Forwards Safety Insp Repts 50-272/87-37 & 50-311/87-37 on 871214-18.No Violations or Deviations Noted.Concerns Re Util Inline Chemical Measurements Accuracy Raised Due to Lack of Sample Temp Control & Acceptance Criteria
ML18093A607
Person / Time
Site: Salem  
Issue date: 01/25/1988
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML18093A608 List:
References
NUDOCS 8802030116
Download: ML18093A607 (2)


See also: IR 05000272/1987037

Text

Docket Nos. 50-272

50-311

Public Service Electric and Gas Company

ATTN:

Mr. Corbin A. McNeill, Jr.

Vice President-Nuclear

P. O.Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

JAN 2 5 1988

Subject:

Combined Inspection Nos. 50-272/87-37 and 50-311/87-37

A routine safety inspection of the water chemistry control program was

conducted by Mr. H. Bicehouse of this office on December 14-18, 1987 at the

Salem Generating Station. Our findings were discussed with Mr. J. Zupko, Jr.

and others of your staff at the conclusion of the inspection on December 18,

1987.

The areas examined during this inspection are described in the NRC Region I

Combined Inspection Report which is enclosed with this letter. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel and observations by the

inspector.

Within the scope of the inspection, no violations or deviations were

identified. However, the apparent lack of temperature control of samples

provided to inline chemical instrumentation and acceptance criteria for

comparison of inline and laboratory readings of the same parameter raise

serious concerns regarding the accuracy of your inline chemical measurements.

We understand that your staff shares our concerns and has made plans to

resolve the problem noted.

We

request that you provide a written reply

within thirty days of the date of this letter detailing the corrective actions

to be taken and planned dates for their completion.

Your cooperation with us in this matter is appreciated.

Sincerely,

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-272/87-37;

50-311/87-37

-802030116

PDR

ADOCK

G

880125

05000272

PDR

OFFICIAL RECORD COPY

\\'

  • -

Public Service Electric

& Gas Company

cc w/encl:

2

Thomas S. Shaw, Jr., Vice President, Production

S. E. Miltenberger, Vice President, Nuclear Operations

J.M. Zupko, Jr., General Manager, Salem Operations

B. A.

Pr~ston, Manager, Licensing and Regulation

General Manager, NUclear Safety Review

M. J. Wetterhahn, Esquire

R. Fryling, Jr., Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Sasfety Information Center(NSIC)

NRC Resident Inspector

State of New Jersey

bee w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Robert J. Bores, DRSS

".11.J.- .

RI: DRSS

Bicehouse/ejr

l/l+/88

/Jl

~~~~~

1/1..{/88

~

Bellamy

1/1.f /88

OFFICIAL RECORD COPY

cir sal 87-37

1/5/88