Proposed Tech Specs Adding Manual Initiation Functions for Auxiliary Feedwater Sys to Appropriate ESF Tables
ML18087A807
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/28/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A806 List:
References
82-01, 82-1, NUDOCS 8304060254
Download: ML18087A807 (13)


Text

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS SALEM GENERATING STATION UNITS NO. 1 AND 2 DESCRIPTION OF CHANGE

\\

\\

Ref. 82-01 Add "Manual Initiation" to the list of FUNCTIONAL UNITS that initiate the Auxiliary Feedwater System.

The addition should be per the attached marked up pages.

REASON FOR CHANGE This change,.required by NRC, will satisfy the intent of requiremen*CN'o. 5 of Item I I. E.1. 2 of NUREG 073 7.

~.

SAFETY EVALUATION This cha~ge.ao"es not involve an unreviewed safety question since it only adds an existing function into the scope of the Engineered Safety Feature Actuation System Instrumentation, Table~ 3.3-3, 3.3-4 and 4.3-2 *

r--***"**----*- - -- - ---' _c --.- -----... -,--

.c __

. ' ' 8304060254 830328 PDR ADOCK 05000272 p

PDR

w -

.p.

w I

N 0

°'

TABLE 3.3-3 (Continued)

I

. ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP 'sETPOINTS

.FUNCTIONAL UNIT 8.- f AUX I LIAR( FEEDWATER

a. Automatic Actuation Logic.. **
b.

Manual Initiation Steam Generator Wate.r

... c

  • Level--Low-Low
i. start Motor Driven Pumps
  • i ;
  • Start Turbine-Ori ven Pumps
d. Undervoltage - RCP Start Turbine-Driven Pump
  • e. S.I.

Start Motor~Driven Pumps

f.

Emergency Trip of Steam Generator Feedwater Pumps Start Motor Driven Pumps

g.

Station Blackout

    • Applies to items c and d.

TOTAL NO; OF CHANNELS

2.

1/pump 3/stm ** gen.

. 3/stm *. gen.

4(1/bus)

CHANNELS TO TRIP 1

1/pump MINIMUM CHANNELS OPERABLE 2

1/pump 2/stm. gen.

2 stm. ~en.

2/stm. gen.

2 stm. gen.

1/2 x 2 3

APPLICABLE MODES 1, 2' 3 1, 2' 3 1, 2' 3 l, 2, 3 1, 2 See 1 above (All S.I. initiating functions and requirements) 2(1/pump) 2 2(1/pump) 1 See 6 and 7 above (SEC and U/V Vital Bus)

ACTION.

20 22 14*

14*

19 21

]

TABLE 3.3-3 (Continued)

TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-11.
    1. Trip function may be bypassed in this MODE below P-12
      1. Trip channel(s) associated with the protective functions derived from the out of service Reactor Coolarit _Loop.shall be placed _in the tripped mode.
  • The provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS ACTION 13 With the number of OPERABLE Channels one less than the Total Number of Channels, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveilla11ce testing per Specification 4.3.2.1.1.

ACTION" 14 --:-. With the number of OPERABLE Channels one less than the Total

:, Number of Channels, operation may proceed until performance

. of. the *next requi~ed CHANNEL FUNCTIONAL TEST, provided the ino*p.erable channel *is placed in the tripped condition within 1 *hour. * **

  • ACTION l~

With a channel.. associated with an operating loop inoperable, restore the inoperable channel to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; howe~er, one channel associated with an operating loop may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for survei 11 ance testing per Specification 4.3.2.1.1.

ACTION 16 - With the nomber of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inop-

  • erable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is demonstrated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />;.one additional channel may be bypassed for up_ to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveill.ance testing per Specification 4.3.2.1.1.

. ACTION 17-. With less than: th~ Minimum Channels OPERABLE, operation may continue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 - With the number of OPERABLE Channels one less than the Total

~umber o{ Channels, restore the inoperable channel to OPERABLE status withi~ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY

~it~~~ ihe rie~t ~ ho~rs an~ in COLb ~HUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SALEM - UNIT 1 3/4 3-21

.I TABLE 3.3-3 (Continued)

ACTION 19 - With the number of OPERABLE Channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b.

The Minimum Channels OPERABLE requirements is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1.1 ENGINEERED SAFETY FATURES INTERLOCKS DESIGNATION CONDITION AND*-SETPOINT FUNCTION P-11 P-12 With 2 of 3 pressurizer pressure channels > 1925 psig.

P-11 prevents or defeats manual block of safety injection actuation on low pressurizer pressure.

With 3 of 4 Tavg channels P-12 prevents or defeats

  • > 545°F.

manual block of safety injection actuation high steam line flow and low

~team line pressure

  • With 2 of 4 Tavg channels Allows manual block of safety
  • < 541°F.

injection actuation on high steam 1 i ne fl ow and. 1 ow steam line pressure.

Causes steam line isolation on high steam flow.

Affects steam dump blocks.

ACTION 20 - With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; how-.

ever, one -channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for.

surveillance testing.

ACTION 21 - With the number of OPERABLE channels one less than the Minimum Number of Channel.s, operation may proce~ed provided that either:

-a.*

The. inoperable channel is restored to OPERABLE within 72

~~urs, or

b.

If the affected Steam Generator Feedwater Pump is expected to be out of service for more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the inoperable

    • channel is jumpered ~o as to enable the Start Circuit of the Auxiliary Feedwater Pumps upon the loss of the other

.steam Generator F~edwater,Pump.

ACTION 22 - With the number.' of OPERABLE channels relating directly with the J number of OPERtBLE auxi 1 i ary. feedwater pumps, the ACTIONS of L.C.0. 3.7.1.2 apply.

I SALEM - UNIT 1 3/4 3-22

w

~

w I

N

0)

TABLE 3.3-4 {Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT
5.

TURBINE TRIP.AND FEEDWA1ER ISOLATION

. :-- a.

Steam Generator Water Leve 1 High-High

6.

SAFEGUARDS EQUIPMENT CONTROL SYSTEM {SEC)

7.

UNDERVOLTAGE, VITAL BUS

a.

Loss of Voltage

b.

Sustained Degraded Voltage

8.. AUXILIARY FEEDWATER
  • a. Automatic Actuation Logic
      • b.

Manual Initiation

. c. Steam Generator Water Level Low-Low

d.

Undervoltage - RCP

e.

S. I.

f.

Emergency Trip of Steam Generator Feedwater Pumps

g.

Station Blackout

.TRIP SETPOINTS

. < 67% pf narrow range

> 70% of bus voltage

  • > 91% of bus voltage for

( 13 seconds Not Applicable Not Applicable

> 18% of narrow range Tnstrument span each steam generator

~ 70% RCP bus voltage ALLOWABLE VALUES

< 68% of narrow range Tnstrument span each steam generator Not Applicable

    • > 65% of bus voltage

> 90% of bus voltage for

< 15 seconds Not Applicable Not Applicable I

>. 17% of narrow range Tnstrument span each steam generator

> 65% RCP bus voltage See 1 above (All S.I. setpoints)

Not Applicable Not Applicable See 6 and 7 above (SEC and Undervoltage, Vital Bus)

J

c Z.

-l w -

  • ..p.

w I w w

TABLE 4.3-2 (Continued)

  • .* ENGINEERED SAFETY FEATURE.ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS SURVEILLANCE; REQUIREMENTS
  • . ~....

FUNCTIONAL UNIT***

. 8 *.

  • AUXU.IARY F{EOWATER.
      • a.

Autrimati~ Actuation ~ogf~.

' * *b.

Manual Initiation

,*.c. *Steam Gener~tor Water Leve 1-*-Low-:Low *

. : d.

Undervol~age - RCP

e. S.I.
f.

Emergency Trip of Steam Generator Feedwater Pumps

. g.

Station Blackout CHANNEL-*

CHECK N.* A. *

  • N.A.

s s

CHANNEL

.* CA;LIBRATION N.A.

N.A.

R R

. CHANNEL FUNCTIONAL TEST M( 2).

M(4)

M M(2)

I See 1 above (All ~.I~ surveillance requirements)

N.A.

N.A. *.

R See 6b and 7 above (SEC and U/V Vital Bus)

MODES IN WHICH SURVEILLANCE REQUIRED.

1, 2, 3 1 ' 2' 3 1, 2, 3 1, 2 1

e J

TABLE 4.3-2 (Continued)

TABLE NOTATION (1)

Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS.

The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design i~terval.

(2)

Each train or logic channel shall be tested at least every 62 days on a staggered ~asis.

(3)

The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

(4)

The CHANNEL FUNCTIONAL TEST shall be conducted in conjunction with

]

the SURVEILLANCE REQUIREMENT OF 4.7.1.2. a SALEM - UNIT l 3/4 3-34

  • ~

r tTI.

i::

w,.

..i-.

w I

N.....

'f.

.TABLE 3.J~J (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION

  • FUNCTIONAL UNIT
8.

AUXILIARY FEEOWATER a..

Automatic Actuation

.. Logic**. *

b.
  • Manual* Init'iation
  • c~* *. Stm.

Gen~ Water Level-Low-.Low.

i.

Start Motor Driven Pumps ii. Start Turbine-Driven Pumps

d.

Undervoltage-RCP Start Turbine""

Driven Pump

e.

S. I.

TOTAL NO..

CHANNE(S

~

. OF CHANNELS.

TO TRIP /.

2 1

~.

1/pump

.)/pump.::

~ :.

3/stm. gen 2/stm'~

  • gen.

MINIMUM CHANNELS

1/pump 2 stm. gen.

any st,m; *gen..

3/stm. gen.

2/stm. gen.

2 stm. gen.

any*2 stm. gen..

4-1/bus 1/2 x 2 3

. APPLICABLE MODES 1,* 2' 3 1 *. 2' 3 1, 2 I 3 1, 2, 3 1, 2 ACTION 20 23 14*

19 Start Motor-Driven Pumps See 1 above (All S.I. initiating functions and requirements)

f.

1.

Trip of Main Feedwater.

Pumps Start Motor-Driven Pumps 2/Pump

    • Applies to items c and d.

1/pump 1/pump 1, 2 22*

e

]

TABLE 3.3-3 (Continued)

TABLE NOTATION

    1. Trip function may be bypassed in this MODE below P-11 (Pressurizer Pressure
  • Block of Safety Injection) setpoint.

Trip function may be bypass_e~ in thi.~ MODE below P-12 (Tavg Block of Safety Injection) setpoint.

it' The provisions of Specification 3.0.4 are not applicable.

ACTION 13

. ACTION* 14 ACTION STATEMENTS With the number of OPERABLE Channels one less than the Total Number of Channels, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveil 1.ance

  • .testing per. Specification 4*.3. 2.1 provided the other channel is OPERABLE~.

.>with the number of OPERABL! Channels one less than the Total Number of Channels, operation.may proceed u*ntil performance of the next required CHANNEL F~NCTIONAL TEST, provided the inoperable

.channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15 * -

With a channel associated with an operating loop inoperable, restore the inoperable channel to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; however, one channel associated with an operating loop may be bypassed for up ta*2 hours for sutveillance testing per Specification 4.3.2.1.

  • AtTION 16 With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is demonstrated*by CHANNEL CHECK within l. hour; one additional channel may be bypassed for up to
2. hours ~or sur.veillance testing per Specification 4.3.2.1..

ACTION 17

  • .. With less than' the Mini~um Channels OPERABLE, operation may

~ontinue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 With the number of OPERABLE Channels one less than the Total Number of Channels, restore'the inoperable channel to OPERABLE

  • stat'us within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at. least HOT STANDBY within the
  • next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s* and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I SALEM - /UNIT 2 I

3/4 3-22

e*

TABLE 3.3-3 (Continued)

ACTION 19 With the number of OPERABLE Channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

DESIGNATION P-11 P-12

a.

The inoper~bl 'channel is placed in the tripped condition within l hour.

. b.

The.Minimum ChannelS-OPERABLE requirements* i.s met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1.

ENGINEERED SAFETY FEATURES INTERLOCKS CONDITION AND SETPOINT FUNCTION With 2 of 3 pressurizer pressure channels ~ 1925 psig.

With 3 of 4 Tavg channels

~. 545°F.

With 2 of 4 T vg ehannels

< 541°F.

a P-11 prevents or defeats manual block of safety injection actuation on low presiurizer pressure.

P-12 prevents or defeats manual block of safety injection actuation high

. steam 1 i ne fl ow and low

  • * *steam line pressure.

Allows manual block of safety injection actuaticin ~n high steam line flow and low steam line pressure.

Causes steam line isolation on high steam

..

  • flow~ Affects steam dump blocks.

ACTION 20 With the number of OPERABLE channels one less than the Total Number of Channels, be in at least HOT STANDBY ~ithin 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s*

and in at le.ast HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; how-ever, one channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveillance testing provided the other channel is OPERABLE.

ACTION 21 With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to. OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within ACTION 22 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />..

With *.the number of OPERABLE channels one less than the Minimum Channels OPERABLE, operation may proceed until performance of the next required CHANNEL FUNCTIONAL TEST.

ACTION 23.

With the number of OPERABLE channels relating directly with the

. number of OPERABLE auxil*iary feedwater pumps, the ACTIONs of

...... *. *.. *:-. *'.:L.c-~o~. 3-.7:~1.2 _apply.*:::_:*.. * *

~

.. ~.

SALEM - UNIT 2 3/4 3-23

]

)>>

a::

c x. -

~

N N "

TABLE. J~J-4 (Continued)

£NGIN£fRED SAFETY FEATURE ACTUATION SYSTEH INSTRUMENTATION TRIP SETPOINTS FUNCiJONAL UNIT...

5~:*.... *TURBINE.TRIP AND FEEOWATER ISOLATION.

. a. Steam Generator Water Level--

II i gh-H fgh 6... :*: SAFEGUARD$ EQUI PHENT CONTROL SYSTEH (SEC) 7~

UND£RVOLTAGE, VITAL DUS

... *

  • a. Lo** ot Vol ta9e
b.

6ustaln~ Oe9raded Voltaqe 8.'

AUXILIARY FEED\\/ATER

a.

Automatic Actuation Logic

b.

. Manual Initiation

c.

Steam Generator Water Leve1-1ow-low

d.

Undervollage - RCP

e.

S. I.

f.

Trip of Hain feedwaler Pumps

r**.. *
  • <* < 67% of narrow range

.'.. Tnstr.umeni span.each steam

  • ~' *genera tor
  • :*:> N~~ *Appl f cable
> 70X of bus voltage

~-_::. -

  • < *.~91\\ of bus voltaqe for

. **~I J seconds Not Appl fcahle*

Not Applf cable

> IOX of narrow range

. instrument span each steam generator

> 70X RCP bus voltage ALLOWABLE VALUES

< 68X of narrow range Tnstrument span each.

steam generator Nol App Ji cab le

>,6SX of bu* volta9e tCJO\\ of bus volta9e tor

!1~

1 aecond11 Nol Applicable Not App 1 icab le

> 17% of narrow range Tnstrument span each steatn generator

.> 65X RCP bus voltage See 1 Above (All 5.1. selpotnts)

Not Applicable Nol Applicable

Vl

. '.)>

tT1 3:

I C-

z

-f N

w

~

w I w m

TABLE.4.3-2 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION.SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS

.. **.CHANNEL FUNCTIONAL UNIT

. =**

CHANNEL*

CHECK

  • . CALIBRATION CHANNEL FUNCTIONAL TEST
8.

AUX_ILIARY FEEDWATER

. a.. :

  • Automat iC Actuation Logic
  • b.*" Manual Initiation*

c, :I Steam Generator Water Level-Low-Low N.A.

H.A.

s s*

  • .. N. A.
. : H.A.
. R M(2)

~5)

M M

MODES IN WHICH SURVEILLANCE REQUIRED 1, 2. 3 I, 2. l 1, 2' 3 1',2 d~. Undervoltage - RCP e~'.

! S. I.

See 1 abo~a (All S.I. surveillance requirement~~

f.

_: Trip of M~in Feedwater Pumps N.A.

  • N.A.

S/U(4) 1, 2

1 TABLE 4.3-2 (Continued)

TABLE NOTATION (1)

Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS.

The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each loa_d *block within 1 second of its design interval.

(2)

Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.

I (3) The CHANNEL FUNCTIONAL TEST sha11 include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

(4) If not p~rf~rmed in the previous 92 days.

(5)

The CHANNEL FUNCTIONAL TEST shall be conducted in conjunction with the SURV~ILLANCE REQUIREMENT of 4.7.1.2.a

~~

SALEM - UNIT. 2 3/4 3-37

]