ML18085A120
| ML18085A120 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/02/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider F Public Service Enterprise Group |
| References | |
| NUDOCS 8010240169 | |
| Download: ML18085A120 (3) | |
Text
r" UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-272 50-311 October 2, 1980 Public Service Electric and Gas Company ATTN:
Mr. F. W. Schneider Vice President - Production 80 Park Plaza - 15A Newark, New Jersey 07101 Gentlemen:
The enclosed IE Circular No. 80-22, uconfirmation of Employee Qualifications,"
is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Enclosures:
- 1.
IE Circular No.
80~22 d~~:til.~
/*'~. Grier
- Director
- 2.
List of Recently Issued IE Circulars CONTACT:
L. E. Tripp (215-337-5282) cc w/encls:
~
F. P. Librizzi, General Manager - Electric Productio_!J,..
f E. N. Schwalje, Manager - Quality Assurance j
- R. L. Mittl, General Manager - Licensing and Environment H. J. Midura, Manager - Salem Generating Station
/
R. A. Uderitz, General Manager -
Fu~l Supply Department
...... /
8010240 /~ p
_j
I - **--- -----
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.. 20555 October 2, 1980
- SSINS:
6830 Accession No.:
8006190055 IEC 80-:22 IE Circular No. 80-22:
CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqua.lified individuals as designers/engineers by failing-to confirm the validity or their technical and educational qualifications as presented in their employment applications.
In both of these instances, the employers mistakenly assumed that the personnel firms supplyi.ng these individuals had investigated and confirmed previous career experiences.
In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attentii:>n.
We are hereby recommending that your employment procedu_res be reviewed to determine that your company has in effect employment policies which confirm
_ the professional qua 1 i fi cat ions of employees.
In the event you cone l ude that your present procedures do not fully address this matter, we recommend that you take prompt remedial action in this regard.
No written response to this Circular is required.
If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
IE Circular so-2~
e October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Date of No.
Subject Issue Issued to 80-21 Regulation of 9/10/80 All holders of Refueling Crews a power reactor OL or CP 80-20 Changes in Safe-Slab 8/21/80 All holders of Tank Dimensions a Part 50 or Part 70 Fuel Facility License 80-19 Noncompliance with 8/26/80 All holders of Licensee Requirements a medical l*icense 80-18 10 CFR 50.59 Safety 8/22/80 All holders of a Evaluations for Changes to power reactor Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23i80 All holders of a PWR Jet from Baffle Plate Corner power reactor OL or CP 80-16 Operational Deficiencies In 6/27/80 All holders of a Rosemount Model c510DU Trip power reactor Units And Model 1152 Pressure OL or CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All holders of a Cooling.and Natura.l Circula-power reactor tion Cooldown OL or CP 80-14 Radioactive Contaminati.on of 6/24/80 All holders of a Plant Demineralized Water power or research System and Resultant Internal reactor Ol or CP, Contamination of Personnel and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of a power Westinghouse Fuel Assemblies reactor OL or CP 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of a May Fall Out of Place When power reactor Mounted Below Horizontal Axis OL or CP 80-11 Emergency Diesel Generator 5/13/80 All holders of a Lube Oil Cooler Failures power reactor OL or CP