MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
Vogtle PEmails From: Gleaves, Bill Sent: Monday, March 12, 2018 2:10 PM To: Vogtle PEmails Cc: Gleaves, Bill
Subject:
FW: LAR-17-028 RAI Response Supplement This email is intended to capture the email below from W. Sparkman, SNC, to M. Comar, NRC dated March 8, 2018.
From: Comar, Manny Sent: Thursday, March 08, 2018 5:13 PM To: Gleaves, Bill <Bill.Gleaves@nrc.gov>
Cc: Patel, Chandu <Chandu.Patel@nrc.gov>; Patel, Pravin <Pravin.Patel@nrc.gov>; Gleaves, Bill <Bill.Gleaves@nrc.gov>;
Dixon-Herrity, Jennifer <Jennifer.Dixon-Herrity@nrc.gov>
Subject:
RE: LAR-17-028 RAI Response Supplement Thanks Pravin: Now that we have what we needed, please provide the SER soon to Billy Gleaves (Phone 415-5848) who will be following this LAR when I return on March 30, 2018.
Billy: Please enter this email in ADAMs and provide the ML number to Pravin.
From: Sparkman, Wesley A. [1]
Sent: Thursday, March 08, 2018 4:57 PM To: Comar, Manny <Manny.Comar@nrc.gov>
Cc: Dixon-Herrity, Jennifer <Jennifer.Dixon-Herrity@nrc.gov>; Patel, Chandu <Chandu.Patel@nrc.gov>; Aughtman, Amy G. <AGAUGHTM@SOUTHERNCO.COM>; Quarles, Adam Graham <AGQUARLE@southernco.com>
Subject:
[External_Sender] LAR-17-028 RAI Response Supplement On December 15, 2017, Southern Nuclear Operating Company (SNC) provided a response [ML17349A856 (public version) and ML17349A857 (non-public version)] to NRC Staffs request for additional information (RAI) [ML17305B331]
regarding SNC license amendment request (LAR)-17-028 [ML17230A365].
In the RAI response, SNC made statements regarding efforts being undertaken to optimize reinforcement in the walls and floors presented in Tables 1 and 2 of the RAI response. Those optimization statements are beyond the scope of the LAR, and are not necessary to answer the RAIs. Therefore, these statements may be disregarded. The paragraphs which follow Tables 1 and 2 in Enclosures 3 and 4 of the RAI response provided in ND-17-1975 should be considered revised to remove these statements as shown below (red strikethrough indicates deleted text):
Paragraph following Table 1 in Enclosures 3 and 4 The required area of reinforcement of Table 1 is given as a peak value over the entirety of the floor slab. As the reinforcing placement differs throughout the floor slab, the location with the largest interaction ratio increase for a given direction is presented. Note that optimization efforts, independent of this license amendment request (LAR), were recently undertaken to reduce the total area of reinforcement in the floor slab and reduce congestion and improve constructability, with areas as provided in Table 1. In all cases, the maximum interaction ratio of the floor slab remains below 1.0 and is acceptable.
1
Paragraph following Table 2 in Enclosures 3 and 4 The required area of reinforcement of Table 2 is given as a peak value over the entirety of the wall elevation. As the reinforcing placement differs throughout the wall elevation, the location with the largest interaction ratio increase for a given direction is presented. Note that optimization efforts, independent of this LAR, were recently undertaken to reduce the total area of reinforcement in the presented elevation of the wall to reduce congestion and improve constructability, with areas as provided in Table 2. In all cases, the maximum interaction ratio of the wall elevation remains below 1.0 and is acceptable.
2
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 235 Mail Envelope Properties (BY2PR09MB1032629F9D1EB942B2F827949FD30)
Subject:
FW: LAR-17-028 RAI Response Supplement Sent Date: 3/12/2018 2:09:59 PM Received Date: 3/12/2018 2:10:09 PM From: Gleaves, Bill Created By: Bill.Gleaves@nrc.gov Recipients:
"Gleaves, Bill" <Bill.Gleaves@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: BY2PR09MB1032.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3536 3/12/2018 2:10:09 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: