05000311/LER-1980-023-03, /03L-0:on 800731,chemical Analysis of Refueling Water Storage Tank Revealed Boron Concentration at 1980 Ppm. Caused by Personnel Error.Action Was Taken to Increase Concentration Above Min of 2,000 Ppm

From kanterella
(Redirected from ML18082B099)
Jump to navigation Jump to search
/03L-0:on 800731,chemical Analysis of Refueling Water Storage Tank Revealed Boron Concentration at 1980 Ppm. Caused by Personnel Error.Action Was Taken to Increase Concentration Above Min of 2,000 Ppm
ML18082B099
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/28/1980
From: Newman R
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B098 List:
References
LER-80-023-03L-01, LER-80-23-3L-1, NUDOCS 8009090550
Download: ML18082B099 (1)


LER-1980-023, /03L-0:on 800731,chemical Analysis of Refueling Water Storage Tank Revealed Boron Concentration at 1980 Ppm. Caused by Personnel Error.Action Was Taken to Increase Concentration Above Min of 2,000 Ppm
Event date:
Report date:
3111980023R03 - NRC Website

text

Ctl:ROLBLOCK: ~-'---'~_.____....,

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

~~

1 CD:1:J,

  • N I J I s I G Is I 2 IG)L 0 7

8 9

LICENS.EE CODE 14 15 o I o I o I o I o I - I o I o 101-l I l I l I 1101. I 10 LICENSE NUMBER 25 26 LICENSE TYPE

JO 57 CAT 58
  • CON'T [IE}

7 8

~~~~;UJ©I al 51 ol ol ol 3l 1l 1101ol7l311l8lol©lo lab Isla 60 61 DOCKET NUMBER 68 69 EVENT CATE 74 75 REPORT DATE EVENT DESC.RIPTION AND PROBABLE CONSEQUENCES @

LoJG) 80 [IIIJ I While recirculating the RWST through a temporary demineralizer, a chemical [ill]

[Q]}]

CI:IIl

[]JI]

[ill]

!IE[]

analysis revealed the *boron concentration below the 2000 ppm limit.

Action Statement 3.l.2.8b and 3.5.5 were entered at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.

This is the* first occurrence of this type.

7 8 9 so SYSTEM

CAUSE

CAUSE

COMP, VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SU8CODE 0I]

!RIB I@ w@ L£J@) I z I z I z I z I z I z 18 ~ ~@

7 s

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION

@ LER RO CVENT YEt.R REPORT NO.

CODE TYPE NO.

REPORT I 8 I 0 I L=.J I o I 21 31 1013 I

~ L=J

~

  • ur-..~s < R 2*1 22 23 24 26 27 28 29 30 31 32 NPR0-4 PRIME COMP.

C0:\\1PONENT TAt<Er, ACTION ON PLANT METHOD HOURS 22 SUBMITTED FORM ~UB.

SUPP LI ER MANUFACTURE Fl ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT

~@LliJ@ W@ UJ lo I ol ol ol W@ W W Ix I 9 I 9 I ~

33 34 3!>

36 37 40 41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 42 43 44 [J]I] I Boron was added to the RWST and the concentration increased to 2160 ppm.

The Action ITIII o::m rr:rn rrm Statement was terminated at 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> on August 1, 1980; the procedure for boron analysis was reviewed with the chemical technician.

7 8

9 FACILITY STATUS

% POWER

~

METHOD OF

~

47 so pIJ ~@ !,o I 0 I 0 l@I oTHe~T*Tus ~

. ACTIVITY CONTENT 12 11 I

DISCOVERY DISCOVERY DESCRIPTION ~

~@I Normal Sampling I

44 45 46 80 1""7171RELEASED OF RELEASE

~ w 0 I z Ir.;";\\ I AMOUNT OF ACTIVITY @

7 8

9

'..:::; ~~-

NA I

10 1~1__;~;.._~~~~~~~~~~J.

PERSONNEL E'XPOSURES LOCATION OF RELEASE @

45 80 44 NA r,-r;f NUMBER r::;:;,,

~

I al ol

/8' 1TYP~

1~

DEscR1PT10N 1

s 9

O.~L.-21 NA 11 12

!~~~~~~~~~~~~~~~~~~~~~~~~~"""'."~~~~~~~~~~~~~_J PERSONNEL INJURIES 13 r.T:i NUMBER Q

~

! cl al ol@ DESCR:~oN6 11

~2~::~~~~~~~~~-:-~~_:_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

80 BO LOSS OF OR DAMAGE T EE W0 DESCRIPTIO~ FACILITY@

10 PUBLICITY NRC USE ONLY 1

a 9

'.::.:J~~~NA:~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~:

[I[§] r~Erf44\\ DESCRIPTION@

1 8

9

'.;:::,;~~~N~A~~~~~~~~~=--~~~~~~~~~~~~~~~~~~~~~_J 00 II I II I I I I II I!

. 10 NAME OF PREPARER R. J. Newman e1009090 IJ~O 68 69

. PHONE:

609-935-0998 80 ;

0 a.