Proposed Tech Specs Section 3.1.2.1, Reactivity Control Sys, Correcting Typo
ML18092A393
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/15/1984
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A392 List:
References
NUDOCS 8411210182
Download: ML18092A393 (2)


Text

  • - -- .

e*

REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE:

a. A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if the boric acid storage tank in Specification 3.1.2.Sa is OPERABLE, or
b. The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if the refueling water storage tank in Specification 3.1.2.5b is OPERABLE.

APPLICABILITY: MODES 5 and 6.

ACTION:

With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least one injection path is restored to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145°F when a flow path from the boric acid tanks is used.
b. At least.once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

(

I SALEM - UNIT 2 3/4 1-7

REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a m1n1mum, one of the following boron injection flow paths shall be OPERABLE:

a. A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if the boric acid storage tank in Specification ~.l.2.7a is OPERABLE, or

.3. J. '2.SJ\

b. The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if the refueling water storage tank in Specification 3.l.2.7b is OPERABLE .

.3. 1..2.sB APPLICABILITY: MODES 5 and 6.

ACTION:

With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least one injection path is restored to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145°F when a flow path from the boric acid tanks is used.
b. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

SALEM - UNIT 2 3/4 1-7