Proposed Tech Spec Changes Extending Interval of Surveillance Requirement for Integrated Leak Rate Testing of Containment Bldg
ML18089A261
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/22/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18089A260 List:
References
NUDOCS 8307290185
Download: ML18089A261 (1)


Text

--

CONTAINMENT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.l.2 Containment leakage rates shall be limited to:

a.
b.

An overall integrated leakage rate of< L, 0.10 percent by weight of the containment air per 24 hour§ at design pressure, (47.0 psig).

A combined leakage rate of< 0.60 L for all penetrations and valves subject to Type Band C testg*as identified in Table 3.6-1, when pressurize~.to Pa.

APPLICABILITY:

MODES 1, 2, 3 and 4.

  • -ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 L, or (b) with the measured combined leakage rate for all penetrationsaand valves subject to Typ~s Band C tests exceeding 0.60 La' restore the leakage rate(s) to within the limit(s) prior to increasing the Reactor Coolant System temperature above 200°F.

SURVEILLANCE REOUTREM;.;;...F.;...;.NT~S'----------

4.6.1.2 The containment leakage rates shall be demonstrated at the fo1lowing test schedule and shall be determined in conformance with the criteria specified in Appendix J of 10 CFR 50 using the methods and provisions of ANSI N45.4-1972:

  • a!

Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40 _:: 10 month intervals during shutdown at desi~n pressure (47.0 psig) during each lD-year service period.* The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection.

S.4LEM - UNIT 1 3/4 6-2

--