AVERAGE DAILY UNIT POWER LEVEL KlNIH November 1980 DAY AVERAGE DAILY POWER LEVEL 1
2 3
4 5
6 7
9 10 11 12 13 14 15 16 Pg. 2 of 7 8.1-7.Rl (MWe-NET) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DJCKET NO.
50-311
~~~~~~~~
UNIT Salem 112 DATE December 11, 1980 COMPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL
(}Ilvc-NET) 17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31
e e
ClPERATim CATA REPORr IXX:KEl' 00.:
50-311 CM'E :
--;::D~e-c_e_mT"b_e_r,..11,...-, """'1'""9'""8_0_
~BY: L. K. Miller TEIEPH':NE:
609-365-7000 X507 OPERATIOO STATUS
- l. Unit Nane:
Salem 112 Notes:
- 2.
Beport:ing Period:
November 1980
- 3. Licensed~ Paer (M\\'t):
3411
- 4.
Ncmeplate Ratil'lq (Gmss !fie):
1162
- s.
Design Electrical. Rating (Net~):
1115
- 6. Max:iimn Dependable capacity "(Gross Mtle):
1149
- 7.
Maximllm Dependable Capacity (Net Mtle) :
1104
- 8.
U Changes Occur in Capacity Ratings (Items NUl!Cer 3 ~
- 7) Since Last Report, Give Reason:
NONE
- 9.
Power Level To Which Restricted, u Arr:! (Net ?-fie):
5% Thermal
- -:"""~--------------------------------------------
- 10. *Rea.sons Far Restrictions, u Any:
'Pending 'Full Power Operating License
'!his Mcnth Year to Date Cunulati ve
- u. Hours In Rep:)rtin9'- Period 720 5,425 5,425
- 12.
Nllll'ber Of Hcurs Ieactor Was Critical 0
268.2 268.2
- 13.
Reactor Reser.le Shuta:iwn EiJurs 0
0 0
- 14.
Hours Generator On-Line.
0 0
0 lS. Unit Reser.le Shutdown Hours 0
0 0
- 16.
Gress ~
Energy Generated (lffi) 0 0
0
- 17. Gross Electrical Energy Generated (MWH) 0
- 18.
Net Electrical Energy Generated (MolH) 0 0
- 19. Unit Service Factor 0
0 0
- 20.
Unit Availability Factor 0
0 0
- 21. Unit Capacity Factor (Using MOC Net) 0 0
0
- 22. Unit Capacity Factor (Using DER Net) 0 0
0
- 23. Unit Forced OUtaqe Rate 0
0 0
- 24.
Shutdowns Scheduled aver Next 6 M:nths (Type, Date, and Duration of Each) :
N/A
- 25.
U Shut Down At F.nd of Report Period! Estimated Date of Startllp: -----------------------------------
- 26.
Units In Test Status (Prior to Camerci.al. q;ieration) :
'8-"l-7..R2
- Pg. 3 of 7 INITIAL CRITICALI'.IY INITIAL E:Url'RICI'lY
~OPERATION Forecast 6/30/80 9/01/ 80 N/A Achieved 8/2/80 N/A N7A.
NJ.
1 DATE F: Forced S:
Scheduled Page 4 of 7 8-1-7.Rl TYPEl 2
UNIT SHUTIXMNS l\\ND PCMER REiix:TIONS REPORT MJlml November 1980 ME:TIDD OF OORATIOO RE:ASCJif SHlJITIOO (11'.XJRS)
IXMN REAC'IDR Reason:
A-Equipnent Failure(Explain)
B-Maintenance or Test C-Refueling O-Regulatory Restriction LICENSE EVENT REPORT I E--Q?erator Training & License Examination F-J\\dministrative G-q:>erational Err:or(Explain)
~r (Explain)
SYSTEM crt-IPCNENl' ClJDE4 ClJDES 3
~thod:
1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Continuation of Previous Outage 5-Load Reduction 9-0ther 4
DOCKET NO. : __
5_0_-_3_11 _____ _
- UNIT 'NAME:
Salem 112 DATE:
December 11, 1980 COMPLETED By
- L. K. Miller
- ~---------
TELEPHONE:
609-365-7000 X507 CAUSE 1\\ND OJRRECI'IVE ACTION 'ID PREVENI' REOJRRENCE N/A Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (Lm.) File (NUREG-0161) 5 Exhibit 1-sane Source
r--
MAJDR PLANT MODIFICAT.S REPORT MONTH NOVEMBER l980
- DCR NO.
PRINC-IPLE SYSTEM 2EC-0789 Condensate Polishing 2EC-0925 Fire Protection 2EC-0977A Protection System 2EC-0984 Fire Protection 2EC-1004 Fire Protection
- DESIGN CHANGE REQUEST 8-1-7. Rl Page 5 of 7 DOCKET NOi 50-272 salem 2 UNIT NAME.
DATE:
December 11, 1980 COMPLETEn BY:
L. K. Miller TELEPHONE:
609-365-7000 X507 SUBJECT.
Replace Three Ruptured Discs Electrical Penetration Revise Ventilation Fire Barrier Wall 4kv Vital Switch-gear Switchgear Room
1MAJOR-PLANT MODIFICATI<tt REPORT MONTH November 1980 DOCKET NO. :
50-311 UNIT & :
_S_a_l_e_m_/1_2 _____ _
DATE:
December 11, 1980 COMPLETED BY: L
- K. Miller
- OCR NO.
2EC-0789 2EC-0925 2EC-0977A 2EC-0984 2EC-1004 609-365-7000 X507 10CFRSO. 59.
SAFETY EVALUATION This change involves the removal of three existing Fupture discs and piping and their replacement with full relief valves and a larger header.
No changes to the electrical or control systems are involved and no additional fire hazard is created.
Installation of fire barrier between MCC and pressurizer heater switchgear will not impact any safety function, analysis or safety margin.
No USQ is present.
Introduction of fire barriers between the switchgear will enhance the fire protection system.
A USQ is not involved as this change does not alter function or reliability of safety systems.
This change provides additional operator information.
Change involves installation of fire barriers between 4 KV vital switch-gear on Elevation 64' per NRC fire protection bulletin dated 11/20/79.
No safety function, margin or analysis will be affected.
Addition of fire barriers between 460 Volt & 125 Volt D.C. switchgear on Elevation 84' will not affect any safety function, margin or analysis.
No USQ is present.
Page 6 of 7
- DES!GN CHANGE REQUEST
ttREFUELING INFORMATION November 1980 50-311 DOCKET NO.: ~~~~~~~~
UNIT:
Salem #2
~~~~~~~~
DATE:
December 11, 1980 COMPLETED BY : L.
- K. Miller TELEPHONE: 609-365-7000 Ext. 507
- l.
Refueling information has changed from last month:
YES X
NO
- 2.
Scheduled date of next refueling:
March 1982
- 3.
Scheduled date for restart following refueling:
June 13, 1982
- 4.
A.
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO-DATE November 1980 B.
Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO x ---
If no, when is it scheduled?
March 1982
- 5.
Scheduled date(s) for submitting proposed licensing action:
March 1982 (If Required)
- 6.
Important licensing considerations associated with refueling:
NONE
- 7.
Number of Fuel Assemblies:
A.
In-Core B.
In Spent Fuel Storage
- 8.
Present licensed spent fuel storage capacity:
Future spent fuel storage capacity:
- 9.
Date of last refueling that can be discharged pool assuming the present licensed capacity:
Page 7 of 7 8-l-7.R4 193 0
1 ;:170 1,170 to the spent fuel Discharge March 1999