Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required
ML18081A596
Person / Time
Site: Salem 
Issue date: 11/09/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
References
NUDOCS 7911270202
Download: ML18081A596 (4)


Text

I l UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-272 NOV 0 9 1979 Public Service Electric and Gas Company ATTN:

Mr. F. W. Schneider Vice President - Production 80 Park Place Newark, New Jersey 07101 Gentlemen:

This Information Notice is provided to inform licensees of a possible significant matter. It is expected that recipients will consider dissemination of the information to all persons working at their licensed facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have any questions regarding this matter, please contact this office.

Enclosures:

~J;p~

~

Boyce H. Grier

{'-Director

1.

IE Information Notice No.79-12A

2.

List of IE Information Notices Issued in the Last Six Months CONTACT:

J. W. Devlin (215-337-5225) cc w/encls:

F. P. Librizzi, General Manager - Electric Production E. N. Schwalje, Manager - Quality Assurance R. L. Mittl, General Manager - Licensing and Environment

  • H. J. Midura, Manager - Salem Generating Station

ENCLOSURE 1 SSINS No.:

6300 United States

  • Accession No.:

Nuclear Regulatory Commission

  • 7910250490 Office of Inspection and Enforcement

_Washington, D.C.

20555 ATIEMPTED DAMAGE TO NEW FUEL ASSEMBLIES IE.Information Notice No.79-12A Date:

November 9, 1979 Page 1 of 1 This notice provides supplemental information concerning the identification and conviction of the persons responsible for the introduction of a possibly damaging substance to the new fuel stored at the Virginia Electric and Power Company 1 s Surry Power Station in Surry County, Virginia.

Investigation of this incident by the FBI culminated in the surrender of William E. Kuykendall and James A. Merrill, Jr., both VEPCO employees at that. -

time, to Surry County authorities on June 19, 1979.

A Grand jury hearing was held in Surry, Virginia on July 24, 1979.

The certified charges of breaking and entering with intent to damage electrical fai::ilities (felony), and willful destruction of utility company equipment (felony) were returned on a true bill for trial.

An earlier charge for willful damage (mis- _

demeanor) which had not been certified to*the grand jury was reapplied, certified and returned on a true bill for trial.

Two additional charges against both men were introduced for conspi ra_cy regarding the two felonies and returned on a-true bill for a total of four felonies and one misdemeanor against each man.

Trial commenced on October 10,, 1979 in the Circuit Court, Surry County, Virginia.

The presiding judge ruled that the prosecution failed to supply sufficient evidence to support the charges of consp.i racy, breaking and entering, and damage to property as a misdemeanor.

The primary reason for dropping the charges-was that the subjects had been authorized unescorted access to Vital Areas by VEPCO.

On October 17,. 1979, the jury returned a verdict of guilty

_(both Kuykendall and Merrill) for violation of Virginia Code 18.2-162 (intentional damage to a facility which furnishes electric service to the public) and set punishment as two (2) years in the State Penitentiary for both subjects, the minimum sentence provided by law.

This Information Notice is provided to inform licensees of a possibly significant matter. It is expected that recipients will consider dissemination of the information to all persons working at their licensed facilities. If you have questions regarding this matter, please contact the Director of the appropriate NRC Regi.onal Office.

No written response to this Information Notice is required.

Information Notice No. 79-12 79-13 79-14 79-15 79-16 79-17 79-18 ENCLOSURE 2 IE Information Notice No.79-12A Date:

November 9, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN THE LAST SIX MONTHS Subject Attempted Damage to New Fuel Assemblies

. Indication of Low Water Level in the Oyster Creek Reactor Sqfety Classification of Electrical Cable Support Systems.

Deficient Procedures Nuclear Incident at Three Mile Island Source Holder Assembly Damage from Misfit Between Assembly and Reactor Upper Grid Plate Skylab Reentry Date Issued to Issued 5/11/79 All Fuel Facilities, Research Reactors, and Power Reactors with an OL or CP 5/29/79 All power reactor facilities with an OL or CP 6/11 /79 A 11 app 1 i cants for, and holders of a power reactor CP

  • 6/7/79 All power reactor facilities with an OL or CP 6/22/79 All research and test reactors with an OL 6/20/79 All holders of reactor OLs and CPs 7/5/79 All holders of reactor OLs

-~--

e IE Information Notice No.79-12A Date:

November 9, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To I

Notice No.

Issued I

I 79-19 Pipe Cracks in Stagnant 7/17/79 All power reactor Borated Water Systems at facilities with an PWR Plants OL or CP 79-20 NRC Enforcement Policy -

8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and CPs and Production Licensees with Licensed Operators 79-20 Same Title as 79-20 9/7/79 Same as 79-20 (Revision No. 1) 79-21 Transportation and Com-9/7/79 A 11 power and research

  • mercial Burial of Radio-reactors with OLs active Material 79-22 Qualification of Control 9/14/79 All power reactor faci-Systems lities with an OL or CP 79-23 Emergency Diesel Generator 9/26/79 All power reactor faci-Lube Oil Coolers lities with an OL or CP 79-24 Overpressurization of Con-10/1/79 All power reactor faci-tainment of a PWR Plant lities with an OL or CP After a Main Steam Line Break 79-25 Reactor Trips at Turkey 10/1/79 All Power Reactor Faci-Point Unit 3 and 4 lities with an OL or CP 79-26 Breach of Containment 11/5/79 All Power Reactor Facilities Integrity with an OL or CP