Forwards Safety Insp Repts 50-272/89-01 & 50-311/89-01 on 890131-0320 & Notice of Violation.Determination as to Whether Continued Noncompliances Represent Breakdown in QA Program Should Be Addressed in Response
ML18094A316
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/31/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18094A317 List:
References
NUDOCS 8904130138
Download: ML18094A316 (3)


See also: IR 05000272/1989001

Text

Docket Nos. 50-272

50-311

S 1 MAR 1989

Public Service Electric and Gas Company

ATTN:

Mr. S. E. Miltenberger

Vice President and Chief Nuclear Officer

P.O. Box 236

Hancocks Bridge, NJ

08038

Gentlemen:

Subject:

Inspection No. 50-272/89-01; 311/89-01

This letter transmits the findings of the routine,

conducted by Mrs. K. Halvey Gibson and others from

20, 1989, at the Salem Nuclear Generating Station.

discussed with Mr. L. K. Miller of your staff.

resident safety inspection

January 31, 1989 to March

The findings were

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

You are

required to respond to this letter and in preparin~ your response, you should

follow the instructions in Appendix A and as delineated in this letter.

The first violation deals with three instances of procedural noncompliances

which resulted in safety system actuations during the report period.

In your

response, please describe any pertinent conditions such as plant status,

control room activities, or number of hours worked which may have contributed

to the errors.

Where such conditions are identified, please indicate the

actions you plan to take to eliminate those conditions.

The second violation involves your failure to correct or prevent recurrence of

self-identified material control nonconformances for over a three year period.

We are concerned that such nonconformances continued during this period

despite recurring quality assurance findings and implementation of escalation

procedures required by the Quality Assurance Program.

Consequently, in your

response to the violation please provide your evaluation of whether this

problem represents a breakdown of your Quality Assurance Program.

We are also

concerned that due to your failure to correct the identified problems, the

number of nonconformances identified, and the apparent lack of pre-issue

controls to verify the appropriateness of materials issued during this three

year period, nonconforming material could potentially have been installed in

safety-related systems.

Please address this concern in your response indicating

what steps you plan to take to determine whether nonconforming material has

been used in plant systems, and what you will do to prevent recurrence.

8904130138 890331

Pr*R

Ao1-Jc-.*L*". c C' - c *

"

>~10 X>272

Q

PDC

OFFICIAL RECORD COPY

CIR SALEM 89-01 - 0001.0.0

03;3o;ag ff_ O I

\\~

  • ,

Public Service Electric and

Gas Company

2

31 MAR 1989

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980 PL-511.

Your cooperation with us is appreciated.

Sincerely,

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Inspection Report No. 50-272/89-01; 311/89-01

cc w/encls:

S. LaBruna, Vice President - Nuclear Operations

L. K. Miller, General Manager - Salem Operations

J. Zupko, General Manager, Quality Assurance and Safety Review

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light

Co.

.

B. A. Preston, Manager, Licensing and Regulation

S. Ungerer, Manager, Joint Generation Projects Department, Atlantic

Electric

M. J. Wetterhahn, Esquire, Conner & Wetterhahn

R. Fryling, Jr., Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

OFFICIAL RECORD COPY

CIR SALEM 89-01 - 0002.0.0

03/30/89

Public Service Electric and*

Gas Company

bee w/encls:

3

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

S 1MAR19B9

K. Halvey Gibson, Senior Resident Inspector, Salem

L. Rossbach, Senior Resident Inspector, Indian Point 2

Robert J. Bores, DRSS

TI Coordinator, DRP

J. Stone, NRR Project Manager