Monthly Operating Rept for Oct 1988 for Salem Unit 1.W/
ML18093B297
Person / Time
Site: Salem 
Issue date: 10/31/1988
From: Miller L, Orticelle A
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811220330
Download: ML18093B297 (10)


Text

AVERAGE DAILY UNIT POWER LEVEL Completed by Art Orticelle Month OCTOBER 1988 Day Average Daily Power Level (MWe-NET) 1 1097 2

1101 3

1095 4

1094 5

1106 6

912 7

1113 8

10 86 9

1107 10 10 92 11 1083 12 1108 13 1120 14 1103 15 1107 16 1113 P. 8.1-7 Rl Day Docket No.

Unit Name Date Telephone Extension Average Daily (MWe-NET) 17 1108 18 1117 19 1110 20 1079 21 1127 22 1109 23 1093 24 1103 25 1104 26 1121 27 1120 28 1077 29 1082 30 1100 31 1105 50-272 Salem # 1 11-3-88 609-935-6000 4451 Power Level

e e

OPERATING DATA REPORT Docket No.50-272 Date :

l~l:---3=---=9-=9,__ ___ _

Completed by Pell White Telephone:

....,.9_,,3...,,,5~--6_0_0_0 ____ _

Extension: 4451

~--------

Operating Status

1.

Unit Name Salem No. 1 Notes

2.

Reporting Period October 1988

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe) 1170

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe)1149

7.

Maximum Dependable Capacity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A

9.

Power Level to Which Restricted, if any (Net MWe)

N/A


~----~~

10. Reasons for Restrictions, if any N/A

~----~----~---------~

11. Hours in Reporting Period
12. No. of Hrs. Reactor was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 7. Gross Elec. Energy Generated (MWH)
18. Net Elec. Energy Generated (MWH)
19. Unit Service Factor 2 0. Unit Availability Factor
21. Unit Capacity Facto' (using MDC Net)
22. Unit Capacity Factor (using DER Net) 2 3. Unit Forced Outage Rate This Month 745 74 5 0

745 0

2541840 857360 822713 100 100 99.8 99.0 0

Year to Date 7320 54 7 3. 1 0

5380.1 0

18180290.8 6071520 5795598 73.5 7 3 *.5

71. 6
71. 0 3.9 Cumulative 99409 63168.2 0

611 71. 9 0

190449299.6 63266010 60191807

61. 5
61. 5
54. 7 54.3 22.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling outage scheduled for April 9 and lasting approximately 5 5 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A 8-1-7.R2

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH OCTOBER 1988 Docket No.50-272 Salem No.1 11-3-88 Completed by Art Orticelle Unit Name Date Telephone Extension 609-935-6000 No.

Date N/A 1

F: Forced S: Scheduled Type 1

Duration Hours Reason 2

Method of Shutting Down Reactor License Event Report 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operation~l Error-explain H-Other-explain System Code 4 3 Method 1-Manual Component Code 5 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 44 51 Cause and Corrective Action to Prevent Recurrence Turbine Trip 4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit 1 Salem as Source

WO NO 880628084 880901259 880915102 880926101 881002050 881003082 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1

1S27C FAILURE DESCRIPTION:

INLET FLANGE WELD LEAKING/REWORK BY 16SW25.

1 lPSl FAILURE DESCRIPTION:

DOES NOT STROKE PROPERLY/REWORK XA-10.

1 12 CONTROL AREA SUPPLY FAN FAILURE DESCRIPTION:

NO START INDICATION/TROUBLESHOOT 1

12 SERVICE WATER PUMP FAILURE DESCRIPTION:

12 SERVICE WATER PUMP HAS EXCESSIVE PACKING LEAKAGE/REPACK.

1 11 SW PUMP FAILURE DESCRIPTION:

MOTOR DEGRADED/REWORK.

1 1R36 FAILURE DESCRIPTION:

RAD. MON. IS SPIKING INTO ALARM/REPAIR.

SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8801004093 1

1PC936C/G 13 ACCUM PRESS FAILURE DESCRIPTION:

INTERMITTENT ALARM/TROUBLESHOOT.

881007086 1

15 s.w. PUMP MTR FAILURE DESCRIPTION:

PREMATURELY STARTED IN AUTO/REWORK.

881011095 1

1R44A FAILURE DESCRIPTION:

CONTAINMENT HIGH RANGE AREA RAD MON/SPIKING/REPAIR.

881017173 1

14AF23 FAILURE DESCRIPTION:

RBODY TO BONNET LEAK/TEMP. REPAIR E24.

r/fA~OR PLANT MODIFICATIONS R~PORT* MONTH OCTOBER 1988

  • OCR NO.

PRINCIPAL SYSTEM lSM-0004 P-250 Computer lSM-0376 Auxiliary Feedwater

Design Change Request e

DOCKET NO.:

50-272 UNIT NAME:

Salem 1 DATE:

November 10, 1988 COMPLETED BY: J. Jackson TELEPHONE:

--.::-6=0=9~7=3=3=9--~4~4=5=5~~~

DESCRIPTION This design change attached a data logger and associated controller to the P-250 Computer input terminal strips to read the necessary parameters for calculating a secondary plant calorimetric.

This design change installed an overspeed trip test device to allow for testing of the turbine trip mechanism for No.

13 Auxiliary Feedwater Pump.

e e

MA~OR PLANT MODIFICATIONS R~PORT*MONTH OCTOBER 1988 DOCKET NO.:

50-272 UNIT NAME:

Salem 1

  • DCR lSM-0004 lSM-0376 DATE:

November 10, 1988 COMPLETED BY: J. Jackson TELEPHONE:

---6~0~9~/=3=3=9--~4~4~5~5--------

SAFETY EVALUATION 10 CFR 50.59 All instruments involved in this study either serve no process control function or are isolated from the computer input terminal strips by signal is~lation modules.

This ensures that should the 10 ohm impedence of the data logger be breached by some event or if the leads are shorted during installation, there will be no effect on plant operation.

No unreviewed safety or environmental questions are involved.

This design change provided the operators with a means of performing testing of the turbine overspeed trip test device in accordance with the manufacturer's recommendations.

There was no change to any plant process or discharge or to the environmental impact of the plant.

No unreviewed safety or environmental questions are involved.

DCR - Design Change Request

SALEM UNIT NO. 1 SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

UNIT NO. 1 OCTOBER 1988 The Unit began the month operating at full power and continued to operate at essentially full power for the entire period.

REFUELING INFORMATION DOCKET NO.:

50-27 2 COMPLETED BY:

J. Jackson UNIT NAME:

Salem 1 DATE:

TELEPHONE:

EXTENSION:

November 10, 1988 609/935-6000 4497 Month OCTOBER 1988

1.

Refueling information has changed from last month:

YES NO X

2.

Scheduled date for next refueling:

April 15, 1989

3.

Scheduled date for restart following refueling: May 30, 1989

4.

A)

B)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO DATE X

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X

If no, when is it scheduled?

February 1989

5.

Scheduled date(s) for submitting proposed licensing action:

February if required

6.

Important licensing considerations associated with refueling:

7.
8.
9.

NONE Number of Fuel Assemblies:

A)

Inc ore B)

In Spent Fuel Storage Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

8-l-7.R4 193 464 1170 1170 September 2001

e

.. PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 November 11, 1988 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of October 1988 are being sent to you.

RH:sl cc:

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information Mr. William T. Russell Regional Administrator USN'RC Region I 631 Park Avenue King of Prussia, PA 19406 Sincerely yours,

ff~

L. K. Miller General Manager -

Salem Operations Enclosures 8-l-7.R4 The Energy People 95-2168 (1 OOM) 12-84