/:{ !DESrliQtNtA.TOO O!R,IrGJ~
Cert'~f i,e1d By: ]J * W 0*l.t,"tMJ.f.CW_.,.
AUG 12 1985
Docket Nos.
50-272
50-311
Public Service Electric and Gas Company
ATTN:
Mr. Corbin A. McNeill, Jr.
Vice President - Nuclear
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject: Combined Inspection Nos. 50-272~ and 50-311/85-08
This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey
of this office on April 8-11, 1985 of activities authorized by NRC License
Nos. DPR-70 and DPR-75 at the Salem Nuclear Generating Station, Hancocks
Bridge, New Jersey and to the discussions of our findings held by Mr. Bailey
with Mr. P. Moeller of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the actions you took to correct the violations
brought to your attention in the enclosure to our letters dated October 27,
1982, March 25, 1983 and May 23, 1983.
We have no further questions regarding
those actions at this time.
In addition, our inspector reviewed your actions
to correct the deficiencies identified during the Regulatory Effectiveness
Review, and brought to your attention in a February 24, 1983 letter from the
NRC's Office of Nuclear Reactor Regulation.
We have no further questions
regarding the actions you took to correct items l, 2, 3, 4, 7 and 9.
With
regard to items 5, 6, 8 ~nd 10, those items were not yet fully corrected and
will be reviewed during a future inspection of your security program.
Based on the results of this inspection, it appears that certain of your acti-
vities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
violations have been categorized by severity level in accordance with the
revised NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal
Register Notice (49 FR 8583) dated March 8, 1984.
You are required to respond
to this letter and in preparing your response, you should follow the instruc-
tions in Appendix A:
OFFICIAL RECORD COPY
IR SALEM 85-08 -
07/19/85
0001.0.0
I\\\\ ]:: 04
\\,. l
Public Service Electric and
Gas_ Company
2 AUG 1 2 1985
Sections of the enclosed inspection report contain details of your security
program that have been determined to be exempt from public disclosure in
accordance with either 10 CFR 73.21 (Safeguards Information) or 10 CFR
9.5(a)(4) (Commercial or Financial Information).
Therefore, the sections so
identified in the inspection report and Appendix A will not be placed in the
NRC Public Document Room and will receive limited distribution.
The inspection
report cover sheet and the remaining portions of the inspection report will be
placed in the Public Document Room, in accordance with 10 CFR 2.790(a).
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
~ig1na1 Signed By:*
~Uch:ard R. Keimig
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosures:
1.
Appendix A, Notice of Violation (Contains Safeguards Information)
2.
Combined NRC Region I Inspection Report Number 50-272/85-08 and
50-311/85-08 (Paragraphs 3, 13, and 14 and Attachment 1 contain
Safeguards Information) (SGI) and/or Commericial and Financial,
Information (COFI)
cc w/encls: (w/o Appendix A and Inspection Report Paragraphs 3, 13, and 14 and
Attachment 1 which contain SGI and/or COFI)
R. L. Mittl, General Manager - Nuclear Assurance and Regulation
J.M. Zupko, Jr., General Manager - Salem Operations
E. A. Liden, Manager - Nuclear Licensing and Regulation
C. P. Johnson, Manager - Quality Assurance Nuclear Operations
P. M. Krishna, Manager - Nuclear Review Board
A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic
Electric
M. J. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI and COFI)
State of New Jersey
OFFICIAL RECORD COPY
IR SALEM 85-08 - 0001.1.0
07/19/85
I'
f
1
I
) '* r
Public Service Electric and
Ga.s Company
3
AUG 12 1985
bee w/encls: (w/o Appendix A and Inspection Report Paragraphs 3, 13 and 14 and
Attachment 1 which contain SGI and COFI)
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
DRP Section Chief
RI: pfm_,
Ba ifefJ-g:b
7~/85
OFFICIAL RECORD COPY
R{:(}RSS
M~n
IR SALEM 85-08 - 0002.0.0
07/19/85