Physical Security Insp Repts 50-272/85-08 & 50-311/85-08 on 850408-11.Noncompliance Noted:Failure to Provide Adequate Illumination in Portion of Protected Area.Portions Deleted (Ref 10CFR73.21,9.5(a)(4) & 2.790)
ML18092A704
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/26/1985
From: Bailey R, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18092A702 List:
References
50-272-85-08-01, 50-272-85-8-1, 50-311-85-08, 50-311-85-8, IEIN-85-004, IEIN-85-4, NUDOCS 8508160076
Download: ML18092A704 (9)


See also: IR 05000272/1985008

Text

Rerort No .

Docket No.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

SQ-::'7::'. 18S-08

S0-311/SS-08

50-272

50-311

DPR-70

License No. DPR-75

,,.

Licensee:

Public Service Electric and Gas Company

80 Park Pl;ice

Newark, New Jersey 07101

Facility Name:

Salem Nuclear Generating Station

Inspection At:

Hancocks Bridge, New Jersey

Inspection Conducted:

April 8-11, 1984

Date of Last Physical Security Inspection: January 8, 1985

Type of Inspection:

Routine, Unannounced Physical Security

Inspectors:

Approved by:

I

7--Z. (;- f..!--

~ date

  • -

7~?~ -E..J

date

Inspection Summary:

Routine, Unannounced Physical Security Inspecti~n on

April 8-11, 1985 (Combined Report Nos. 50-277/85-08 and 50-311/85-08)

Areas Inspected:

Security Plan and Implementing Procedures; Management

Effectiveness; Security Organization; Records and Reports; Physical Barriers

(Protected and Vital Areas); Lighting; Compensatory Measures; Access Control

(Personnel); Personnel Training and Qualification; and, Handling of Safeguards

Information.

The inspector conducted followup on previous violations; Infor-

mation Notices; an allegation; and, actions taken in response to NRC's Regula-

tory Effectiveness Review findings.

The inspection involved 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> onsite by

one NRC region-based inspector, of which five were during non-regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in

the areas examined except for the following:

Lighting - Failure to provide

adequate illumination in a portion of the protected area; and, Compensatory

Measures - Failure of a security guard to demonstrate adequate knowledge while

performing compensatory security duties .

,,

1; ,.

'* .,

l

I~

.

'*

, '

~.

1.

Details

Personnel Contacted

P. Moeller, General Manager - Nuclear Services

J. Bavlish, Manager, Nuclear Security

T. DiGuiseppi, Security Supervisor

D. Limroth, NRC Project Inspector

The inspector also interviewed other Public Service Electric and Gas

Company employees and members of the Yoh contract security force.

2.

MC 30703 - Exit Interview

The inspector met with licensee representatives listed in paragraph 1 at

the conclusion of the inspection on April 11, 1985.

The purpose and

scope of the inspection were reviewed and the licensee acknowledged the

findings.

At no time during the inspection was written material provided to the

licensee by the inspector.

3.

MC 92702 - Followup on Violations

The following violation, which contains Confidential or Financial *

Information (COFI) was closed during this inspection:

50-311/83-10-01.

pmts PARAGRAPH CONTAINS 2. '190 (cl)

INFORMATION AND IS NOT 10R

l'UBLIC DISCLOSURE. IT IS

1

D:l:ENUONALLY LEFT BLANK *.

(Closed) Violation (50-272/82-15-03 and 50-311/82-15-03):

Failure to

have 0.2 foot candles of illumination in the protected area.

In order to

correct the problem of inadequate illumination in the protected area, the

licensee installed additional lighting at several locations on June 29,

1984.

On April 9, 1985, the inspector verified that the licensee had

provided adequate lighting. However, the inspector identified one area

where the illumination was inadequate because a lighting fixture had been

removed for maintenance.

The licensee could not account for this defi-

ciency.

Details concerning this apparent violation appear in paragraph 13

of this report .

(Closed) Violation (50-311/83-07-01):

Failure to maintain a ~ital area

boundary.

A security officer posted as a compensatory measure was

observed by the inspector in a position that precluded his observation of

an open vital area boundary which was included in his assigned post.

During this inspection, the inspector verified that a security officer

3

~was positioned such that he could observe the affected vital area to which

he was assigned, was properly equipped and was knowledgeable of the duties

and responsibili~ies associated with the post.

The inspector also inter-

viewed 10 of 12 Security Officers who were assigned to compensatory posts.

One was found to be deficient in his knowledge of post requirements.

The

inspector considered that to be an isolated case which could not reason-

ably have been expected to be prevented by the licensee's corrective

action for this violation and because of the proficiency demonstrated by

the other nine and, therefore, considered that the licensee's corrective

action, as stated in their response to the previous violation, was ade-

quate.

(See also paragraph 14 of this report.)

4.

MC 92703 - Followup on Information Notice 85-04 (Inadequate Management *

of Security Response Drills)

5.

6.

This information notice was issued to inform licensees of (1) a potential

danger in conducting security response drills without properly notifying

participants; and, (2) the need to ensure, through proper management

control, that such drills do not decrease the overall effectiveness of

the security program.

The inspector reviewed a Security Guardmont Bulletin, dated February 20,

1985, subject: IE Information Notice 85-04, Inadequate Management of

Security Response Drills, which had been issued to all security shift

supervisors and which required them to strictly follow secur1ty

'

requirements during the conduct of drills, ensuring proper management

cognizance; to ensure all parties participating in drills are properly

identified; and, to ensure that all radio transmissions regarding drills

begin and end with

11Thi s is a dri 11, this is a dri 11. 11

The inspector

also reviewed various checklists provided for drills. These forms were

found to be readily available for use by supervisors during drills and

emergency situations. The inspector determined that the licensee had

adequately considered the Information Notice.

MC 92704 - Followup on Headquarters Requests

During this inspection, the inspector reviewed the licensee's actions

regarding concerns identified during the NRC's Regulatory Effectiveness

Review which was conducted on December 2-10, 1982.

Those concerns were

forwarded to the licensee in a February 24, 1983 letter from the Office

of Nuclear Reactor Regulation.

See Attachment 1 for the inspector's

findings.

MC 92706 - Independent Inspection Effort

During this inspect1on, the inspector reviewed an allegation (RI:

84-4-0147) received by the NRC Senior Resident Inspector at Salem on

September 26, 1984.

The allegation concerned contractor personnel who,

in the company of their supervisor, failed to exercise proper access

measures when entering the control room.

Allegedly, this was witnessed

by two security officers who failed to do anything to correct the

situation.

4

~The licensee was requested by letter, dated October 19, 1984, from the

Director, Division of Project and Resident Programs, NRC Region I, to

review the allegftion. That review found that the contractor's supervisor

had opened the control room door properly to show his work crew how the

door was to be painted.

The workers did not actually enter the control

room but stood in the doorway without having exercised proper access

measures.

Other workers in the area immediately brought the deficiency to

the attention of the security officers who were accompanying the work

crew.

The security officers promptly instructed the workers in the proper

access procedures.

The licensee's findings and corrective actions are

contained in a letter dated November 21, 1984 to NRC Region I.

The inspector verified that the licensee had taken those actions stated

in the November 21, 1984 letter. The inspector also observed signs posted

at the badge issue window alerting visitors and escorts to their respon-

sibilities. Additionally, the inspector interviewed twelve security

officers to confirm that they had received expanded training on procedures

for escorting visitors. A review of security event reports by the inspec-

tor revealed no cases involving the improper accessing by v1sitors sub-

sequent to the alleged event.

The inspector determined that the

licensee's actions as a result of the event were appropriate for the cir-

cumstances.

7.

MC 81018 - Security Plan and Implementing Procedures

The inspector confirmed that the licensee's security program conformed to

the security plan and implementing procedures.

The inspector found no

evidence that plant safety was being affected by the security program,

procedures, or equipment.

8.

MC 81020 - Management Effectiveness - Security Program

The licensee's security management staff and the contractor's management

and supervisory staff appeared effective in discharging their

responsibilities.

The inspector was advised that periodic unannounced

searches of the site were being carried out with the aid of trained dogs

to detect any presence of controlled substances.

9.

MC 81022 - Security Organization

The licensee's security management structure and chain of command were

found by the inspector to be in conformance with the approved physical

security plan, contingency plan, procedures, and applicable regulatory

requirements, and were adequate and appropriate for their intended

function.

The inspector confirmed that the licensee has a management

system to provide for the development, revision, implementation and

enforcement of physical protection procedures.

5

10.

MC 81038 - Records and Reports

""

The inspector audited logs and records for accuracy, completeness,

unusual conditions, significant events and trends, required entries, pnd

proper reporting.

The following logs and records were reviewed:

Security Shift Supervisors Log; Reactor Operators Log (Units 1&2);

Training and Qualification Records; Security Procedures and Post Orders;

Maintenance Control Records; Weapons and Ammunition Control Records;

Perimeter and Area Lighting Checklist; Security Event Report Logs;

Guardmount Records; Site Training Department Memorandum; Guardmount

Bulletins; Armed Response Checklist; Armed Response Critique Forms;

Contingency Event Notification Check Sheets; Secondary Alarm Station

(SAS) Armed Response Checklist; Offsite Agency Support Report; and, Color

Coded Photo Badge Control Records.

No unacceptable conditions were

identified except that the Perimeter and Area Lighting Checklist did not

identify the missing light fixture which is discussed in paragraph 13 of

this report.

The missing fixture should have been noted on, at least,

the latest checklist.

(See paragraph 13 for further details.)

11.

MC 81052 - Physical Barriers - Protected Area

The inspector verified that the licensee was maintaining the physical

barriers surrounding the protected area in conformance with the security

plan.

12.

MC 81054 - Physical Barriers - Vital Area

The inspector verified that the licensee was maintaining the physical

barriers surrounding the vital areas in conformance with the security

plan.

13.

MC 81062 - Lighting

THIS PARAGRAPH CONTAl~~S SAFEGUARDS

INFORMATI:m MW IS ti!Dl F~R PUBLIC

DISCLOSURE, IT IS INTENTIONALLY

.

LUTBUNl

.

The inspector expressed his concern about the security force being unaware

of the removal of the lighting fixture by the maintenance force and about

the missing fixture not being identified on, at least, the latest Peri-

6

..,,meter and Area Lighting Checklist which is used during routine surveil-

lances. The Site Security Supervisor stated that he would look into the

matter and imple~ent corrective actions as necessary.

Failure to provide

adequate illumination in an exterior area of the protected area is an,

apparent violation.

(50-272/85-01 and 50-311/85-08-01)

14.

MC 81064 - Compensatory Measures

THIS PARAGRAPM r.mnJ.'"~ SAFEGUARDS

INFORMAT:o:~ ._.,., 1 ~ '

1 ~l t~:t PUBLIC,

DISCLOSURE, il ~~ mHNTlONA.lll ..-'.

LEFT BLANK.

Subsequently, the Security Officer was interviewed by the Yoh Security

Force Project Manager, who was in the company of the inspector during the

inspector's interview of the Officer, and it was apparent by the lack of

adequate responses to questions, that the security officer was not aware

of his assigned area of responsibility.

The Security Force Projec~

Manager summoned a roving area supervisor and directed that the security

officer be relieved and retrained.

The security officer was replaced with

a qualified security officer.

Failure to perform duties in accordance

with procedures is an apparent violation.

(50-272/85-08-02 and 50-311/-

85-08-02)

15.

MC 81070 - Access Control - Personnel

The inspector confirmed that the licensee maintained personnel access

control to the protected and vital areas in conformance with the physical

security plan and approved procedures.

However, as discussed in Item 3

of Attachment 1, the inspector identified to the site Security Super-

visor, that female guards must exercise more care when searching other

females.

16.

MC 81501 - Personnel Training and Qualification - General Requirements

The inspector confirmed that the licensee's training and qualification

(T&Q) program was being implemented as outlined in the approved T&Q

plan.

17.

MC 81810 - Physical Protection of Safeguards Information

The inspector reviewed the licensee's administrative program to protect

safeguards information as outlined in approved. procedures.

The inspector

found the established program to be adequate.

7

Attachment 1

I9spector 1 s Review of Licensee Actions

On RER Findings

On December 2-10, 1982, the NRC conducted a Regulatory Effectiveness Review at

the Salem Generating Station.

The findings of that review were .transmitted to

the licensee by letter of February 24, 1983.

That letter request the licensee

to review the findings and implement corrective action as required.

During

this inspection, the inspector reviewed the action taken by the licensee in

response to that request.

Following are the inspector's findings.

Item 1

Item 2

THIS PARAGRlflU ... ,.~, .. ~~~ SAFEgu1m

INFORMAT'Ot{ !!! r N~t t~~ PUBLIC

DISCLOSURE, IT ~ Ito !~~:-:":::iALLY

LEFT BLANK.

The inspector confirmed that modifications were completed on the turnstiles in

the Auxiliary Guard House by April 1, 1984.

The licensee informed the -

inspector that the Auxiliary Guard House will no longer be in use after May 4,

1985.

Item 3

8

THIS PAGE CONTAINS SAFEGUARDS

AND 2.790(d) INFORMATION AND

IS NOT FOR PUBLIC DISCLOSURE

IT IS INTENTIONALLY LEFT BLANK .

9

THIS PAGE CONTAINS SAFEGUARDS

INFORMATION AND IS NOT FOR

PUBLIC DISCLOSURE, IT IS

INTENTIONALLY LEFT BLANK