05000311/LER-1980-021, Forwards LER 80-021/03L-0

From kanterella
(Redirected from ML18082B008)
Jump to navigation Jump to search
Forwards LER 80-021/03L-0
ML18082B008
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/28/1980
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B009 List:
References
NUDOCS 8009030585
Download: ML18082B008 (2)


LER-1980-021, Forwards LER 80-021/03L-0
Event date:
Report date:
3111980021R00 - NRC Website

text

    • .

e OPS~G Public Service Electric and Gas Company 80 Park Place Newark. N.J. 07101 Phone 201/430-7000 Mr. Boyce H. Grier Director of USNRC Off ice of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 80-21/03L August 28, 1980 Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.~.l, we are submitting Licensee Event Report for Reportable Occurrence 80-21/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

)

. /1.*r J

//" l./'Z. t..-.....(,

)--r--..

F. P. Librizzi General Manager -

Electric Production CC:

Director, Office of Inspection and Enforcement (30 copies)

.Director, Office of Management Information and Program Control

( 3 copies) l!IO:l-1!17.~

~~

  • n:rnsor SElllll"E 95-2001 (200MI 2-78

Report Number:

80-21/03L Report Date:

8/28/80 Occurrence Date:

7/29/80 Facility:

Salem Gene~ating Station, Unit 2 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Containment Air Lock Elevation 100' Inoperable CONDITIONS PRIOR TO OCCURRENCE:

Mode 3 DESCRIPTION OF OCCURRENCE:

During a routine entry into the containment, the latch for the exterior door would not close.

Action Statement 3.6.1.3 was entered at 1040 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.9572e-4 months <br /> which requires with one containment air lock door inoperable:

1.

Maintain at least the operable air lock door closed and either restore the inoperable air lock door to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or lock the operable air lock door closed.

2.

Operation may then continue until performance of the next required overall air lock leakage test provided that the operable air lock door is verified to be locked closed at least once per 31 days.

3.

Otherwise, be in at least Hot Standby within the next six hours and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Equipment Failure ANALYSIS OF OCCURRENCE:

A broken latch pin was found.

The operable door was maintained closed.

CORRECTIVE ACTION

The broken latch pin was repaired and the door retested satisfactorily.

The Action Statement was terminated at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />.

FAILURE DATA:

Not Applicable Prepared By R. J. Newman SORC Meeting No.

Manager -

Salem Generating Station 66-80