ML18087A452

From kanterella
Jump to navigation Jump to search
Daher-TLI - Submittal of the Redacted Versions of Revision 10 to the Versa-Pac Safety Analysis Report
ML18087A452
Person / Time
Site: 07109342
Issue date: 03/28/2018
From: Sewell P
Daher-TLI
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML18087A451 List:
References
LTR-20000-100-03
Download: ML18087A452 (2)


Text

1 of 2 LTR-20000-100-03 March 28, 2018 ATTN: Document Control Desk, Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001

Dear Mr. Layton:

Daher-TLI hereby submits the redacted versions of Revision 10 to the Versa-Pac Safety Analysis Report, Docket No. 71-9342, as indicated in DAHER-TLI letter LTR-20000-100-01 in accordance with 10CFR71.1, Communications and records, and 10CFR2.390(b), Public inspections, exemptions, requests for withholding.

The enclosures of this report are being submitted through the EIE system.

Please address any questions or comments to the undersigned.

Sincerely, Philip Sewell Email: psewell@tliusa.com Senior Engineer Work: (301) 421-4066 Daher-TLI Cell: (301) 514-6567 Digitally signed by Philip Sewell Date: 2018.03.28 13:34:44

-04'00'

2 of 2

Enclosures:

==

Description:==

File Name:

SAR Revision 10, Front Matter 001 VP SAR Rev 10 Cover and TOC FINAL.pdf SAR Revision 10, Section 1 002 VP SAR Section 1 Rev 10 FINAL_public.pdf SAR Revision 10, Section 2 003 VP SAR Section 2 Rev 10 FINAL_public.pdf SAR Revision 10, Appendix 2.13.7 004 TR-20000-100-001 Rev.0.pdf SAR Revision 10, Section 3 005 VP SAR Section 3 Rev 10 FINAL.pdf SAR Revision 10, Section 6 006 VP SAR Section 6 Rev 10 FINAL.pdf SAR Revision 10, Section 7 007 VP SAR Section 7 Rev 10 FINAL.pdf SAR Revision 10, Section 8 008 VP SAR Section 8 Rev 10 FINAL.pdf