Thomas J. Martin Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Engineering and Construction October 31, 1979 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
NRC IE BULLETIN NO. 79-14, SUPPLEMENT 2 NO. 2 UNIT SALEM GENERATING STATION In response to your letter of September 7, 1979, transmitting NRC I&E Bulletin 79-14, Supplement 2, which was received on September 10, 1979, the attached report summarizing the results of the stress walk conducted to date, and the proposed schedule for completion, is hereby submitted for your review.
If you require additional information, we will be pleased to discuss it with you.
Very truly yours, Attach.
CC:
Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
Office of Nuclear Reactor Regulation Division of Operating Reactors Washington, D.C.
Mr. L.J. Norrholm Hancocks Bridge, N.J.
A
REFERENCES:
NRC BULLETIN I&E 79-14, dated July 2, 1979 Rev. 1, dated July 18, 1979 Supplement 1, dated August 15, 1979 Supplement 2, dated September. 7, 1979 SEISMIC ANALYSIS OF 11AS BUILT" SAFETY RELATED PIPING SYSTEMS SALEM NO. 2 UNIT The foll6winq safety related piping systems h~ve been inspe6ted on Salem No. 2 Unit in accordance with NRC I&E*Bulletin No. 79-14:*
Reactor Coolant System Safety Injection System Steam Generator Feedwater (Inside Containment)
Component Cooling System Main.Steam (Inside Containment)
Chemical and Volume Control System Steam Generator Drains and Blowdown Residual Heat Removal System.
The following Engineering Change Notices (ECN's) have been issued and implemented since the.inspecti?n:
System Reactor Coolant System Main Steam (Partial} '.
Chemical and Volume Control Residual Heat Removal.).
Safety* Injection
)
Component Cooling Steam Generator Feedwater ECN's
- 10.
9 36 38 49 1
- -Steam Generator Drai*n and Blowdown 6
In addition, the above Seismic I safety related sy~tem~ were functionally checked during a Hot Functional Test in November/.
December~ 1978.
'I I
I I
I I
I i i
I I
I I
I I.
i I
l I I l
NRC BULLETIN I&E 79-14 Salem No. 2 Unit The following systems are scheduled to be inspected starting the week of November 5, 1979:
Steam Generator Feedwater (Balance)
Service Water Auxiliary Feedwater Containment Spray Main Steam (Balance)
Chilled Water Control Air-Diese~ Oil and Starting Air
- spent Fuel Cooling It is anticipated that the above mentioned systems will be in-spected and any necessary modifications completed by January 15, 1980.
RCK:rl 10/31/79