MONTHYEARNL-17-2097, No Active Safety Function Anchor Darling Double Disc Gate Valves2017-12-15015 December 2017 No Active Safety Function Anchor Darling Double Disc Gate Valves Project stage: Request ND-18-0199, Supplement to Request for License Amendment and Exemption Regarding Technical Specifications for Reactor Coolant System Vacuum Fill and Inspections, Tests, Analyses, and Acceptance Criteria for Containment Floodup (LAR-17-027S3)2018-02-14014 February 2018 Supplement to Request for License Amendment and Exemption Regarding Technical Specifications for Reactor Coolant System Vacuum Fill and Inspections, Tests, Analyses, and Acceptance Criteria for Containment Floodup (LAR-17-027S3) Project stage: Supplement ML18071A2472018-03-12012 March 2018 COL Docs - FW: LAR-17-028 RAI Response Supplement Project stage: Request ML18075A0942018-03-29029 March 2018 Issuance of Amendments Nos. 118 and 117 and Granting of Exemptions Technical Specifications for Reactor Coolant System Vacuum Fill and ITAAC for Containment Floodup (LAR 17-027) Project stage: Request ML18075A0952018-03-29029 March 2018 Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4, LAR 17-027 Project stage: Approval ML18075A0972018-03-29029 March 2018 Exemption - Vogtle Electric Generating Plant Unit 3 LAR 17-027 Project stage: Approval ML18075A0992018-03-29029 March 2018 Exemption - Vogtle Electric Generating Plant Unit 4 LAR 17-027 Project stage: Approval ML18075A1002018-03-29029 March 2018 Amendment - Vogtle Electric Generating Plant Unit 3 LAR 17-027 Project stage: Approval ML18075A1012018-03-29029 March 2018 Attachment - VEGP U3 Amendment 118(LAR-17-027) Project stage: Approval ML18075A1022018-03-29029 March 2018 Amendment - Vogtle Electric Generating Plant Unit 4 LAR 17-027 Project stage: Approval ML18075A1032018-03-29029 March 2018 Attachment - VEGP U4 Amendment 117(LAR-17-027) Project stage: Approval ML18075A1042018-03-29029 March 2018 Safety Evaluation - Vogtle Electric Generating Plant Units 3 and 4 LAR-17-027 Project stage: Approval ML18086A3232018-04-18018 April 2018 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment No. 121 - LAR 17-028 Project stage: Approval ML18086A3202018-04-18018 April 2018 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment No. 122 - LAR 17-028 Project stage: Approval ML18085A9392018-04-18018 April 2018 Safety Evaluation Amendment Nos. 122/121 - LAR 17-028 Project stage: Approval ML18085A9322018-04-18018 April 2018 Issuance of Amendment Nos. 122 and 121 Increase in Main Stream Isolation Valve Compartment Pressure (LAR 17-028) Project stage: Request ML18085A9372018-04-18018 April 2018 Amendment No. 121 - Vogtle Electric Generating Plant Unit 4 - LAR 17-028 Project stage: Approval ML18085A9342018-04-18018 April 2018 Amendment No. 122 - Vogtle Electric Generating Plant Unit 3 - LAR 17-028 Project stage: Approval ML18085A9332018-04-18018 April 2018 Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 - Amendments 122/121 - LAR 17-028 Project stage: Approval 2018-03-12
[Table View] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO. 121 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE INSERT 7
7
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in FSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 121, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
Fire Protection Program
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 121