Docket Nos.
50-272
50-311
Public Service Electric and Gas Company
ATTN:
Mr. Corbin A. McNeill, Jr.
Senior Vice President - Nuclear
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Combined Inspection 50-272/87-32 and 50-311/87-33
This letter transmits the report of the routine resident safety inspection
by Mr. T. Kenny and Mrs. K. Halvey Gibson, of this office, on November 3,
1987 to November 30, 1987, at the Salem Nuclear Generating Station,
Hancocks Bridge, New Jersey.
The inspection consisted of document reviews,
interviews, and observation of activities.
The findings were discussed
with Mr. J. M. Zupko, Jr. of your staff.
Within the scope of this inspection no violations were observed.
However,
Section 5 of the report delineates an unresolved item (272/87-32-02) which
causes concern for the environmental qualification of equipment in the
vicinity of the No. 13 Auxiliary Feedwater Pump enclosure.
Please let me know,
in writing, what is being done regarding our two concerns within this
unresolved item: 1.) the apparent loss of configuration control and 2.) the
operability of equipment, located in the environment surrounding the auxiliary
feedpump enclosure, in the event a steam break occurs within that enclosure.
A new item appears in the attached inspection report, (See Detail 8) covering
the subject of assurance of quality.
Assurance of quality is an area of
evaluation NRC has recently added to the SALP process. Activities at all
levels of a licensee's organization are needed to assure quality.
We will be
evaluating those activities in all functional areas.
Inspection findings
applicable to the assurance of quality may be found in various details of
inspection reports.
Noteworthy findings, both strengths and weaknesses, will
be included in a separate detail item, as it is done in the attached report,
when appropriate.
I have provided reporting guidance to our inspectors in
this area.
They will be glad to discuss it with you or your staff.
Pseo2020270 aso114
GDR
ADQC1L
.... 05000272
OFFICIAL RECORD COPY
CIR SALEM 87-32/33 - 0001.0.0
01/14/88
Public Service Electric and Gas Company
-2-
.14.JAN 1988
Your cooperation with us in this matter is appreciated.
Sincerely,
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
.Enclosure:
NRC Combined Report 50-272/87-32 and 50-311/87-33
cc:
S. E. Miltenberger, Vice President - Nuclear Operations
J. M. Zupko, Jr., General Manager - Salem Operations
L. A. Reiter, General Manager - Licensing and Regulation
B. A. Preston, Manager, Licensing and Regulation
C. P. Johnson, General Manager - Nuclear Quality Assurance
M. J. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
T. S. Shaw, Jr., Vice President - Production, Delmarva Power
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center
NRC Resident Inspector
State of New Jersey
bee:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
D. C. Fischer, NRR Licensing Project Manager
B. Clayton, EDO
,.
-
/ w
1j 1~/<f{
OFFICIAL RECORD COPY
CIR SALEM 87-32/33 - 0001.1.0
01/14/88