMENTATION ni 3:

MlNIMUM c

TOTAL NUMBER CHANNELS CHANNELS APPL!CABLE

z:

-i FUNCTIONAL UNIT OF CllAN~ELS _

TO TR!f___

OPEHABLE

__ ~_QDE~. __

ACTION N

18.

Turbine Trip

a.

Low Autos top Oil Pressure J

l 2

lit *

b.

Turbine Stop Valve Closure 4

4 4

7 Ii

19.

Safety Injection input from SSPS

/.

1

  • 2
20.

Heactor Coolant Pump B1*eaker 1/hreaker 1/breaker 11 Posit ion Trip (above P-7) per opera-w ting loop w

I

~

21.

Reactor Trip Breakers 2

1 2

1

  • 2 lH1t; 14 3*,4*,5*

13

22.

Automatic Trip Logic 2

1 2

1, 2 1

3*,4*,5*

13 e

T~ BLE 3.3-1 (C:ntir~ ! 1 )

Tl3LE

~IC HTiJN

  • wich che re~c:or
  • trip systam b r!a~ers in t ~ e c l JS!~ ~ositicn d~~ C~ ! cantrcl rod dri~e system c~pd~ l e of rod withdrd~~l.
    • The channel(s) dSsoc idted with the protectt ~ e functions derived from t ~ e out of service Reactor Coolant Loop shall be placed in the tripped :ondition.

1Tha provfsf01'IS of Spec1ffcatfon 3.0.4 ara not applicable.

    1. Hfgh voltage to detector may be de-energf zed above P-5.

llllf ACTION Statam1At 1 1s 1nt1r1d due te t~* results ef maintanaAce testfAt o~ Reaeter Tri~ Sr1ak1r1 (RTI) es-A1aete,. Trfp Bypass Breakers (RTBB) 1xc11d1ng any prac1dural acc1ptanc1 cr1tar1a, or RTl/RT88 tr1~ fGFtes u111din9 the recommended upp1r limit, immediate NAC Aat1ffcat1eA Ew1tA1A

1. naul' and prfer to a~ repair' Gr' afijustm1nt to the.. affected breaker(!)] is required fn acGardance with Sp1ef ffeatien 6.9.2 ACTION STATEMENTS ACTION L
  • Wtt!I the nwnb1r of c:h1nnels OP!RABl! one less the rtqUtred by th*

M1 nf.. Ch1nne l 1 OP!RAlll requ1 rllll8nt, be 1 n HOT STAlfOIY wt tnf n 5 hoan: hawev1r, one ch111n1l *1 b* bypusld for up ta i houn for surv1t111nc* testfn9 p*r Spectftc1tton 4.3.l.1 pravfdld th* other ch111n1l ts OPERAll!.

ACTION z - Wtth th* numb1r at OPERABLE dtann11s one less thin th* iot1l Nwab1r of Ch111n1ls, SiAATUP lltd/or POWER OPERATION ~1 proceed provtdld th*

followtng condtttons are s.ttsf11d:

    • The fnoper1bl1 c:h1nn1l fs pt1c1d fn th* trfpped candttfon wf thf n l ttour.
b. The Mtnfl!IWI Ch111n1ls OPERABLE requirement f s met; ha'#evtr, one addttton1l ch1nn*l *1 b* bypassed for up to Z hours fa~
  • surv1tllanca t1sttng.p1r Spectf1catfon 4.3.t.l.
c. E1th1r, THERMAi. PMR 1s rtstr1ctad ta Tess than or aqu1l to 75' of RATED ntERMAL and the Power Range, N1utron Flux trf p s1tpaf nt f s reduced to ltu th&n or equal to 851 of RATED THERMAl POWER wfthtn 4 ttours; or, th* QUADRA~T POWER TI~T RATIO ts manttartd at le1st onc1 p1r lZ hau~.
d. Th1 QUAQRAHT POWIR TILT RATIO, as 1ndfc1tld by the remaining thr1e dattcto~, ts v1r1f1ad *Cons1stant with the narmalfzld syim19trtc p°"9r dtstr1but1on obtained by, ustng.th1 mov1bl1 f n-core datactori 1n th* four p1i rs of symmatrf c thfmbl e toc1ttons 1t least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> -hen THERMAL P0\\4ER ts gr11t1r thin 751 of RATED nfE.WL POWER.

SALEM

  • UNtT Z 3/4 3-5 Amendment No. 28