ML18094A316
| ML18094A316 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/31/1989 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18094A317 | List: |
| References | |
| NUDOCS 8904130138 | |
| Download: ML18094A316 (3) | |
See also: IR 05000272/1989001
Text
Docket Nos. 50-272
50-311
S 1 MAR 1989
Public Service Electric and Gas Company
ATTN:
Mr. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, NJ
08038
Gentlemen:
Subject:
Inspection No. 50-272/89-01; 311/89-01
This letter transmits the findings of the routine,
conducted by Mrs. K. Halvey Gibson and others from
20, 1989, at the Salem Nuclear Generating Station.
discussed with Mr. L. K. Miller of your staff.
resident safety inspection
January 31, 1989 to March
The findings were
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
You are
required to respond to this letter and in preparin~ your response, you should
follow the instructions in Appendix A and as delineated in this letter.
The first violation deals with three instances of procedural noncompliances
which resulted in safety system actuations during the report period.
In your
response, please describe any pertinent conditions such as plant status,
control room activities, or number of hours worked which may have contributed
to the errors.
Where such conditions are identified, please indicate the
actions you plan to take to eliminate those conditions.
The second violation involves your failure to correct or prevent recurrence of
self-identified material control nonconformances for over a three year period.
We are concerned that such nonconformances continued during this period
despite recurring quality assurance findings and implementation of escalation
procedures required by the Quality Assurance Program.
Consequently, in your
response to the violation please provide your evaluation of whether this
problem represents a breakdown of your Quality Assurance Program.
We are also
concerned that due to your failure to correct the identified problems, the
number of nonconformances identified, and the apparent lack of pre-issue
controls to verify the appropriateness of materials issued during this three
year period, nonconforming material could potentially have been installed in
safety-related systems.
Please address this concern in your response indicating
what steps you plan to take to determine whether nonconforming material has
been used in plant systems, and what you will do to prevent recurrence.
8904130138 890331
Pr*R
Ao1-Jc-.*L*". c C' - c *
"
>~10 X>272
Q
OFFICIAL RECORD COPY
CIR SALEM 89-01 - 0001.0.0
03;3o;ag ff_ O I
\\~
- ,
Public Service Electric and
Gas Company
2
31 MAR 1989
The response directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980 PL-511.
Your cooperation with us is appreciated.
Sincerely,
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report No. 50-272/89-01; 311/89-01
cc w/encls:
S. LaBruna, Vice President - Nuclear Operations
L. K. Miller, General Manager - Salem Operations
J. Zupko, General Manager, Quality Assurance and Safety Review
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light
Co.
.
B. A. Preston, Manager, Licensing and Regulation
S. Ungerer, Manager, Joint Generation Projects Department, Atlantic
Electric
M. J. Wetterhahn, Esquire, Conner & Wetterhahn
R. Fryling, Jr., Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFICIAL RECORD COPY
CIR SALEM 89-01 - 0002.0.0
03/30/89
Public Service Electric and*
Gas Company
bee w/encls:
3
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
S 1MAR19B9
K. Halvey Gibson, Senior Resident Inspector, Salem
L. Rossbach, Senior Resident Inspector, Indian Point 2
Robert J. Bores, DRSS
TI Coordinator, DRP
J. Stone, NRR Project Manager
R. J. Kiessel, NRR
B. Clayton, EDO
pj
lf.Dudl ey
31)-1(89 Jri
Swetland
3fi'~/89
OFFICIAL RECORD COPY
RI~)
~r
3l/f (89
CIR SALEM 89-01 - 0003.0.0
03/29/89
\\