APPENDIX A NOTICE OF VIOLATION Public Service Electric and Gas Company Docket Nos. 50-272; 50-311 License Nos. DPR-70; DPR-75 Salem Nuclear Generating Station, Units 1 and 2 As a result of the inspection conducted on February 9 - March 8, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violations were identified:
A.
10 CFR 55.33(b) extends the term of operator licenses based on submittal of renewal applications at least thirty days in advance of expiration. The operator at the controls of the facility must be licensed pursuant to Part 55 as required by 10 CFR 50.54(k).
B.
Contrary to the above, during the period May 17, 1981 *through February 1, 1982, the operator licensed under Operator License OP-4433, was frequently the operator at the controls.
The license expired on May 17, 1981, and application for renewal was not made until September 25, 1981
- This is a Severity Level IV Violation (Supplement I) applicable to DPR-70.
Technical Specification 3.7.11 requires that, with fire barrier penetrations inoperable, either a fire watch be stationed at one side of the penetration or a fire patrol be established once operability of the fire detectors in the area has been confirmed.
Contrary to the above, the following failures to provide a fire watch or patrol were identified:
On February 15, 1982, two unsealed 4 11 core bores were found between the electrical and mechanical penetration areas on elevation 78'.
No fire watch was present on either side of the open fire zone boundary penetration and no fire patrol had been established.
On February 23, 1982, the door in the fire boundary separating the Unit 1 and 2 4 KV switchgear rooms on elevation 64' was
- propped open.
No fire watch or fire patrol had been established on either side of this open penetration.
This is a Severity Level IV Violation (Supplement I) applicable to DPR-75.
0204020477 a20318-PDR ADOCK 05000272 Q
PDR I
oi'FrcrAL !!ECORD con I
I 411 I
I Appendix A 2
Pursuant to the prov1s1ons of 10 CFR 2.201, Public Service Electric and Gas Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, in-cluding:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further viola-tions; and (3) the date when full compliance will be achieved.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affinnation. Where good cause is shown, consideration will be given to extendi_ng your response time.
MAR 18 1982 01-iginal Signed By:
Richard W. Starostec,
Division of Project and
__ I OFFICIAL RECO!ID COPY I Programs