ML18094A658
| ML18094A658 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/24/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18094A659 | List: |
| References | |
| NUDOCS 8909050224 | |
| Download: ML18094A658 (2) | |
See also: IR 05000272/1989018
Text
Docket Nos. 50-272
AUG 2 4 1989
Public Service Electric and Gas Company
ATTN:
Mr. Steven E. Miltenberger
Vice President and
Chief Nucle~r Officer
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Combined Inspection Report No.
50~272/89-18 and 50-311/89-16
This letter refers to the routine safety inspection of the emergency diesel
generators (EOG) conducted by Messrs. E. H. Gray and C. Woodard of this office
on June 20-23, 1989 at Salem Units 1 and 2.
The findings were discussed with
Mr. L. Miller, Site General Manager, at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective ex~minati6ns of procedures and
representative records, interviews with p.ersonnel, and observations by
the inspector.
Within the scope of this inspection, no violations were observed; however, a
deviation from the FSAR with regard to the emergency diesel generator fuel oil
was identified.
The deviation is set forth in Appendix A.
An unresolved item
was identified regarding your progr2m for dedication of commercial consumable
materials such as emergency diesel generator fuel and lube oil. Also identi-
fied were several concerns that appeared to affect the EOG reliability.
(See
Section 9.0.)
You are required to provide a written response to this office
_addressing the deviation per Appendix A, and we request that your response also
address the unresolved item regarding dedica~ion of consumable materials as
safety grade and any changes in procedures or hardware you plan on making to
improve EOG reliability based on your followup of observations identified in
the enclosed report.
Your cooperation with us in this matter i~ appreciated.
Sincerely,
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Region I Combined Inspection Report Numbers 50-272/89-18 and
50-311/89-16
OFFICIAL RECORD COPY
CIR SALEM 89-18/16 - 0001.0.0
08/24/89
-
-:n=_: o 1 '\\'
Public Service Electric
and Gas Company
cc w/encl:
AUG 2 4 1989
2
Jack Urban, General Manager, Fuels Department,' Delmarva Power & Light Co.
L. K. Miller, General Manager - Salem Operations
B. A. Preston, Manager, Licensing and Regulation
M. J. Wetterhahn, Esquire
-General Manager - Nuclear Safety Review
R. Fryling, Jr., Esquire
Scott B. Ungeref, Manager, Joint Generation Projects Department,
Atlantic Electric Company
Licensing Project Manager, NRR
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bee w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Monte Conner, SALP Reports Only
J. Dyer, EDD
RI:DRS
Gray/pmb/rw
ti !f?f'
7 /2:( /89
RI:DRS
Woodard
c(_'(/i, /;,,. Ct*_J
7 /7-Y./89
rtl RI: DRS
~Strosnider
811 /89
OFFICIAL RECORD COPY
RI WS
.pulJ~
g; / ((!89
CIR SALEM 89-18/16 - 0002.0.0
07/21/89