UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 nocket No. 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear
- Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
January 18, 1989
SUBJECT:
DEVELOPMENT OF A RISK-BASED INSPECTION GUIDE FOR SALEM UNIT 2 The NRC has a program for producing plant-specific inspection guidance for resident inspectors using insights from probabilistic risk assessments (PRAs'.
The Risk-Based Inspection Guide (RIG) for a particular plant contains information about its dominant accident sequences, the relative importance of.
the various plant systems that contribute to these sequences, and the more risk-significant failure modes of the important systems.
Plant-specific vulnerabil;ties are highlighted for the resident inspector.
In addition, inspection checklists are provided for the most risk-significant failure modes.
The purpose of the RIGs is to help focus NRC's inspection activities on the most risk-significant aspects of each plant so that our limited inspection efforts have the most benefit to public health and safety. For example, a RIG directs increased attention to a limited number of plant components and it provides guidance for selecting activities to observe and for events to follow-up.
~'e have developed a methodology to produce RIGs for plants that do not have a PPA.
It uses insi~hts from available PRAs to focus a review of the subject plant's design, technical specifications and operating procedures.
We have found that the resulting RIG can capture a useful portion of the risk-significant features of the subject plant.
The RIG project is not part of the Individual Plant Examinatfon (IPE) program.
When an IPE is completed for your plant, the RIG will be revised as appropriate to include the IPE findings.
In order to produce a-*RIG for Salem Unit 2, we will need some additional information about its design and particularly its operating procedures.
1--'ence, we are asking for your cooperation in pro.vi ding copies of some existing plant documents for this project. Compliance with this request is not required by NRC regulations; we are seekin~ your voluntary cooperation. If you choose to participate with us, WP will make the draft version of the RIG available to you and the resident inspector at your plant so that you can make c011111ents and suggestions before the final version fs COllllJleted.
~
! --F:2;1;?,-R0i 230223 -890Trn -
~
- n. C"d (
17)*'
A:OOCI< 05(H)c:):311 J;:J.~J P:OC P,tf
Mr. Steven January 18, 1989
- The additional information we need to produce the RIG is contained in the following documents:
- 1.
Indexes for nonnal, abnonnal and emergency operating procedures.
- 2.
Mode 1 normal operating procedures, abnonnal operating procedures, and emergency operating procedures for the systems listed in the enclosure.
- 3.
If not included in the normal operating procedures, the Mode 1 system lineup checklists for the systems listed in the enclosure.
- 4.
System descriptions (typically from operator training materials) for systems listed in the enclosure.
- 5.
11" x 17" piping and instrumentation diagrams for the systems listed in the enclosure.
The reporting and/or recording keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
If you would like to discuss the project or get clarification of any of the requested items, please contact Steve Long at (301) 492-3162.
Enclosure:
List of Systems to be Included in Risk-based Inspection Guide cc w/encl:
See next page Sincerely,
~e.~
James C. Stone, Pro,iect Manager Project Directorate 1-2 Division of Reactor Projects l/ll Office of Nuclear Reactor Regulation J
Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:
Mark J. Wetterhahn. Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue. NW Washington, DC 20006 Richard Fryling, Jr ** Esquire Law Department - Tower 5E 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. La Bruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Robert Traee, Mayor Lower Alloways Creek Township Municipal Hall Hancocks Bridge, NJ 08038 Richard W. Borchardt, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038
- Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex Trenton, NJ 08625 -
Mr. David M. Scott. Chief Bureau of Nuclear Engineering Department of Environmental Protection State of New.Jersey CN 411 Trenton, NJ 08625 Salem Nuclear Generating Station Richard B. McGlynn, Conunission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I U. s. Nuclear Regulatory Connnission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Scott B. Ungerer MGR. - Joint Generation Projects
- Atlantic Electric P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Delmarva Power & Light Company c/o Jack Urban General Manager, Fuel Supply 800 King Street P.O. Box 231 Wilmington, DE 19899
List of Systems to be included in Risk-Based Inspection Guide
- 1.
- 2.
Engineered Safety Features Actuation
- 3.
Normal and Emergency AC Electrical Power
- 4.
DC Electrical Power
- 5.
Chemical and Volume Control
- 6.
Safety Injection
- 7.
Pressurizer Relief
- 8.
Low Pressure Injection/Pecirculation/Residual Heat Removal
- 9.
- 10.
Feedwater/Condensate
- 11. Service Water/Emergency Service Water
- 12.
Component Cooling Water ENCLOSURE
Mr. Steven January 18, 1989 The additional information we need to produce the RIG is contained in the following documents:
- 1.
Indexes for normal, abnormal and emergency operating procedures.
- 2.
Mode 1 normal operating procedures, abnormal operating procedures, and emergency operating procedures for the systems listed in the enclosure.
r
- 3.
If not included in the normal operating procedures, the Mode 1 system lineup checklists for the systems listed in the enclosure.
- 4.
System descriptions (typically from operator training materials) for systems listed in the enclosure.
- 5.
11" x 17 11 piping and instrumentation. diagrams for the systems listed in the enclosure.
The reporting and/or recording keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
If you would like to discuss the project or get clarification of any of the requested items, please contact Steve Long at (301) 492-3162.
Enclosure:
List of Systems to be Included in Risk-based Inspection Guide cc w/encl:
See* next page DISTRIBUTION:
tlocket Fi 1 e=-
SVarga/BBoger OGC w/encl NRC PDR & Local PDR WButler/MO'Brien EJordan/BGrimes Sincerely, Isl James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PDI-2 Readin_g JStone/MThadani ACRS (10)
Slong Previously concurred*
RAB:DREP*
SLong 01/12189 PDI-2/LA*
MO'Brien
~2/PM v~~i~ne:mr
[INSPECTIU?N G IDE]
PDI-2/D
, 1r 1sg I 11g /89 WButler
' '\\ ~/89'
Mr. Steven The additional information we need to produce the RIG is contained in the following documents:
- 1.
Indexes for normal, abnormal and emergency operating procedures.
- 2.
Mode 1 normal operating procedures, abnormal operating procedures, and
- emergency operating procedures for the systems listed in the enclosure.
- 3.
If not included in the normal operating procedures, the mode 1 system lineup checklists for the systems listed in the enclosure.
- 4.
System descriptions (typically from operator training materials) for systems listed in the enclosure.
- 5.
11" x 17" piping and instrumentation diagrams for the systems listed in the enclosure.
The reporting and/or recording keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
If you would like to discuss the project or get clarification of any of the requested items, please contact Steve Long at (301) 492-3162.
Enclosure:
List of Systems to be indicated in Risk-based Inspection Guide cc w/encl:
See next page DISTRIBUTION:
Docket File SVarga/BBoger OGC w/encl NRC PDR & Local PDR WButler/MO'Brien EJordan/BGrimes Sincerely, James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PDI-2 Reading JStone/MThadani ACRS (10)
Slang Previously concurred~*
i RAB: DREP*
j~..
Slang
~t rien 01n2189 I 1\\t'ag PDI-2/PM JStone:mr I
/89
[INSPECTION GUIDE]
PDI-2/D WButler I
/89
Mr. Steven The additional information we need to produce the RIG is contained in the following documents:
- 1.
Indexes for normal, abnormal and emergency operating procedures.
- 2.
Mode 1 normal operating procedures, abnormal operating procedures,.and emergency operating procedures for the systems listed in the enclosure.
- 3.
If not included in the normal operating procedures, the mode 1 system lineup checklists for the systems listed iti the enclosure.
- 4.
System descriptions (typically from operator training materials) for systems listed in the enclosure.
- 5.
11" x 17" piping and instrumentation diagrams for the systems listed in the enclosure.
The reporting and/or recording keeping requirements contained-Jn this letter affect fewer than ten respondents1 J therefore; OMB clearance is_ not required under P.l.96-511.
/ )
If you would like to discuss the project or ge~ clarifica~ion of any of the requested items*, please contact Steve long at (301) 492-3162.-
Enclosure:
As stated cc w/encl:
See next page Si_ncerely, James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor* Regul atio'n DISTRIBUTION:
w/encl Docket File SVarga/BBoger OGC
[INSPECTION GUIDE]
RAB:DREP/~
Slang.,--,...c....
I /tz_/89 NRC PDR & local PDR WButler/MO'Brien EJordan/BGrimes PDI-2/lA
-MO' Brien I
/89 PDI-2/PM JStone:mr I
/89 PDI-2 Reading JStone/MThadani ACRS ( 10)
PDI-2/D WButler I
/89 Slang