05000311/LER-1980-008, Forwards LER 80-008/03L-0

From kanterella
(Redirected from ML18082A874)
Jump to navigation Jump to search
Forwards LER 80-008/03L-0
ML18082A874
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/08/1980
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML18082A875 List:
References
NUDOCS 8008140310
Download: ML18082A874 (3)


LER-1980-008, Forwards LER 80-008/03L-0
Event date:
Report date:
3111980008R00 - NRC Website

text

i'

(.:~ PS~G Public Service Electric and Gas Company 80 Park Place Newark. N J 07101 Phone 201 430-7000 Mr. Boyce H. Grier Director of USNRC Augu!lt 8, 1980 Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvahia 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 80-08/03L Pursuant to the requirements of Salem *Generating Station Unit No. 2 T8chnical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 80-08/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) soos1403/D 95-2001 (200MI 2*78

Report Number:

Report Date:

80./03L 8/8/80 Occurrence Date:

Facility:

July 10, 11, 12, 14 and 16, 1980 Salem Generating Station - Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Cont.ainment Air Locks Inoperable CONDITIONS PRIOR TO OCCURP.ENCE:

Mode 3, Prior to Initial Critjcality DESCRIPTION OF OCCURRENCE:

During a six day period of time with frequent entries into the Con-tainment, the air locks failed the surveillance requirement because the door seal leak rate was greater than O. 01 La when the air,rolnme between th~ door seals was pressurized to and maintained at greater than or equal to design pressure, 47.0 psig.

In each instance, Action Statement 3. 6.1. 3 was entered which r_equires with one containment air lock door inoperable:

1.

Maintain at least the operable air lock door closed and either restore the inoperable air lock door to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or lock the operable air lock door closed.

2.

Operation may then continue until performance of the next required overall air lock leakage test provided that the operable air lock door is verified to be locked closed at least once p~r 31 days.

3.

Otherwise, be in at least Hot Standby within the next six hours and in Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The following lists the date, times and duration when the Action Statement, 3.6.1.3, was entered:

Date l) 7/10/80

2)
3)
4)
5) 7/11/80 7/12/80 7/14/80 7/16/80 Entered 0830 1210 1250.

1925 1200 Terminated 1043 1255 0600 2230 1412 Total Time in Action Statement 2 Hours 13 Minutes 45 Minutes 17 Hours 10 Minutes 3 Hours 5 Minutes 2 Hours 12 Minutes

I LER 80-08/03L 2

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

~~~~~~~~~~~~~~*

  • ~~~-

Personnel error resulting in improper air lock operation *

. ~NALYSIS OF OCCURRENCE:

During the last half of 1978, similar entries into the action statement occurred on Unit 1.

The training program for controlled access areas and the requalification program were upgraded to include an explanation of the operation of the air locks.

After one year, the explanation was deleted from the requalification program.

CORRECTIVE ACTION

Upon entry into the action statement, maintenance personnel repaired the leaking seal by repositioning the gasket into its seating position and performing the applicable surveillance procedure satisfactorily.

The air lock operation presentation in the tr~ining program has been further upgraded to explain correct operation techniques.

In addition, the upgraded air lock operation presentation will be

  • added back to the requalification program.

FAILURE DATA Not applicable Prepared by~~~-M_.~J_.~M_u_r_p_h_y_

Manager -

Sa SORC Meeting No.

58-80