Monthly Operating Rept for May 1980
ML18082A551
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/10/1980
From: Miller L
Public Service Enterprise Group
To:
Shared Package
ML18082A550 List:
References
NUDOCS 8006160012
Download: ML18082A551 (17)


Text

r AVERAGE DAILY UNIT POWER LEVEL MONTH May 1980 DAY AVEAAGE DAILY POWER LEVEL (MWe-NET) 1 1113 2

1112 3

1103 4

1100 5

-1074 6

1115 7

1101 8

1106 9

1098 10 1103 11 1043 12 918 13 1074 14 1100 15 1110 16 1069 Pa.

2 of 18 0 8.1-7.Rl 800 616 OOf l-50-272 OOCKET NO.

~~~,,...----..---..-~~

Salem tll UNIT

~~~--..-~~--..-~

DATE June 10, 1980 CQ.'vlPLETED BY L

  • K. Miller TELEPHON""E 609-365-7000 X507 DAY AVEAAGE DAILY POWER LEVEL (MWE-NET) 17 1021 18 1108 19 1088

-20 1113 21 1094 22 1093 23 900 24 0

25 989 26 554 27 1086 28 1111 29 1116 30 1100 31 1113

l. Unit Naoe:

Salem Ill

2.

Psportinq Period:

May 1980

3.

Licensed 'nlerltal Poler (!+ft):

3338

4.

Naiiepl.ate Rating (Gmss lofie) : ___

.,,.1.,,.1.,,..35,,,...._ ___ _

s.

Design Electrical Rating (Net lofie): __

1_0_9_0~,........,--

6.

Maxi.mllm Dependable capacity '(Gross M>Je) : ___

1_12_4 __

7.

Maxi.mllm Dependable Capac:i. ty (Net MWe) : ___ 1_0_7_9 __

Notes:

i:x:x:::KET ro. :_50_-_2_1_2 _____ _

CATE :

June 10, 1980 CIM?IZl'ED BY: L. K. Miller

~:

609-365-7000 X507

a. If Changes Occllr :iJl Capacity Rat:iJlgs (Itene Nl.lll'ber 3 ~
7) Since Last Report, Give Reason:

NONE

9.

Power Level To Which Restricted, If lm:':f (Net ?fie) : ___

N_O_N_E ________________ _

10.

Reasons For Restrictions, If lm:y: ____

N_O_N_E _____________________ _

ll.

12.
13.
14.

lS.

16.
17.
18.
19.
20.
21.
22.
23.

Hours In Rej;orting Period NullCer Of. Hours Reactor Was Critical Reactor Reser.le Shutd:Mn SJurs Hours Generator On-Line.

Unit Reser.le Shutd::Jwn Hours Gmss 'lbemal Energy Generated (.1-fiH)

Gmss Electrical Energy Generated (ma)

Net Electrical Energy Generated (M'IH)

Unit Service Factor Unit Avai JahHity Factor Unit Capacity Factor (Using MOC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced OUtage Rate

'Ibis ~th 744 720 0

712.4

o.

2,320,788 795,480 762,859 95.8 95*.8' 95.0 94.1 4.2 Year to Date T,647 3,532.6 0

3,425.7 0

10,550,702.4 3,583,020 3,430,589 93.9 93.9 87.2 86.3 6.1

24.

Shutdcwns Scheduled over Next 6 ~ths (Type, Date, and Duration of Each) :

Refueling - 9/20/80 - 12/7/80 CtJnul.ati ve 25,608 13,620.6 22.7 12,956.8 0

38,086,999.4 12,750,520 12,060,179 50.6 50.6 43.6 43.2 38.2

25. If Shut Dcwn At End of Report Period! Estimated Date of St:artl.lp: ___

N_f_A ____________ _

26. Units In Test Status (Prior to camercial cperation) :

8-l-7.R2 Pg. 3 of 18 Forecast 09/30/76 11/01/76 12/20/76 Achieved 12/11/76 12/25/76 06/20/77

00.80-008 80-110 80-112 80-114 80-116 80-118 1

DATE TYP~

5/11/80 F

5/12/80 F

5/16/80 F

5/16/80 F

5/23/80 F

5/25/80 F

F: Forced s: Scheduled Page 4 of 18 8-1-7.Rl 2

UNIT SlllmXMNS /\\ND PCMER RErix:rIONS REPORI' MJ1'1I'H Me.y 1980 METIKJD OF OORATICN

~

SHUITl~

(IDJRS)

IXMN RFJ\\C'IDR 0

A 5

0 A

5 0

A 5

0 A

5 31.6 A

3 0

A 5

Reason:

A-~uipient Failure(Explain)

B-Maintenance or Test C-Refueling O-Regulator:y Restriction LICENSE EVEN!'

REPORI' I E~ator Training & License Examination F-Mninistrati ve

~ational Error(Explain) ff-other (Explain)

SYSTEM crMPrnENl' CODE4 CODES HH FILTER HH FILTER SD VALVEX HH FILTER CH VALVOP HH FILTER 3

~thod:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0th,er Clean till Strainers Clean till Strainers 50-272 DOCKET NO.:

~~~-,,.~~~~~

UNIT *NAME:

Salem Ill DATE:

June 10, 1980 COMPLETED BY:

L. K. Miller

~~~~~~~~~

TELEPHONE: 609-365-7000 X507 CAUSE J\\ND CORROCI'IVE ACTION 'ID PREVENT REOJRRarn Condensate Pump Suction Heater Drain Pump Suction Containment Penetration - Valve 1SS33 Malfunction Change #11 Condensate Pump Suction Strainers

  1. 11 Steam Generator Feedwater Control Malfunction till Heater Drain Pump Flange Leak 4

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1-Sane Source

MAJOR PLANT MODIFICA~S REPORT MONTH May 1980

  • DCR NO.

PRINCIPLE SYSTEM lED-0033 lED-0060 Shielding Doors eves lED-0089 Heater Vents & Drains 1ED-0097A Steam Generator Blowdown lED-0115 Analyzer Room lED-0291 Heating Water

  • lED-0315 Fire Protection lED-0341 Aux. Feed Room Cooler lEC-0373 Steam Generator Feed Package 19 lEC-0379 Main Steam 1EC-0458A Control Air lEC-0466 Fire Protection lEC-0469 TGA Structural 2EC-0520 SW Pump Motor lEC-0543 Pressurizer lED-0591 MSR lEC-0593 Pipe Support lEC-0714 Safety Injection 2EC-0738 Safety Related Piping lEC-0739 Radiation Monitoring lOD-0018 Chilled Water lOD-0024 W.D. Gas lPD-0116 Feed and Condensate lSC-0021 Aux. Building lSC-0288 Non-Rad Liquid waste
  • DESIGN CHANGE REQUEST 8-1-7. Rl Page 5 of 18 DOCKET N0**~5~0~-~2~7~2~~~~~~~;__

UNIT NAM. Salem 1

__;::__;_~~~~~~~~~...:__-

DAT F.:

June.10, 1980 COMPLETEn BY :

L

  • K. Miller TELEPHONE:

609-365-7000 X507 SUBJECT Incore Interlock Vacuum Breakers Add Pipe Restraint Modify Drains Replace Door Modify 1HW214 & 219 Install Fire Rated Doors Relocated TD-757X Condensate Polishing Tie In to Existing Plant Systems Modify Mounting Install Air Receivers Install Couplings Install Mono Rails Replace Cooler Add Limit Switches Modify 12 W MSR Modify Pipe Supports Remove Alarm Switch and Level Indication From LIT921 and Replace With Separate Indicating Switch Pipe Support Changes Change Alarm and warning Setpoint Install Flowmeter Replace Valves and Tubing Modify to Correct First Stage Pressure Indication Reverse Wires 1&2 at TB7-20, TBB-1 Change Discharge Setpoint

.MAJOR PLANT MODIFICATictt DOCKET 1'.:

50-272 UNIT N _.., :

Salem 111 REPORT MONTH May 1980

~~~~~~~~~~~~

DATE:

June 10, 1980

  • DCR NO.

lED-0033 lED-0060 lED-0089 1ED-0097A lED-0115 lED-0291 lED-0315 lEC-0341

~~~~~~~~~~~~~

COMPLETED BY:

L. K. Miller

~~~~~~~~~~~~

TELEPHONE: 609-365-7000 X507 10CFRSO. 59.

SAFETY EVALUATION Interlocking the incore cable drive reels will not increase the probability of occurrence or the consequences of an accident.

It will not create a malfunction that had not been previously evaluated.

The subject design change request is non safety related and does not impair any safety related system function.

The definition for an unreviewed safety question is not met.

Additional support is required to alleviated excessive vibration to the M.S.R. shell Nos. 15 & 16 FWH drain pipint.

This design change does not affect any prese-::i.tly performed safety analysis nor does it create any new safety hazards.

The bases of the Tech. Specs. are not affected.

The system is non-nuclear, non safety related.

This DCR requests rerouting blowdown sample drains from the laboratory drains to the chemical waste basin.

This cha.nge does not increase the probability of or consequences of::an accident; create a possibility for an accident or reduce the margin of safety as previously defined.

System 6r piping is not safety related.outside of containment.

The bases of the the:.Technical Specifications are not affected.

This. is a non safety rel~ted change.

This change is not safety related and does not have any adverse effects on safety related equipment.

The changing of these doors does not increase the probability of occurrence or increase the consequences of an accident or malfunction of equipment important to safety previously*evaluated in the safety analysis report and does not create the possibility for an accident or malfunction of a dif-.

ferent type than evaluated previously in tte safety ~nalysis report.

The changing of these doors does not affect the bases of the Tech. Specs.

This change is safety. *'related.and does.affect. safety related systems.

The purpose of this change is to relocate a thermostat so that temperature can be controlled properly within the pump room.

lEC-0373 This design change is not safety related and does not affect any safety

lEG-0379 This change does not functionally change the design of the system.

This change improves the physical mounting.and is in conformance with approved seismic mounting methods.

Page 6 bf 18

  • DESIGN CHANGE REQUEST

MAJOR PLANT MODIFICATI~

DOCKET }iJE.:

50-272 UNIT N-:

Salem tfl REPORT MONTH May 1980

~~~~~~~~~~~~

DATE:

June 10, 1980

  • DCR NO.

lEC-0458A lEC-0466 lEC-0469 2EC-0520 lEC-0543 lED-0591 lEC-0593 lEC-0714 2EC-0738 lEC-0739 lOD-0018 COMPLETED BY:

L. K. Miller

~~~~~~~~~~~

TELEPHONE: 609-365-7000 X507 10CFRS0. 5 9.

SAFETY EVALUATION The subj"ect design change request is non safety related and does not impair: any safety related system function.

The changes will improve system performance and reliability.

This design change does not affect any presently performed safety analysis nor does it rreate any new safety he.zards.

The bases of the Technical Specifications are not affected.

Supports for troll?Y beams are temporary and do.not affect the safety of the plant.

This does not constitute an unreviewed safety question.

This change does not impair safety fuiictions, decrease safety margins or jeopardize safety analysis.

These changes are being made to minimize motor cooler: maintenance.

The design change will serve to expand operator information only.

The change does not alter the functional operation of the valves.

All the changes proposed in this DCR are in non safety related systems and they do n0t interfere with any safety related systems, therefore, it will not affect the safety evaluation of any other system.

This DCR incorporates design changes to implement the provisions of NRC Bulletin 79-02 which deals with additional design conservatism and verification of ins.tallation of pipe supports.

As such, the changes _

covered by this DCR will not present and unreviewed safety question.

This change removes the alarm switch and indication:from LIT-921.

It does not alter the function of the level loop nor does it affect any other safety related functions or create*:.any new safety hazards.

Thi:s DCR concersn only hanger changes as required by* NRC Bulletin.79-07.

All designs will.not functionally alter any safety systems, nor will they create or aggravate any safety hazards.

The current setpoint of the 1R31 channel is too low in that it will cause an alarm if the coolant activity is slightly higher than the expected equil-.

ibrium activity.

The revised setpoint will be based upont he fuel leakage which is permitted by Technical Specifications.

This change is not safety related but is required for surveillance SP(O) 4.0.5P.

This provides continuous flow measurement for the chilled water pumps dischQrge.

Page 7 of 18

  • DESIGN CHANGE REQUEST

.MAJOR PLANT MODIFICATI~

REPORT MONTH May l980 DOCKE~~*:

50-272 UNIT Salem Ill

~~~~~~~~~~~

DATE:

June 10, 1980

  • DCR NO.

lOD-0024 lPD-0116 lSC-0021 lSC-0288

~~~~~~~~~~~~

COMPLETED BY:

L. K. Miller

~~~~~~~~~~~

TELEPHONE: 609-365-7000 X507 10CFRSO. 59.

SAFETY EVALUATION This change is not safety related and does not affect safety related equipment.

Basic system design remains unchanged.

Design change will facilitate system surveillance.

This change is safety related but corrects the control action for each individual valve.

Circuit change if for valve heaters.

This setpoint change is not safety related and does not affect any safety related systems or the safe shutdown of* the unit.

Page 8 of 18

  • DES!GN CHANGE REQUEST

,--*---.,.---------------------------------------~-------------- - --------- -------------------------------- -----------~

r..

~

~ f-:+---------------------------------------------------------------------------------------1-"1; J 3 'I

~~~ ! ~ ~ M ~ ~ T, WORK ORDER NO-.--------~ AF (fi*-~~ ~~~E~~ ~~0H-~~~-,)~ ~-~ ~~ o~ ROE-R *cnr. -. -- -------------------------- ------- __________

0_0_0 __ 1 _________ ~

6

("

6 WORK 7

r-::-=-:=-=-:::-------------------------------------------------------------------------<8 1

ORDER 9

a NUMBER OEPT

~QUIPMENT IOENTIFICATIDN EXPLANATTON nF WORK PERFORMED

~

91---------------------------------- *------------------*--------------------------*---------------------------------------------2 I

10 13 11 OP0497 M

VALVE, 1CV275 15 12 16 13 DESCRIPTION OF PROBLEM, SEAL WELD *RONNET TO BODY.

17 18 /

~ 14 15>-----------------~:~;:-~~*>_}~-~**~;-,~;~;;_~--~--* __ c~_n_R

__ R

__ E~C_T_I_ Y_L~CT ION'-----~.§ _

_F'_EU_r:-i_~ T_Ruc_!_J_O_N __

s-=-"-* -----~**+* -~""'-'-'-*-------------------- ;:

16

\\

17 906018 M

VAL.VE, 14SW005 1.1 22 23 II ::

[: {(

le 1------:-~.-:--:-::-,.\\_-~.-:----;-----,--:---,-~-o~E~S~C~R~I~P~T~I~O~N-,;;-O~F-=p~RO~A~L~E--.M~,--------;;E~R~R~O~D~E~O-;;.-S~P~O=T-O~N~V~A~L~;v~E~.-;-L~I~N~t~N~G.----;cM~I~S~S~I7.N~G--------------tlll~~

19

)

20 21 22 1----------'---~-----.c_ ______

C_O_R~R-E_C_T_I_V_F ___ A_C_T_l_O_N_,_

) 23 AT SAME SPOT.

REPAIRED RU~BER LINING OF VALVE USING BAL ZONA.

2 41-::~.-==----,.,------,-~-,-,;;-;-:=-:-::-:-:-==---::--,--=-:==:-=-=-=---,-;-c-=-=o--,--.,----------------------------------------------__.j32 25 912339 M

.. *'STRAINERi 11 _SERVICE WATER 33

)

26 34 21>--------~---------~---D~E_S~CR_IPTION OF PROBL'--E"-M--',, ______ P_A_C_K_!~G_L_~A~_!_--~~------------------------------136 h 2e 31

~ 29 cnRRECTIVF ACTION, REPACKED.

e 30 40 31 913351 STRAINERi 11 SERVICE WATER M_

)

32

~ <

33>--____________________

D_E_S_C __ R_I __ P

__ T __ I_O_N_O __ F __ P __

R_Q~~-~~*-___

ST~~-I~~~~-~~~_T_G

__ L,_A __ N_D_L,'-E_A_t< __ I_N_G_B __ A_D_L_Y_. ___________________ 4*1 45 34

.. '\\

35 cnRRECTJVE ACTION, REPLACED WORN PACKINr..

~ (

36f-="'""'"=-=------,c:-----~~~~~--~~~~~----------------------------------------------------l48 31 913352 M

STRAINER, 11 SERVICE *WATER 49 :: (

1-----------'----------------0'-.E=-S=-C.:._R_I!_T_I_q~--~-P-~!JB L_F.:!4_*-----~-~r-~ ;-~~~tr~ Y.~~~~h: o~ ~ ~ ~i~~~-~~-&~t~E-A~L~A~R~M-I e-::

ANNUNICIATING.

55 \\:

38

  • 21-------------------------~-~---~-----~---------~---------------------------l55 43 CORRECT! VE ACT InN, REPLACED DEFECTIVE PRESSURE DEVI SE.

57 44 58 59 "i--q_1_3_4_0_1 ____ M _____

V_A_L VE, 12 SW046

  • --------------*----------------- ____ ----------------------------------------------160 GI 46

~ a

. ~ 2 *~

DESCRIPTION nF PROBLEM, VALVE INDICATOR INDICATES VALVE CLOSED

i------------------*._*. ~---*-* -----------'--_______

W_H_E __ N __ v __ A_L __ V_E ____ I s ACTUALLY L~_C=--K=-Ec:D __ o

__.:_P_c_:E_N_:*_" _________________ :;

) 50

~

~

>---------------------------*- ---------------------*---------**-***-**-*-- - --- -----------------------*------------------~

u

~

j 53 M

n s5i----.,-----.,---,.-.,---...,.---,---c------------------------------------,-.. ----------------------------13 J 56 57 74 Paqe 9.of 118

~--------~----=--=--.:;_;_:-=-"---*----*~-------*-*-----------*------------------*--***---** -*-* -- --*---*---- *-*- --* --*----*-------------*---*-*---*------**--*-- --- --------*- -------------**----'-

)

r f

  • 1**~----------------------------------------------- --------- -- ------*-- ----------------------------------

~ r e

e e

~

c.l ~

iF*H-----------------------------------------------------~-----------------------------

8 1

2

  • 3 3

SORTED BY SALEM GENERATING STATION

'-(ffPARTMENT, WORK ORDF.R NO.

s AF ET v--R~-*L*A-r1:0- 'Ef.l*ur -PMENr-**\\,iO'R K-- ORD-ER--cor:;-***-**

0002 I

6 WORK 7

ORDER 8

NUMBER 10 11 DEPT EQUIPMENT IDENTIFICATION EXPLANATION OF WORK PERFORMED

__ 1?.

~--------------------------------------------------*--*-*-------*---*--*--------~-------------------------------

10 13 11 14 15 TIGHTENED VAVLE INDICATOR IN OPEN CORRECTIVE ACTION,

" 1------~--~--,---,---,---,--,---,---,--,---------,,-------~----P-O_S~ITION.

16 13

'I 14 Cl13454' M

15 16

)

17 18 19

~

,.I 20 21

'STRAINER, 15;$ERVIC~ WATER CORRECtIVE ACTiDN, 15 SER~ICE WATER PUMP STRAINER DELTA P GREATER THAN 15 PSIG WITH CONSTANT BACKWASH.

CLEANED STRAINERS AND INSTALLED NEW PACKING.

17 18 19 20 21 22 23 24 25 26 27 28 29 r---------~-~----~-------------~-------------------------------------------------l 22

)

23 Cl13472 M

STRAINER, 24 25

.,~.',

D 26 27 28

)

29 I

30 Cl134Cl3 M

FAN COIL 31

~

32 33 11 SERVICE

\\~ATER

- i?ESCRIPTION 'OF PROBLEM, CORRECTIVE ACTION, UNIT, 15 DESCRIPTION OF PROBLEM, 11 SERVICE WATER PUMP~.STRAINER PACKING*

GLAND LEAKING AROUND PACKING HOUSING.

REPLACED PACKING AND GLAND.

15 FAN COIL UNIT WILLI NOT START ON HIGH SPEED. UNIT WILL RUN ON LOW SPEED.

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 r--------~-----------'--------------'--------------------*------*-------------

45 34 35 46 47 CORRECTIVE ACTION, REPLACED DEFECTIVE RELAY.

36 4B 37 Cl13522

  • M
'FANI l1 CONTROL ROD VENT 49 50 38 51 39 40

--:~

DESCRIPTION OF PROBLEM, FAILED TD. ~-~T____B_~i! __ l_~_lCATJ;_QN_!_~~l_S_. _________________ ~

>-----------~------------------*------~-----------R-uNNI~frf~

41 42 I

  • 3 p "

45 46

47 48 49

)

50 51 52

)

53 54 CQRRECTJVE ACTION, ADJUST~D LIMIT SWITCH ON DAMPER 1CAA006.

Cl13575

FAN, 1~ FUEL HANDLING BLDG EXHAUST 54 55 56 57 58 59 t----------~-----~~---~-*----------~-----------*----------.. ------ ------*- --*--**------*--*--------------*--------------------------j6o 61 62 63

~--

~

r--:----:----,----------~---:-------------------------------------------------------------------------165 1----------------------------*-----------------*----------------*- -.... -.

f-----------------------------------------------------*----------------

66 67 68 69 70 71 72 55


173 74

(

('

/

(

(

j 56 75 i.....

57 76

~------------*----~--------------------------**-------------- ---**- ***-*-****--*--*- --** - -

--.-----~----* - - ------*- -----------**-*----------* - ------- - --- -----------------

Page 10 of 18

"\\

~-~---.-------------*----------------~---- ------- --- -- --- -- -- -----------------------------------------------------~

~

1-1--------------------------------------------------------------------------------------------------+-'-

"\\

2 3

SORTED BY SALEM GfNERATING STATION

,f5EPARTMENT, WORK ORDER NO-.---------SA.FETY-R~l.Atf.b--i::f.lLl'.(P-ME~Y WORK rJR[fER--CnG--

"\\

5 00 03 5

6 7

6f---W~O~R,..,K==-------,-------------------------------------------------------------------------<8 1

ORDER 9

10

(

0 NUMBER 11 DEPT EQUIPMENT IDENTIFJCATJON EXPLANATION OF WORK PERFORMED 91-----------------------------------------------*------ ***--*---------*---*------------------ --------------------------------- 12

,3 10

"\\ 11 OESCRIPTION OF PRORLF.M, t RELT OFF PULLEY AND OTHER 3 ARE SLIPPING 15 121-----,-----~,...---------~-------~------------~-------*-------------------------------~16 g

1 CORRECTIVE ACTION, REPLACED BELTS ON FAN~

u 14 J.

18

1-9~1~3~5~7~8----'-*~M-'--~-~C~D~O=LER,ll~~ci~~~~NUUMP~~M~-------------------,-.*_--'.-,,i,-.-~~.*~~------------------~~1

-* ~'..'(.

) 11 OESCRIPTION OF PROBLEM, ROOM COOLER LEAKING FROM UNDER-INSULATION.

18

,9, ::

19 CClRRECTIVE ACTION, INSTALLED.125 INCH RUBBER COMPRESSION

) 20

  • PATCH 0 VER LE AK WITH H 0 SE CLAMP *

~: (

21 221--o9~1~4~b~4--8--~~M'--'---*-S~T~R~A-I-N~E~R-,-1~3-S~E-R_V_I_C_E_W_A_T __ E_R __________________ _

) 23 24r-----~~~~-~----------___::.D_;;:E_S-=C_R~I_P-'-T-'-I-=O_N--'O-'F---'-P_R--=O'-A-"'L:..::E'-M--",------'S'-H--'E'-'A-'-R-P IN A ROK EN.

25

) 26 CORRECTIVE ACTION, REPLACED KEY AND 2 L_DWER SHOES.

)

29 301----------,-------------D_E_S_CRIPTION OF PROBLEM, PACKING LEAKING.

31

~ 32 CORRECTIVE ACTION, REPACKED.

33 3* 917832 M

PUMP, 13 COMPONENT COOLIN¢

) 35 36 OESCRIPTION OF PROBLEM, NO. 13 COMPONENT COOLING PlJMP 31r---------------------------------~-----H-A--s*--A--I~NAOARD SEAL LEAK.

) 38 42 43 DESCRIPTION OF PROBLEM, 59 "i--------~--------'-'-'---'"-'-.

""---'-~--*- ------------------ --~~l)S~'-------- _ER ROS I ON I CORRO~ ~O~--"--------*--*----------*- ------------------ so 61

'6 48 49 921037

) 50 51

~*,*

~

-. VALVES, 1 SJ 5.* AND 1 SJ 7 4 cnRRECTIVE ACTION, REPLACED VALVE.

63

____________ _,6*

65 66 67 1-------------------------------*--------*----------------------* ------ -*--- -*


-----*------- **- -----*-------------*-------*------*-------------------1::

52 70

1 53 71 *1 54 72 551--------------------------------------------------*-------------------------------------173
J 56 57

~--------------------------------*-*-*------------**--*--*--*-*-*----* --*-*-**

)

Page 11 of 18 75 76

'I


* --------- -------- ----------- *---------------~

~

H-------~---------------------,---------------*--------------------------------------1-f 3

SORTED BY SALEM GENERATING STATION 3

4

  • °DEPARTMENT. WORK ORDER NO. ----------SAF-ETY--RFLA°fEr5-tf,iTj-,=-p-MEl-ff wcl'F?i nR1iER LOG DEPT EQUIPMENT IDENTIFICATION DESCRIPTION OF PROALEM, CORRECTJVE ACTION, EXPLANATION OF WORK PERFORMED ROTH VALVES ARE LEAKING.

TIGHTENED--*UP ON PACKING.


12 13 14 15


11G 17 18

.__ _______ M ____

s _TR A_! NE R, 16 ~

0SER VICE. w A__T __ =ER ____________________________________________________________ --->------------------------------;~

. : :*: ~. -. ::.:' :-

21 DES CR IP TIO N OF PROALEM, STRAINER DIFFERENTIAL PRE:SSURE -APPROX.

8 PSI WITH STRAINER CONTINUOUSLY 1------------------,-.,.------------------------~B~A~'CKWASHING;-

22 -

27 CORRECTIVE ACTION, CHANGED PLUGGED STRAINERS.

28


RENEWE1iPA-CK r-tif(;---rnD THRUSTBE AR-I NG. --------------------20 30' 31

,__ ______ M ____

A_I_R_C_O_M_P_R_E_S_S_O_R~*-1_3_A_D_I_E_S_E_L_S_T_A_R_T_I_N_G_, _______________________________________________ _,32 33 DESCRIPTION OF PROALFM, STARTING AIR COMPRESSOR IS LOSING OIL ANO OIL WAS FOUND IN STARTING AIR _______________ _,36


REC-EI VER-~--- -------- -

CORRECTIVE ACTION, INSTALLED A NEW COMPRESSOR.

38 ('

39 40

  • II M

'PUMP,.12 COMPONENT COOLTNG

  • 12 (

43 DESCRTPTION OF PROP.LEM, CORRECTIVE ACTION, M

INFH'.YA R 0-PUMP -1roin NG HA SS[TGHrurrc--*-----------------------

45 MOVEMENT.

REPLACED OIL SEAL AND RESET THRUST BEARING HOUSING.

-1~

50 51 52


~~

55 DESCRIPTION OF PROP.LEM, REPAIR MISCELLANEOUS CABLE DISCREPANCIES.

56 1-----------------------~---"'-'------'----'----------- -*--*-------**--*---

-~---------------157 CORRECTIVE ACTION, SATISFIED CARLE: AUDIT INSPECTION SHEET.

58.

59 60

.. - ~'.

1-----------------'----------------------------------------------------

r-----~-----------------------------*------------*----------*--*-**--**--*-*. --*--*- *-

62 63


1" 65 66 67 68 69 70 71 ~

72 r----,-----,,----,-,---,------,-----:-----------------------------------------------------------173 74 75 *-

76

~-------------------------------------------------------~---**------**--

-*-*---~ **--* **-**** -.. ****---*----****--------*----------*------------*------ - - *--------*----

Page 12 of 18

e

. j:

I

1-,~ ----------------------------------------------.------ ----------------------~

~I-+-----------------------------------------------------*-------------------------------------------~

I I

'"\\

3f---~ORTED BY SALEM GENERATING STATTON r : DEPARTMENT, WORK ORDE""R---N-n*.--------S-A-cF_E_T~Y--RE LAT E_D ___ E i;l'u'fii_M_E Nf-l'TOR-1( OR f)(R *car,*--- ---------------.. ---------- --------------------------

6 WORK 1

ORDER

~* 8 NUMBER

DEPT, EQUIPMENT IDENTIFICATION EXPLANATION OF WORK PERFORMED
  • 3 0005 10 II

!-------------------------------~---------------*---**-------------------------***----------------------------------!

12 10 13 14 15

" ' II q 1311111 p

GENERATOR, lC DIESEL 12 16 131--------------.-------------.-0_E_S_C_R_I~P-T_T_O_N_O_F_P_R_O_B_L_E_M_, _____

O_E_S_I_C_A_N_T_l_*N_S_T_A_R~T-I_N_G_A_I_R ___

D~R-I_E_R_I_S_W_E_T ________________

--1 17 14 WITH OIL.

15

." ;~~::.;~i~~~.~,:~~.. ~.. ~\\:,.

161-----~-----~~------.~-:~S.-?

  • . -~r*,,-'*\\-~\\1~i~~

..,:-.-~c-~o-R_R_E_C_T_I __ V_F~ __ A_C_T_I_O_N_, ____ R

__ E_P_L_A_C_E~D DESSICANT.

) 11 REPLACED LEFT TOWER PURGE CHECK VALVE.

181-----:--------,----,=---.---.-.-------,---,,-----,--,.,-..,,.__.=-.:""""-..-.-----;------,-------.--------R~E~P~L~A~C~E~D:_-D~E~S~S~I~C~A~N~T:__.:I~N_:__M~O~I~S~T~U~R~E~I~N~D~I~C~A~T~O~R~.=---------------lll.. ~

<*'*,,. 1'
';'": '",

.~;

~

18 19 20 21 22 23

-24

~25 26 27 28 29

) 20

'H 3510' i> - - < 1'.ViTAL*' HEAT TRACE;, CIRCUTr 603:

21

,-_:.)- - ' '*

221--------------~--------D~E=s~c~R~I~P~T~I~o=N'7"'~0~F=-=p=R=o=A~L~E~M-~.---~DORIC POINT ?.02 INDICATES 14CI DEGREES 30 31

) 23 LOCAL PRIMARY CIRCUIT SET FOR 1&5 DEGREES 12 33 24 251-----------_-

__ :---,,------------.. ---------~c-A~U~S~E~.---~P~R~I~M~A~R~Y-C~A~P~I~L-A~R~Y~T~-u~B~E~I~S~B~R~O~K~E~.N~.------------------_,

34 35

) 2s, ORDERED PARTS FAR PRIMARY CIRCUIT.

  • ~' ! '.

36 37

--i:fATSEO-SETPOINT OF SECONDARY CIRCUIT BY 21,_ _______

~-~~~-----~~--~*-*-~-~-----~----

28 38 39 10 DEGREES.

) 29 30 40 31 91352&

- p.

DAMPER, 1CAA003 41 42 I

43 45 46 47 I,

32 u

DESCRIPTION OF PROBL~M, DAMPER WILL NOT OPEN AND

, 341-~-----~~-----'--~-------~------


~---*~sDTENO-:i:O-VA L vE-THATCIDJTROL S IT p 35 t S HOT.

48 49 SD

(

51 I 36f-------------------------------------...,...~~~~-~~~~~-.----.

............,.......... --...........--;-;....-....---------------------1 31 I H~EE OF FOUR LIMIT SWITCHES STICK ING.

b 38

.52 53 54 i 391------------------------C_ORRECTI VE ACT ION I 'o

~ 41 DISASSF.MRLED, CLEANED, AND LUBRICATED.

RE s ET s w n c H ---rn DI CIH ION POTNT s ~----------------------------,

TESTED SATISFACTORILY.

55 56 57 58 59 42 "f---------------------,-.--------------------------------------------------------1.

~ "

60 61 45

>-------------~~-~~-~----------------------*------------*-

---*-----*--~*-* *-***-**-----------------------------------i 46 62 (

63 64

~47

,.-.~-

48 o-~ (~?= ';-' *

-*. '(..

65 66 67 1-------------------,-,--,--'-"~--------------------

49

) 50 68 69 51 1---------------------------~--*-------------------------------- -- - --- ------------ ------------------------------------------------------i.

52

~ 53 54 70

(

55

) 56 57

~--~--~------------------------------------------------- --------

)

Page 13 of 18 71 72 73 74 r

75 76


*---~~

i' ~---~.------------------------------------------------ -- -.*---- ----- --


~

),; 6 1-1------------------------------------------------*--- -----------------

1 1

(

3 3 SORTED BY SALEM GENERATJNG STATION 4

DE p ART ME NT, WORK ORD (R NO. ---------5 AF (TY-kF-L-,, fED ___ E r.i u rF>*M E:r.fr wr'l i:fi< n RO ER Tor;*-- --- ***- - - - ---------------------- -- ----------- ---------------000 6 --------- 5 6

WORK ORDER

~ a NUMBER

  • DEPT EQUIPMENT IDENTIFICATION EXPLANATION nF WORK PERFORMED 6 *'

10 11 f------~-------------------------------~----------------**--***-*----.. *---*-*-*------------*--*-------------------------------------------------111 10

3

~ 11 q14688 P

PUMP, 13 AUXILIARY FEEDWATER

~

12 16 13

- n E SCRIP TI ON OF PROB L-EM,

_F_A_T_L--E-D--T-O-*G_E_T_R_U_N_L_I_G_H~T-O_N_T_E_S~T-R_U_N-.-----------------1 17 IR 19


~10 21 16 cAu__s_E_L _____ U_f.1J_T __ sJ1_r_r_c::_):!_o~_J5_TDM

  • INLF vAL'VE-Our OF ADJUSTMENT.

)

17 22 CORRECTIVE ACTION, ADJUSTED LIMIT SWITCH.

M 23 191---'--------,,---

__ -------,------,---.~~:~--,~-----~~-=-=:__:__;:;_:_;=-;_:__::__c_::_-=-:_:-'------'--':_::__::_c_:__:_::_=-=-=--=---'---=--~'-=-=-------~---------------j 15

~ 20 q146qS

,_ P RADIATION MONITOR, -R13E

~~

">------~-~--~----------.----~-------------~--~--~-~~--~~~~--~-~--~~-----------------

28 DESCRIPTION OF PROBLEM, 15 CONTAINMENT FAN COIL UNIT RADIATION n

11

)

13

_VALVE r i 3MS007

>-----------~

._', p-

) 32 CORRECTIVE ACTION, MONITOR IN ALARM.

~

~-~~~~~~-~~-~~~~~~--------------------i32

~PL ACED THE CHASSIS AND RATE DRAWER*

33 34 35


~-------------------<~~

38 39

  • IO
  • II 12 (

'3

~

CAUSE, REGULATOR DIAPHRAGM FAILED.

44

,.1---------------------~----------------------------------------- --


*---------------- 45

) 35 CORRECTIVE ACTION, REPLACED REGULATOR DIAPHRAGM.

46.*

4i

~.

36 48 37f-ooq~2~0~0~6~6-~-=p---=---,-,v=r=r~A~L----,-,H=E~A=T~T=R~A=c=E-,-_=o=r=R=c~u=r=T~7~0~1--=-&~7~0~6~----------------~-------------------------j,9 50 (

51 38 39 40 f-----~~------------


.&- ~:

DESCRIPTION OF PROALEM, BOTH HEAT TRACE CIRCUITS HAVE BROKEN


THERM6ti5Lii5LEs:------------~-------------------------------

,.,,.,{'

41 55 a

CORRECTIVE ACTION, REPLACED THERMOCOUPLES.

43f------------------.-.-------"--=_:_:_c__::_::'--'--':__:__:_:__-=--=-::_:_:_:_ ___

__:c_::_c::_::__:__:_=-_c:__:_c__-=-__::-,::__ _______________________

--157 44 q20679 P

INSTRUMENT, FA3165Z 45 60 46 nESCRlPfT(i"NOF-PRORLEM;-------No-FUfw nnYIEAfHiN FORN0;--1?. CONTAINMENT


t61

,-<"'} :. '~k~,,, _

FAN C 0 TL UN IT

  • 491----------------'::_'-------------------------------------------------------------i65 66 50

~

51 68

>-----------------*--------*----*-*------------*-------*---------~-------*---*--- --*-** -- -- ---- *-*----*- -***-----*--**----------** --- ----

~ :

=

I s4

~

55

)

56 57' 73

.J 76

~-------------------------------------------


*-----------~---*- *--- --

-***-~ ----- --**---*---------------------------*----------------------------

Page 14 of 18

I

l.

)

)

~

e e

e

)-;: 6 1

2 3 SORTED BY SALEM GENERATING STATION 4 DEPARTMENT, WORK ORDER NO.

SAFETY RTLATEO--ECfUIP.rAE-NT-*woRKORnER-COif __________

0007 5

6 WORK 7 ORDER 6

NUMBER DEPT EQUIPMENT IDENTtF!CATION F.XPLANATION OF WORK-PERFORMED 9

10 11

CAUSE, TRANSMITTER PLUGGED.

12 13 CORRECTIVE 'ACTION, UNPLUGGED,TRANSMITTER FA3165Z.

~'.i:ft~~~S"i:~;, ;

14 15 9206RO.

p

. INSTRUMENT,

./-f' 16

.-* ;!*;~-~J":'.f'.~~(:~)

-~': *.;* -~

SERVICE FLOW 17 M

DESCRIPTION OF PROBLEM, NO WATER INDICATION 'FOR 18 NO. 12 CONTAINMENT FAN COIL UNIT.

19

,\\ A-*:.~.--.**.,-,.,

!i 20 CORRECTlVE ACTION, REPLACED FLOW TRANSMITTER AND CALIBRATED.

. -~.: '*)' )

21 22 920726 p

INSTRUMENT, 1LCS27C 23 24 DESCRIPTION OF PROBLEM, WHILE PERFORMING PROCEDURE 1PD.2.2.0ll3 ON 25

. /-

GENERATOR LEVEL CANNEL IV, THE 26 12 STEAM 27

-). *"

~

28 TRIP POINT WAS FOUND TO BE LOWER THAN 29 TECHNICAL SPECIFICATION LIMITS.

30 31

'CAUSE, FAULTY POWER SUPPLY*, FOR. COMPARATOR CAUSING TRIPPOINT TO DRIFT TO 23.75 PE RC NT 32 33

\\

WHTCH IS.25 PERCENT BELOW TECH SPEC LIMIT 34 35 CORRECTIVE ACT ION, REPLACED CAPACITORS IN POWER SUPPLY.

36 37 920733, p*

,.,~

. INSTRUMENT;' lHCSOOA *AND fFISOOB **

38 39 DESCRIPTION OF PROBLEM, REPLACE MANUAL AUTO STATION.

40

---~rwrr cHfffG'.. ro -MAND AL OUTPUT SAT.

41 42 CORRECTIVE ACTION, REPLACED MANUA'L AUTO STATION ON lHCSOOA.

43 i*

INDICATOR FI SO OB WAS STICKING. IT WAS 44 REPLACED.

45


*----*--~--------*-*-***-*---*----- ------

46

  • 7
\\
:****

' -* *d ~

  • 0 49
(...

50 51 52 53 54 55'

  • ... -~-

56 Page:i5 57 of 18

---~--*---*--*---*-*

~

~

~

(

1 2 (

3 4

5 6

7 8

9 10 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

.52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76

~~" -------------------------------------*------

        • ---- ---- ------------------~----------==------- __

---_-~1 e

e e

  • -! ~

F.1-t-----,------:---::------------*---,----------

SORTED BY SALEM GENERATING-STATTON DEPARTMENT, WORK ORDER NO.

--sAF" E 'fY-R"fC.i f~o Trffffi'-ME N r- -wr1R-,(-*n-Ro-E'R L oG WORK 1 - ORDER 8 *NUMBER 10 11 92CJ894 12 13 14 15

  • DEPT
    • _ ;: ~E!WIP"1ENT 'roE:fliTIFICATION
  • t.

p VALVE, 14MS018

'("

l---'-----'--~~-'----"-'---"'-'---'-----'--'~~"""-'-'-~"-=~---'-'---'--------------'-

16

CAUSE, 17

~.,. '* '

EXPLANATION OF WORk

-~R~bRMED 00011 1

-a
  • 3 4

1 10 11 12 13 14 15 16 17 18 19 20 21 22 23 16 tORRECTIVE ACTION, REPLACED SOLENOID ~ALVE.

101-:-:*-;:-;---::---,---_-__ 7_~_-_~:~7;;-:~;"*--,--,7.;---,-_-_--,--,~._--".. ~.--::-.-0--:-7:i-i;-7,,--,---,..-,,~.-,~~-:-cc-:=-:::;_;_:_:._:=--=:-_:_::_-.::_::::_,,--:_:_::,,:-__=.~~,.-----,--'-=~~:.:..c:::.:::.::___::_:::=.::::..:..:~_::___-T-c,.~~<~'-~-:-=--='--------'---.--~;,~-.~---,--~--------,~------,---,--jl..

I~

TOTAL'i'r,NES
  • '~~!Jo'oiSLI

.(

'\\_-,*:

26 27 26 29 221--::T=-:O=-:T~A~Lc---~A~-=R=E=c=s-=~0~0~0~0~3=3,--'-~--"------'--------~~--~~-----------------~-------~------------------1 25 "800605 08ll0ll6,-.

27 ENTER COMMANDS 26r-:E=-:N:-;-D=--=oc::F:--:R=-:U:-;-N~--'-~~-~~~-'----~-'--'--'----'--~-------'----'--'-'-'--'----* -------------~ -------*---~--------~-------------------<

29 30 31 mBRKPT* *PRI NT!I*_>,* \\

30 31

'2 33 34 35 36 37 38 39 40 41 42 43

  • . 32

~

c. '., *. **~
  • ~,

33 44 34 45 35 46 47 36 46 37 49 38 50 51 -

52 53 54-55 39 40 I 41 42 56

43.

57

\\ 44 56 59 60 61 45 46 !-------~----------_--_*'.:-'-'. ;.~--'--'---'-\\**-=-~*"'--**-*------------..:...-~~----~*--*-*-*~-* -- ---* -**-**-***-*--* -* --***.... ---**----.------

62 63

_, 47 46 64 t---~-----------------'~~----------------------------------------------------------------------1 65

49.

50 51

---~-------------------------------*---------------------------

52 53 54 1-~--,--------------------------------------------------------------

55 f-' 56 57 Pag*e 16 of* 18 66 67 68 69 70 71 72 73

. 74 75 76 r

(

(

5/1 thru 5/10 5/11 thru 5/12 5/13 SALEM UNI:I' Ill OPERATING

SUMMARY

MAY 1980 Stabilized at 100% load.

At 1800 on May 11, started reducing load down to 65% to clean heater drain pump strainers."

At 0400 on May 12, a load increase was begun.

Load increased to 100% by 1800 on May 12.

thru Load stabilized at 100%

5/15 5/16 At 2200 on May 16, a load reduction began at approximately thru 15% per hour because of a ruptured RCS sample line, The sample 5/17 line was isolated and a load increase form 69% began.

Load reached 100% at 1300 on May 17, and remained there for the rest of the period.

5/18 thru Load stabilized at 100%.

5/22 5/23 Reactor tripped at 1954.

Surveillance testing of feed regulatory valves (operating valves in manual control).

Controller was faulty.

Tripped on low steam generator level.

5/24 Reactor went critical at 1730 and when it reached 3.6% power the reactor tripped on low steam generator level.

5/25 Started escalating power and reached 100% at 0200 on May 26.

Load thru remained at 100% for the rest of this period.

5/31 Page 17 of 18

~UELING INFORMATION May 1980 DOCKET NO.:

50-272.

~~~-~~-~

UNIT:

Salem Ill DATE:

Jun.e 10, 1980 COMPLETED BY: L

  • K. Miller TELEPHONE: 609-365-7000 X507
1.

Refueling information has changed from last month:

YES NO x

2.

Scheduled date of next refueling:

September 20, 1980

3.

Scheduled date for restart fallowing refueling:

December 7, 1980

4.

A.

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO-DATE May 1980

~-~~-~---

B.

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO x

If no, when is it scheduled?

August 1980

~~-~~-~~-~~-~~~~~--

5.

Scheduled date(s) for submitting proposed licensing action:

September 1980 (If Required)

6.

Important licensing considerations associated with refueling:

NONE

7.

Number of Fuel Assemblies:

A.

In-Core 193 B.

In Spent Fuel Storage 40

8.

Present licensed spent fuel storage capacity:

264 Future spent fuel storage capacity:

1,170

~~-~~-~~~-~--

9.

Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

September 198:2.

Page 18 of 18 8-l-7.R4