AVERAGE DAILY UNIT POWER LEVEL Completed by Pell White Month JUNE 1988 Day Average Daily Power Level (MWe-NET) 1 10 66 2
1102 3
1082 4
972 5
1089 6
1102 7
1108 8
1110 9
1111 10 1106 11 11 20 12 1086 13 1109 14 1120 15 10 96 16 1096 P. 8.1-7 Rl Day Docket No.
Unit Name Date Telephone Extension Average Daily (MWe-NET) 17 1094 18 1100 19 1093 20 1122 21 1075 22 1100 23 1085 24 1075 25 1116 26 1063 27 1039 28 1103 29 1101 30 1090 31 50-272 Salem ff 1 July 10, 1988 609-935-6000 4451 Power Level
Completed by e
OPERATING DATA REPORT Pell White Operating Status Docket No.50-272 Date:
~J~u~l~y~l.,....,....u-,--.1~9~9~9...-~
Telephone: 935-6000 Extension: ~4~4-5~1~~~~~~~
- 1.
Unit Name Salem No. 1 Notes
- 2.
Reporting Period June 1988
- 3.
Licensed Thermal Power (MWt) 3411
- 4.
Nameplate Rating (Gross MWe) 1170
- 5.
Design Electrical Rating (Net MWe) 1115
- 6.
Maximum Dependable Capacity(Gross MWe)ll49
- 7.
Maximum Dependable Capacity (Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
- 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
~~~--'--~~~~~~~~
- 10. Reasons for Restrictions, if any N/A
~---'~~~~~~~~~~~~~~~~~~~~
This Month Year to Date Cumulative 1 1. Hours in Reporting Period 720 4367 96456
- 12. No. of Hrs. Reactor was Critical 72 0 26 88. 3 60383.4
- 13. Reactor Reserve Shutdown Hrs.
0 u
0
- 14. Hours Generator On-Line 720 26 05. 2 58396.9 1 5
- Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Gen era ted (MWH) 2445290.4 8751180.4 181020189.2 1 7. Gross Elec. Energy Generated (MWH) 818230 2938960 60133450 1 8. Net Elec. Energy Generated (MWH) 785534 2795692 57191901
- 19. Unit Service Factor 100 59.7 60.5
- 20. Unit Availability Factor 100 59.7 60.5
- 21. Unit Capacity Factor (using MDC Net)
- 98. 6 57.9 53.6
- 22. Unit Capacity Factor (using DER Net)
- 97. 8 57.4 53.2 2 3. Unit Forced Outage Rate 0
1.4 23.4
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/ A 8-l-7.R2
Completed by No.
Date 0106 6-26-88 1
F: Forced S: Scheduled Pell White Duration Type Hours 1
F 6.3 UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH JUNE 1988 Method of Shutting Reason Down 2
Reactor A
5 License Event Rep art System Code 4 EA Docket No.50-272
~~~~~~~~-
Unit Name Date Telephone Extension Salem No.l July 10, 198'8 609-935-6000 44 51 Component Code 5 Cause and Corrective Action to Prevent Recurrence Hope Creek Power Feed to Circulators 2 Reason 3 Method 4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161) 5 Exhibit 1 Salem as Source A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operational Error-explain H-Other-explain 1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Continuation of Previous Outage 5-Load Reduction 9-0ther
MAJOR PLANT MODIFICATIONS REPORT MONTH JUNE 1988
- OCR NO.
PRINCIPAL SYSTEM lSM-0283 Fire Protection lSM-0350 Containment Spray lSM-0351 Boiler Feed
~ DCR - Design Change Request DOCKET NO.:
50-272 UNIT NAME:
- -=s-a__,,l_e_m____,1:--------
DATE:
July 10, 1988 COMPLETED BY: J. Ronafalvy TELEPHONE:
609/339-4455 DESCRIPTION This modification replaced the automatic transfer switch for fire pump control.
This modification installed drain valves on the Contain-ment side of Valves 11 & 12 CS48 to allow draining of the valve bodies for leak rate testing.
This modification replaced the spools on Valves 12 & 14 BF19 due to the original counter-bore machining encroaching upon the minimum wall thickness.
MAJOR PLANT MODIFICATIONS REPORT MONTH JUNE 1988 DOCKET NO.
50-272 UNIT NAME :
Sal_e_m_..,1,_--------
- DCR lSM-0283 lSM-0350 lSM-0531 DATE:
July 10, 1988 COMPLETED BY:
J. Ronafalvy TELEPHONE:
609/339-4455 SAFETY EVALUATION 10 CFR 50.59 This modification does not change the design basis or normal operation of the fire pump automatic transfer switch.
The replacement switch is different due to the original being obsolete.
This modification did not alter any plant process or discharge or affect the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
The addition of drain valves to the downstream side of Valves 11 & 12 CS48 allow draining of the lines for Type "C" Testing.
System and component operations have not been affected.
This modifi-cation did not alter any plant process or dis-charge or affect the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
The replacement of the spools ensured the spools continue to meet the required wall thickness.
The replacement spools are made of a material with superior corrosion/erosion resistance to that of the original spools.
This modification did not
- alter any plant process or discharge or affect the environmental impact of the plant.
No unreviewed safety or environmental questions are involved.
DCR - Design Change Request
WO NO 880119077 880217114 880405132 880416083 880602092 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
RX BYPASS BKR-A FAILURE DESCRIPTION:
DOESN'T ALARM WHEN RACKED IN TROUBLESHOOT 1
RX TRIP BRK FAILURE DESCRIPTION:
"B"P250 INPUT CIRCUT/TROUBLESHOOT AND REWORK.
1 2CC19 6 FAILURE DESCRIPTION:
PACKING LEAK/REPACK/ A-255.
1 2C D/G PT VOLT ALARM FAILURE DESCRIPTION:
ALARMED DURING RUN / TROUBLESHOOT.
1 22 CHL WTR PUMP FAILURE DESCRIPTION:
BEARINGS RUNNING HOT/REPLACE BEARINGS.
e
WO NO 880609079 880609116 880610045 880622078 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
22CV15 3 1
FAILURE DESCRIPTION:
BONNET LEAKING/ REPLACE BONNET.
21 DEBORATING DEMIN BED FAILURE DESCRIPTION:
21 DEBORATING DEMIN BED RESIN FOR eves TO BE SLUICED.
1 22 BAT PUMP FAILURE DESCRIPTION:
MECHANICAL SEAL LEAKING/ REWORK.
FAILED MECHANCIAL SEAL ON #22 BAT PUMP REPAIR/REPLACE.
1 2C VITAL INSTRUMENT INVERTER FAILURE DESCRIPTION:
FAILED / TROUBLESHOOT.
~.
SALEM UNIT NO. 1 SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
UNIT NO. 1 JUNE 1988 The Unit began the period operating at 100% power and continued to operate at full power until June 3, 1988, When power was briefly reduced to 85% for repairs to a feedwater heater.
The Unit was restored to full power on June 5, 1988, and continued to operate at full power until June 26, 1988, when load was briefly reduced to repair "hot spots" in the temporary 13KV power feed from Hope Creek to Salem.
On June 27, 1988, the Unit was restored to full power and continued to operate at that level for the remainder of the period.
PEFUELING INFORMATION DOCKET NO.:
50-272 COMPLETED BY:
J. Ronafalvy UNIT NAME:
Salem 1 DATE:
July 10, 19 88 TELEPHONE:
609/935-6000 EXTENSION:
4497 Month JUNE 1988
- 1.
Refueling information has changed from last month:
YES NO X
- 2.
Scheduled date for next refueling:
April 15, 1989
- 3.
Scheduled date for restart following refueling: May 30, 1989
- 4.
A)
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE X
B)
Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X
If no, when is it scheduled?
February 1989
- 5.
Scheduled date(s) for submitting proposed licensing action:
February if required
- 6.
Important licensing considerations associated with refueling:
7 0
- 8.
- 9.
NONE Number of Fuel Assemblies:
A)
Inc ore B)
In Spent Fuel Storage Present licensed spent fuel storage capacity:
Future spent tuel storage capacity:
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
8-l-7.R4 193 464 11 70 1170 September 2001
CPS~G Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 July 13, 1988 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of June 1988 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information Sincerely yours, J. <l:: t:!f 9..