Immediate Action Ltr 79-16 Stating Actions to Be Taken by Util,Based on 791101 Telcon Re safety-related Valve Lineups & Valve status.Valve-related Sys Should Be Verified. Personnel Should Be Aware of Valve Status
ML18081A574
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/01/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
References
IAL-79-16, NUDOCS 7911230206
Download: ML18081A574 (2)


Text

UNITED STATES

  • NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-272 IAL No. 79-16 NOV 1 1979 Public Service Electric and Gas Company ATTN:

Mr. F. W. Schneider Vice President - Production 80 Park Place Newark, New Jersey 07101 Gentlemen:

This refers to a conversation between Mr. Leif J. Norrholm, NRC Resident Reactor Inspector, SNGS, and Mr. H. Midura of your staff on November 1, 1979, regarding safety-related valve lineups and valve status at Salem Unit 1.

With regard to the matters discussed, we understand that you will take the following actions:

a.

Prior to achieving Mode 4, Hot Shutdown, in preparation for Salem Unit l reactor startup, conduct a complete valve lineup, and independent verification of the following systems:

Safety Injection Chemical and Volume Control System Residual Heat Removal System Component Cooling Service Water (Nuclear)

Containment Spray Diesel Generator Air and Fuel Oil Systems Auxiliary Feedwater Reactor Coolant Control Air Chilled Water

b.

Prior to achievfng Mode 4, Hot Shutdown, in preparation for Salem Unit l reactor startup, establish positive measures to ensure that all station personnel with access to safety-related areas are aware of station require-ments relative to valve status and valve operation.

c.

Within 30 days of receipt of this letter, re-examine and/or strengthen the controls established to maintain proper valve alignment, to assure proper valve realignment, in the event valve manipulation is required, and to preclude unauthorized valve positioning during the period between formal system valve lineups.

d.

Promptly notify this office upon completion of the actions specified in each of a., b., and c. above.

Public Service Electric and Gas Company 2

NOV 1 1979 If our understanding of your planned actions as described above is not in accor-dance with the actual plans and actions being implemented, please contact this office immediately.

cc:.

Sincerely, "2pdk-f (O~yce H. Grier Director F. P. Librizzi, General Manager - Electric Production E. N. Schwalje, Manager - Quality Assurance R. L. Mittl, General Manager - Licensing and Environment H. J. Midura, Manager - Salem Generating Station